You are on page 1of 7

1.

2.

(Surface seep)





(Seismic Surveys)

(Seismic Surveys)








()



(Geophone) 1224 (Geophone Array) 1-5

48-120 5






(Data Processing)
(Seismic Section)

(Data interpretation)



DGPS

( -)
510

-



3.

The hoisting equipment


consists of:

derrick

a crown block,
a traveling block,
drilling line,
and a drawworks to
pull the drilling line up
or down.
substructure
Drill string
Drill bit

spare drill pipe

1. (Derrick)


2. (Drill Bit)

-
1. (Land Based Drilling Rigs)



2. (Slim Hole Drilling Rig)

18 6
75 %



3. (Coiled Tubing Drill Rig)







4. (Jackup Drill Rigs)

300
5. (Semi-Submersible Rigs)

300
6. (Drill Ship)




10000

Land Rig

For drilling on land.

3 Land Based Drilling


Rigs

4 Jackup Drill Rigs


Drill Ship

5 Drill Ship

Semi-Submersible Rig

6 Semi-Submersible
Rigs

You might also like