BECHTEL PLANT DESIGN & PIPING ENGINEERING DESIGN GUIDE FOR EQUIPMENT NOZZLE LOCATIONS 3DG P22 002,

Rev. 00, 08/92 Prepared by: Bob Tarr Approved by: E.F. Bausbacher

TABLE OF CONTENTS Page No.

LIST OF FIGURES LIST OF EQUIPMENT 1.0 PURPOSE

2 3 4

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 1 OF

LIST OF FIGURES

Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9

Centrifugal Pump - Electric Motor Centrifugal Pump - Turbine Drive Shell and Tube Exchanger Shell and Tube Exchanger Shell and Tube Nozzle Arrangements Shell and Tube - Kettle Type, Nozzle Arrangements Shell and Tube - Vertical Reboiler Double Pipe Exchanger Air Cooled Heat Exchanger

Figure 10 Horizontal Drum Figure 11 Vertical Reactor - High Pressure Figure 12 Spherical Reactor Figure 13 Horizontal Reactor Figure 14 Fractionation Tower - Internal Details Figure 15 Fractionation Tower - Typical Orientation Figure 16 Vessels - Motor/Agitator Figure 17 Furnace - Box Type Figure 18 Furnace - Cylindrical Figure 19 Reciprocating compressors Figure 20 Centrifugal Compressors - Horizontal/Vertical Split Case Figure 21 Centrifugal Compressors - Steam Turbine

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 2 OF

LIST OF EQUIPMENT

Page No. 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 2.1.11 2.1.12 2.1.13 2.1.14 2.1.15 2.1.16 2.1.17 2.1.18 2.1.19 2.1.20 Centrifugal Pump - Motor Drive Centrifugal Pump - Turbine Drive Shell and Tube Exchangers Shell and Tube Exchangers Kettle Type Exchangers Shell and Tube - Vertical Reboiler Double Pipe Exchangers Air Cooled Heat Exchanger Horizontal Drum Vertical Reactor - High Pressure Reactor - Spherical - Horizontal Fractionation Towers Fractionation Towers Fractionation Towers Vessels - Motor/Agitator Furnace - Box Type Furnace - Cylindrical Reciprocating Compressors Centrifugal Compressors Centrifugal Compressors - Steam Turbine 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 3 OF

1.0

PURPOSE This design guide is intended to highlight criteria to be considered when establishing equipment nozzle locations. Where options do exist, the piping designer must make the final decision based upon the circumstances at hand. This guide is not intended to address normal piping issues as they are to be covered in the respective guides for each equipment item.

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 4 OF

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 5 OF

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 6 OF

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 7 OF

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 8 OF

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 9 OF

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 10 OF

10

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 11 OF

11

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 12 OF

12

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 13 OF

13

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 14 OF

14

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 15 OF

15

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 16 OF

16

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 17 OF

17

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 18 OF

18

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 19 OF

19

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 20 OF

20

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 21 OF

21

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 22 OF

22

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 23 OF

23

O:\WINWORD\3DG\P22\002-00.DOC

PAGE 24 OF

24

You might also like