Professional Documents
Culture Documents
การประกันคุณภาพในช่วงการผลิต 2
การประกันคุณภาพในช่วงการผลิต 2
255323
2
.....
( Quality Characteristics)
variables (continuous)
Variable control charts (
)
attributes
(discrete)
Attribute control charts (
(
Variable control charts
- Quality characteristic
- Central tendency ( ) (e.g. mean)
- measure of variability () (e.g. R or SD)
- X R Chart, X S Chart
and R
X chart ()
R Chart
()
+3
-3
0 997 (99.73%)
(99 73%)
x 2 x
0.9545 (95.45%)
x 1 x
0.6826 ((68.26%))
- The # of items between 3 = 99.73%
- It is expected that over 997 times out of 1000,
1000 the subgroup
values will fall between the upper and lower limits, and when
this occurs, the process is considered to be in control.
Average
range
Phase
ase I Application
pp cat o oof x aandd R CCharts
a ts
m subgroups
20-25 subgroups
g p
subgroup (sample size, n) 3 5
Trial
T i l control
t l lilimits
it
out-of-control
assignable causes
assignable causes
trial control limits
out of control control
charts
control charts
control11 charts out of control
(N
(Note
t
in
i control
t l
out of control
assignable causes trial control
limits )
in control
control limits
assignable
g
causes , 2
1.
2. control limits
-25 samples,
each of size 5
-time between
subgroup = 1hr
13
R
chart control limits
on the X chart process
variability process
variability in
control X chart
control,
25,50 or 100
samples
Out of control
((Douglas
g C. Montgomery,
g y, 2005))
- R chart
- R chart out of control assignable
cause R
- R control limits X R chart
- out of control
assignable cause
subgroup
Specification limits
qualityy
characteristic
x R Charts
R chart
in control
(( assignable
g
causes R chart )
Cyclic patterns
x chart
h t
(operator fatigue)
( regular rotation of
operators/mc)
R chart
(maintenance schedules),
(operator fatigue)
Mixture
control limits ,
center line
2
overcontrol
overcontrol
(
(process
adjustment)
dj t t) ,
Shift in process
level
Trend
(operator fatigue)
(Seasonal influences)
Stratification
control charts
1
5
X-chart
X h andd MR
MR-chart
h
Sample size, n = 1
-
-
-
continuous process
C t l chart
Control
h t ffor iindividual
di id l
31
(X-chart)
(MR-chart)
(Process standard deviation)
MR
=
d2
n = 2, d2 = 1.128
(
(
specification)
ifi ti )
Cp, Cpkk
In control
Process Capability
The uniformity of the process
The true process capability cannot be determined until the
pprocess is in control.
Process capability = 6
can be obtained from control charts
Cp 1.33
Assume that
processed is centered
p of the
at the midpoint
specification band.
43
If Cp = 1.00
2 process capability is
equal to tolerance
Cp > 1.00 1 process capability is less
than tolerance (Most wanted!)
Cp < 1.00
3 process capability is
greater
t th
than ttolerance
l
- Cp process is centered.
( process mean
specification
ifi ti (nominal))
( i l))
-
spread of specification
6
spread in the process
-Cp doesnt measure process performance in terms of the
nominal or target value.
(Process potential
capability)
7-5 strength
PCR (one
(one sided)
1.45
quality characteristic
Variable control charts (
)
(Continuous Value)
Attribute control charts ()
(Discrete Value)
quality characteristic
/
(C f i /
(Conforming/nonconforming)
f i )
Go no go gage
spec
Go
no go gage is on left, finished
59
part to be checked is on right
np Chart, p Chart
p Chart
(p
(proportion)
p
)
(sample or subgroup)
np Chart
(# nonconforming)
p Chart np Chart
p Chart
() ,
1.
R (or S) Chart (
)
(Variables)
x Chart ()
2. np Chart ( )
(Attributes)
p Chart ( )
c Chart ()
u Chart ()
p Chart
p Chart
(proportion)
(sample or subgroup)
20, 50, 100 )
(D)
p-chart
p-chart quality characteristics
Trial central line and
control limits (3 control limits)
LCL
0
c Chart, u Chart
(Defects)
1
c Chart
(count of nonconformities (defects))
u Chart
(count of nonconformities per unit)
c Chart u Chart
u Chart
Poisson distribution
c-chart
Subgroup size
= 1 inspected unit,
unit
subgroup 25
1 inspected unit =
1000 feet
f 2
LCL 0
Inspection unit
subgroup
n =1 Inspection unit = 100 boards
1 Inspection unit = 250 boards 2.5
(n =2.5 Inspection units )
Control limits
nc 3 nc
CL = (2
(2.5)(19.67)
5)(19 67) = 49.18
49 18
Control limits = 49.18 3 49.18
LCL = 28.14, UCL = 70.22