Professional Documents
Culture Documents
Bechtel Plant Design & Piping Engineering Design Guide For Equipment Nozzle Locations
Bechtel Plant Design & Piping Engineering Design Guide For Equipment Nozzle Locations
Rev. 00, 08/92 Prepared by: Bob Tarr Approved by: E.F. Bausbacher
2 3 4
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 1 OF
LIST OF FIGURES
Centrifugal Pump - Electric Motor Centrifugal Pump - Turbine Drive Shell and Tube Exchanger Shell and Tube Exchanger Shell and Tube Nozzle Arrangements Shell and Tube - Kettle Type, Nozzle Arrangements Shell and Tube - Vertical Reboiler Double Pipe Exchanger Air Cooled Heat Exchanger
Figure 10 Horizontal Drum Figure 11 Vertical Reactor - High Pressure Figure 12 Spherical Reactor Figure 13 Horizontal Reactor Figure 14 Fractionation Tower - Internal Details Figure 15 Fractionation Tower - Typical Orientation Figure 16 Vessels - Motor/Agitator Figure 17 Furnace - Box Type Figure 18 Furnace - Cylindrical Figure 19 Reciprocating compressors Figure 20 Centrifugal Compressors - Horizontal/Vertical Split Case Figure 21 Centrifugal Compressors - Steam Turbine
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 2 OF
LIST OF EQUIPMENT
Page No. 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 2.1.11 2.1.12 2.1.13 2.1.14 2.1.15 2.1.16 2.1.17 2.1.18 2.1.19 2.1.20 Centrifugal Pump - Motor Drive Centrifugal Pump - Turbine Drive Shell and Tube Exchangers Shell and Tube Exchangers Kettle Type Exchangers Shell and Tube - Vertical Reboiler Double Pipe Exchangers Air Cooled Heat Exchanger Horizontal Drum Vertical Reactor - High Pressure Reactor - Spherical - Horizontal Fractionation Towers Fractionation Towers Fractionation Towers Vessels - Motor/Agitator Furnace - Box Type Furnace - Cylindrical Reciprocating Compressors Centrifugal Compressors Centrifugal Compressors - Steam Turbine 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 3 OF
1.0
PURPOSE This design guide is intended to highlight criteria to be considered when establishing equipment nozzle locations. Where options do exist, the piping designer must make the final decision based upon the circumstances at hand. This guide is not intended to address normal piping issues as they are to be covered in the respective guides for each equipment item.
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 4 OF
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 5 OF
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 6 OF
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 7 OF
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 8 OF
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 9 OF
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 10 OF
10
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 11 OF
11
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 12 OF
12
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 13 OF
13
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 14 OF
14
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 15 OF
15
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 16 OF
16
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 17 OF
17
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 18 OF
18
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 19 OF
19
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 20 OF
20
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 21 OF
21
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 22 OF
22
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 23 OF
23
O:\WINWORD\3DG\P22\002-00.DOC
PAGE 24 OF
24