Professional Documents
Culture Documents
DRAINAGE LEGEND
A 27-05-2011: Plans altered to match First Floor Blockwork and contractor's proposed wall build up detail B 30-05-2011: SVP drop from main bathroom indicated on the ground floor plan & GD 11 moved C 27-07-2011: Wall to the Plant room changed to stud wall and note added. Extra duct from the Garage to the Utility Room. GS01 & GD02 are omitted. Wall at downstairs WC changed to 215mm and toilet & stairs moved south to accommodate the above change.
Ex.GD 04 5330
GW 11
GW 09
4550
ALL WORK TO COMPLY WITH THE 1991/ 1997/ 2000/ 2002 BUILDING REGULATIONS. ALL DIMENSIONS TO BE VERIFIED AND CHECKED ON SITE
1715
675
1110 1260
2000
2125 4750
3435
900
2920
2920
McMAHON CONROY ARCHITECTS THIS DRAWING AND ANY DESIGN HEREON IS THE COPYRIGHT OF THE ARCHITECTS AND MUST NOT BE REPRODUCED WITHOUT THEIR WRITTEN CONSENT. ALL DRAWINGS REMAIN THE PROPERTY OF THE ARCHITECTS.
4435 2000
4535
700
1450
Ex.GD 03
1800
835 3635
1415 366
900 365
1475
1515
900
2600 1423 1800 2462 1450 900 442 4492 2289 3150 1300 1000 GW 13
675
4503
GW 07
2049
GW 08 1225
599
900
1921
6500
1951
6485
1450
650
700
1100
900
1100
900
1137
692
1100
900
1100
700
P r o j e c t.
GW 04
6930
4536 GW 12
4503 GW 03
4975 GW 02 675
4976 GW 14
GW 01
D r a w i n g T i t l e.
Ex.GD 01
D r a w n.
S c a l e.
Checked.
D a t e.
M.C.
1 : 50
20-04-2010
A
CONTRACT DRAWING
Signed: ______________ Signed: ______________ Date: __/08/2011 Date: __/08/2011
McMAHON CONROY Architects and Fire Consultants 3rd Floor, Chapel House, Cathedral Place, Limerick. Tel: 061-413899; Fax: 061-413897 Email: info@mcmahonconroy.com
P r o j e c t N u m b e r. D r a w i n g N u m b e r.
09-17
C-02C