GENERALIDADES

A.1

RESIDENTE DE OBRA
Especialidad
CIP
Direccin

Victor Manuel Blanco Leiva


Ingeniero Civil.
18812
Jr Augusto B Leguia N 596 Cajamarca

A.2

FECHA DE INICIO DE OBRA

05 de Diciembre del 2012

A.3

DATOS DEL PROYECTO


Contratista
Obra
Fuente de Financiamiento
Sistema de Contratacion

A.5

A.6

A.7

A.8

A.9

PRESUPUESTO
I. Infraestructura
Costo Directo
GASTOS GENERALES VARIABLES
GASTOS GENERALES FIJOS
UTILIDAD
SUBTOTAL
IGV
PRESUPUESTO TOTAL

ICSA CONSTRUCTORES SRL


"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE
DE BAOS DEL INCA''

Canon, Sobrecanon y Regalias Mineras


Precios Unitarios

: S/.
: S/.
: S/.
: S/.
: S/.

: S/.

4,121,402.58
3,058,418.61
275,257.67
6,116.84
152,920.93
3,492,714.05
628,688.53
4,121,402.58

FINANCIERO
Presupuesto Base
Presupuesto Ejecutado Mes Anterior (Acumulado)
Presupuesto Ejecutado Mes de Diciembre 2012
Presupuesto Ejecutado Acumulado
Saldo Presupuesto Base

: S/.
: S/.
: S/.
: S/.
: S/.

4,121,402.58
0.00
246,604.88
246,604.88
3,874,797.70

0.00
5.98
5.98
94.02

%
%
%
%

VALORIZACIONES
Valorizacin Mensual (acumulado) Costo Directo
Valorizacin Mensual Costo Directo
Valorizacin Acumulada
Valorizacin Saldo Costo Directo

: S/.
: S/.
: S/.
: S/.

0.00
183,001.05
183,001.05
2,875,417.56

0.00
5.98
5.98
94.02

%
%
%
%

3,333,676.28

chequear: Acuerdo al
inicio de obra

CRONOGRAMA DE OBRA REFORMULADO


Inicio
:
Programado :
Termino
:

12/5/2012
150 dias (Segn Expediente Tecnico)
6/3/2013

UBICACIN
Distrito
Provincia
Departamento
Region

: LOS BAOS DEL INCA


: CAJAMARCA
: CAJAMARCA
: CAJAMARCA

1,413,027.45

VALORIZACION N 01
AVANCE FISISCO DE LA OBRA
0
Proyecto:

"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE


Departamento
BAOS DEL INCA''

: CAJAMARCA

Ejecucin:

ICSA CONSTRUCTORES SRL

Provincia

: CAJAMARCA

Modalidad:

Precios Unitarios

Distrito

Item

Descripcin

01.00 OBRAS PROVISIONALES


01.01 CARTEL DE OBRA (1.80X3.60 m)
01.02 ALMACEN Y GUARDIANIA
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

Und

: LOS BAOS DEL INCA

Metrado

METRADOS EJECUTADOS
ANTERIOR

ACTUAL

ACUMUL.

% AVAN.

SALDO

0.00
und
Glb
Glb

1.00
1.00
1.00

1
0.5

02.00 CONSTRUCCION DE CALZADA VEHICULAR

0.00

0.0%

1
0.5

1
0.5

0.00

0.00

0.0%
0.0%
0.0%

0.00

15791.39
16.26
2.28

0.636773219
1
1

9007.69

02.01 OBRAS PRELIMINARES


02.01.01 TRAZO, NIVELES Y REPLANTEO
02.01.02 DEMOLICION DE PAVIMENTO
02.01.03 ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE

m2
m2
m3

24,799.08
16.26
2.28

15791.39
16.26
2.28

02.02 MOVIMIENTO DE TIERRAS


02.02.01 CORTE A NIVEL DE SUBRASANTE CON MAQUINARIA
02.02.02 CORTE A NIVEL DE SUBRASANTE MANUAL
02.02.03 RELLENO CON MATERIAL PROPIO
02.02.04 ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA
02.02.05 NIVELACION Y COMPACTACION DE SUB RASANTE - MAQUINARIA
02.02.06 MEJORAMIENTO DE SUBRASANTE CON OVER T.M 6" (Ext, Riego y Comp.)
02.02.07 CONFORMACION DE SUB BASE GRANULAR (Ext. Riego Y Comp.) E=0.20M
02.02.08 CONFORMACION DE SUB BASE GRANULAR E=0.15m, (Ext. Riego Y Comp.)

m3
m3
m3
m3
m2
m3
m2
m2

16,290.54
805.05
154.74
18,568.97
20,547.89
1,226.93
20,547.89
20,547.89

9168.53
290.12

9168.53 0.5628131419
290.12 0.360375132

10655.86

10655.86 0.5738530462

02.03 EMBLOQUETADO DE CALLES CON ADOQUINES DE CONCRETO


COLOCACION DE ADOQUIN DE CONCRETO 20X10X8 CM VEHICULAR, COLOR GRIS
02.03.01 CLARO
COLOCACION DE ADOQUIN DE CONCRETO 20X10X6 CM VEHICULAR, COLOR GRIS
02.03.02 CLARO

0.5

0.00
0.00

0.0%

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

7122.01
514.93
154.74
7913.11
20547.89
1226.93
20547.89
20547.89

0.0%
m2
m2

9,200.47
10,226.20

0.00

0.0%

0.00

0.0%

9200.47
10226.2

0.0%

03.00 CUNETAS
14.51
2.03

1
1

0.00
0.00

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

3351.54
4589.29
447.8
1216.12

169.13
18.15
29.79

0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

169.13
18.15
29.79

221.30

0.00

0.0%
0.0%

221.3

m2
m2
m3

6,209.17
790.42
156.27

0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

6209.17
790.42
156.27

04.02 MOVIMIENTO DE TIERRAS


04.02.01 EXCAVACION A NIVEL DE SUB RASANTE MANUAL (h=0.15m)
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL/VOLQUETE 6 M3, D=10KM APROX.
04.02.03 NIVELACION Y COMPACTACION DE SUBRASANTE MANUAL
04.02.04 NIVELACION Y COMPACTACION BASE GRANULAR-MANUAL (E=0.15m)

m3
m3
m2
m2

1,663.81
2,003.69
6,303.75
6,303.75

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

1663.81
2003.69
6303.75
6303.75

04.03 OBRAS DE CONCRETO SIMPLE


04.03.01 LOSA DE CONCRETO DE F'C=140 KG/CM2, E=4" EN VEREDAS
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS Y SARDINELES
04.03.03 CONCRETO f'c=140 Kg/cm2, E=4" SARDINEL

m2
m2
m3

5,822.96
1,175.62
176.53

0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

5822.96
1175.62
176.53

04.04 JUNTAS
04.04.01 JUNTAS DE DILATACION EN VEREDAS

2,344.25

0.00

0.0%
0.0%

2344.25

234.53

03.01 DEMOLICION DE CUNETAS


03.02 ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE
03.03 CONFORMACION Y REFINE BASE
03.04 CONCRETO EN CUNETAS F'C=140 KG/CM2 E=0.10M
03.05 ENCOFRADO Y DESENCOFRADO NORMAL EN CUNETAS
03.06 JUNTAS DE DILATACION EN CUNETAS

m2
m3
m2
m2
m2
m

14.51
2.03
3,351.54
4,589.29
447.80
1,216.12

03.07 CONSTRUCCION DE BADENES E=0.10 M


03.07.01 TRAZO, NIVELES Y REPLANTEO EN CUNETAS
03.07.02 LOSA DE CONCRETO DE F'C=140 KG/CM2, E=0.10m
03.07.03 ENCOFRADO Y DESENCOFRADO DE BADEN

m2
m3
m2

03.08 COLOCACION DE REJILLA


03.08.01 SUMINISTRO Y COLOCACIN DE REJILLA DE FIERRO LAMINADO

04.00 VEREDAS Y SARDINEL


04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO, NIVELES Y REPLANTEO
04.01.02 DEMOLICION DE VEREDAS
04.01.03 ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE

14.51
2.03

05.00 SARDINELES DE JARDINES


05.01 TRABAJOS PRELIMINARES
05.01.01 TRAZO, NIVELES Y REPLANTEO.

m2

234.53

0.00

0.0%
0.0%
0.0%

05.02 MOVIMIENTO DE TIERRAS


05.02.01 EXCAVACION A NIVEL DE SUB RASANTE MANUAL (h=0.20m)
05.02.02 ELIMINACION DE MAT. VEREDAL MANUAL / VOLQUETE 6 m3, D=10Km Aprox.

m3
m3

8.96
11.21

0.00
0.00

0.0%
0.0%
0.0%

8.96
11.21

05.03 OBRAS DE CONCRETO SIMPLE


05.03.01 CONCRETO f'c= 140 Kg/cm, SARDINEL DE JARDIN
05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS Y SARDINELES

m3
m2

13.11
208.56

0.00
0.00

0.0%
0.0%
0.0%

13.11
208.56

05.04 JUNTAS
05.04.01 JUNTAS DE DILATACION EN SARDINELES

35.70

0.00

0.0%
0.0%

35.7

0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

69.21
122.47
0.2

06.00 CANAL DE CONCRETO TAPADO


06.01 EXCAVACION EN TIERRA, PROF. 1.40m
06.02 PERFILADO, CONFORMACION Y COMPACTACION DE FONDO
06.03 RELLENO DE ZANJA CON MATERIAL PROPIO

m3
m2
m3
Hoja 3 de 39

69.21
122.47
0.20

VALORIZACION N 01
AVANCE FISISCO DE LA OBRA
0
Proyecto:

"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE


Departamento
BAOS DEL INCA''

: CAJAMARCA

Ejecucin:

ICSA CONSTRUCTORES SRL

Provincia

: CAJAMARCA

Modalidad:

Precios Unitarios

Distrito

Item

Descripcin

06.04 ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA


06.05 SOLADO DE FONDO E=4", 1:8, CEMENTO:HORMIGON

Und
m3
m2

Hoja 4 de 39

: LOS BAOS DEL INCA

Metrado
86.51
12.25

METRADOS EJECUTADOS
ANTERIOR

ACTUAL

ACUMUL.
0.00
0.00

% AVAN.
0.0%
0.0%

SALDO
86.51
12.25

VALORIZACION N 01
AVANCE FISISCO DE LA OBRA
0
Proyecto:

"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE


Departamento
BAOS DEL INCA''

: CAJAMARCA

Ejecucin:

ICSA CONSTRUCTORES SRL

Provincia

: CAJAMARCA

Modalidad:

Precios Unitarios

Distrito

Item

Descripcin

Und

: LOS BAOS DEL INCA

Metrado

METRADOS EJECUTADOS
ANTERIOR

ACTUAL

ACUMUL.

% AVAN.

SALDO

06.06 CONCRETO PARA MUROS Y LOSAS F'C=175 KG/CM2


06.07 ENCOFRADO Y DESENCOFRADO DE LOSAS Y MUROS
06.08 JUNTA DE CONSTRUCCION CON TEKNOPOR 1"-TAPADO ASF.
06.09 ACERO F'y=4200kg/cm2
06.10 TUBERIA DE PVC D=4"

m3
m2
m
kg
m

41.87
357.48
30.00
1,806.71
4.05

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

41.87
357.48
30
1806.71
4.05

07.00 SUMINISTRO E INSTALACION DE ALCANTARILLA TMC


07.01 EXCAVACION EN TIERRA, PROF. 1.30m
07.02 PERFILADO, CONFORMACION Y COMPACTACION DE FONDO
07.03 RELLENO DE ZANJA CON MATERIAL DE PRESTAMO
07.04 ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA
07.05 CONCRETO PARA EMBOQUILLADO F'C= 140KG/CM
07.06 ENCOFRADO EN MUROS
07.07 COLOCACION DE ALCANTARILLA TMC 24"

m3
m2
m3
m3
m3
m2
m

12.79
9.84
10.47
17.91
1.27
8.64
8.20

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

12.79
9.84
10.47
17.91
1.27
8.64
8.2

08.00 MURO DE CONTENCION


08.01 EXCAVACION EN TIERRA, PROF. 4.00m
08.02 MATERIAL IMPERMEABLE
08.03 RELLENO CON MATERIAL DE FILTRO
08.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
08.05 CONCRETO F'C=80 KG/CM2
08.06 CONCRETO F'C= 140 KG/CM2+30%PM.
08.07 ENCOFRADO Y DESENCOFRADO DE MURO
08.08 CONCRETO F'C=175 KG/CM2
08.09 ACERO DE REFUERZO EN VEREDAS F'y=4200kg/cm2
08.10 TUBERIA DE PVC D=4"
08.11 JUNTAS DE POLIESTIRENO

m3
m3
m3
m3
m3
m3
m2
m3
kg
m
m

125.43
4.07
21.09
156.79
19.43
74.37
183.15
4.07
290.08
58.28
37.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

125.43
4.07
21.09
156.79
19.43
74.37
183.15
4.07
290.08
58.28
37

09.00 INSTALACION DE REDES DE DESAGE


09.01 EXCAVACION EN TIERRA, PROF. 1.40m
09.02 PERFILADO, CONFORMACION DE FONDO
09.03 CAMA DE ARENA
09.04 RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
09.05 RELLENO Y COMPACTACION CON MAT. PROPIO
09.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
09.07 INSTALACION DE TUBERIA PVC-SAL 6" (DESAGUE)
09.08 INSTALACION DE TUBERIA PVC-SAL 8" (DESAGUE)
09.09 PRUEBA HIDRAULICA DE TUBERIA PVC-SAL 6" (DESAGUE)
09.10 PRUEBA HIDRAULICA DE TUBERIA PVC-SAL 8" (DESAGUE)

m3
m2
m2
m3
m3
m3
m
m
m
m

643.39
467.22
46.73
142.17
455.81
59.27
592.27
274.66
502.89
274.66

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

643.39
467.22
46.73
142.17
455.81
59.27
592.27
274.66
502.89
274.66

10.00 REPOSICION DE CONEXIONES DOMICILIARIAS DE DESAGE


10.01 EXCAVACION EN TIERRA, PROF. 1.40m
10.02 PERFILADO, CONFORMACION DE FONDO
10.03 CAMA DE ARENA
10.04 RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
10.05 RELLENO Y COMPACTACION CON MAT. PROPIO
10.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
10.07 INSTALACION DE TUBERIA PVC-SAL 6" (DESAGUE)
10.08 SUMIN. E INST. DE CAJA DE DESAGUE, INCLUYE MARCO Y TAPA
10.09 EMPALME DE TUBERIA A RED GENERAL DE DESAGUE

m3
m2
m2
m3
m3
m3
m
und
und

713.28
509.49
51.66
420.31
231.26
77.39
849.14
188.00
188.00

418.36
298.82
29.89
225.8
155.03
46
498.04

0.586529834
0.5865080767
0.5785907859
0.5372225262
0.670371011
0.5943920403
0.5865228349

0.00
0.00

0.0%
0.0%

294.92
210.67
21.77
194.51
76.23
31.39
351.1
188
188

11.00 CONSTRUCCION DE BUZONES


11.01 EXCAVACION EN TIERRA
11.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
11.03 SOLADO DE FONDO E=4", 1:8, CEMENTO:HORMIGON
11.04 CONCRETO PARA MUROS Y FONDO F'C=175 KG/CM2
11.05 ENCOFRADO DE MURO (INTERIOR Y EXTERIOR)
11.06 CONSTRUCCION DE MEDIA CAA
11.07 SUMIN. E INST. DE TECHO 210 KG/CM2, INCLUYE MARCO Y TAPA

m3
m3
m3
m3
m2
m3
und

27.04
35.50
1.81
17.20
188.50
5.44
16.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

27.04
35.5
1.81
17.2
188.5
5.44
16

12.00 ENCIMADO DE BUZONES


12.01 EXCAVACION EN TIERRA
12.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
12.03 CONCRETO PARA MUROS F'C=175 KG/CM2
12.04 ENCOFRADO DE MURO (INTERIOR Y EXTERIOR)

m3
m3
m3
m2

3.62
4.52
4.83
46.13

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

3.62
4.52
4.83
46.13

13.00 INSTALACION DE REDES DE AGUA POTABLE


13.01 EXCAVACION EN TIERRA, PROF. 1.00m MAX
13.02 PERFILADO, CONFORMACION DE FONDO
13.03 CAMA DE ARENA
13.04 RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
13.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
13.06 INSTALACION DE TUBERIA PVC-SAP 1"

m3
m2
m2
m3
m3
m

263.83
376.90
37.69
113.07
47.12
628.17

0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

263.83
376.9
37.69
113.07
47.12
628.17

14.00 REPOSICION DE CONEXIONES DOMICILIARIAS DE AGUA


14.01 EXCAVACION EN TIERRA, PROF. 1.00m MAX
14.02 PERFILADO, CONFORMACION DE FONDO
14.03 CAMA DE ARENA
14.04 RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
14.05 RELLENO Y COMPACTACION CON MAT. PROPIO
14.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
14.07 TENDIDO DE TUBERIA PVC - SAP 3/4"
14.08 INSTALACION DE ACCESORIOS TOMA.
14.09 SUMIN. E INST. DE CAJA DE AGUA, INCLUYE MARCO Y TAPA

m3
m2
m2
m3
m3
m3
m
m
und

430.96
482.05
48.26
224.62
64.51
175.01
791.12
189.00
189.00

318.78
304.56
30.45
130.57
52.13
152.62
507.11

0.7396974197
0.6318016803
0.6309573145
0.5812928501
0.8080917687
0.8720644535
0.6410026292

0.00
0.00

0.0%
0.0%

0.0%
418.36
298.82
29.89
225.8
155.03
46
498.04

0.0%

Hoja 5 de 39

318.78
304.56
30.45
130.57
52.13
152.62
507.11

112.18
177.49
17.81
94.05
12.38
22.39
284.01
189
189

VALORIZACION N 01
AVANCE FISISCO DE LA OBRA
0
Proyecto:

"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE


Departamento
BAOS DEL INCA''

: CAJAMARCA

Ejecucin:

ICSA CONSTRUCTORES SRL

Provincia

: CAJAMARCA

Modalidad:

Precios Unitarios

Distrito

Descripcin

Item

14.10 INSTALACION DE ACCESORIOS DE MEDICION

Und

: LOS BAOS DEL INCA

Metrado

METRADOS EJECUTADOS
ANTERIOR

ACTUAL

ACUMUL.

% AVAN.

SALDO

0.00

0.0%

189

22.27
31.17
22.27
22.27
3.33
18.30
27.00
27.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

22.27
31.17
22.27
22.27
3.33
18.3
27
27

m2

252.62

0.00

0.0%
0.0%

252.62

Glb

1.00

0.00

0.0%
0.0%

80.15
24.07
5.46
2.19
156.62

und

15.00 REUBICACION DE POSTES DE CONCRETO


15.01 DEMOLICION DE CIMIENTOS
15.02 ELIMINACION DE DEMOLICION - CARGUIO MANUAL A VOLQUETE
15.03 EXCAVACION EN TERRENO NORMAL
15.04 RELLENO DE CIMIENTO DEMOLIDO CON MATERIAL PROPIO
15.05 SOLADO DE FONDO E=8", 1:12, CEMENTO:HORMIGON
15.06 CIMIENTOS DE CONCRETO MEZCLA 1:8 CEMENTO-HORMIGON
15.07 DESMONTAJE DE POSTES DE CONCRETO
15.08 REUBICACION DE POSTES DE CONCRETO

m3
m3
m3
m3
m3
m3
und
und

16.00 TERRENOS A EXPROPIAR


16.01 EXPROPIACION DE TERRENOS PARA VAS Y VEREDAS
17.00 VARIOS
17.01 LIMPIEZA FINAL DE OBRAS

189.00

17.02 DEMOLICION DE CONSTRUCCION EN TERRENO A EXPROPIAR


17.02.01 DEMOLICION DE MURO DE ALBAILERIA
17.02.02 DEMOLICION DE CIMIENTO CORRIDO
17.02.03 DEMOLICION DE SOBRECIMIENTO
17.02.04 DEMOLICION DE COLUMNAS
17.02.05 ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE

m2
m3
m3
m3
m3

80.15
24.07
5.46
2.19
156.62

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

17.03 REPOSICION DE ESTRUCTURA DEMOLIDA


17.03.01 REPOSICION DE MURO DE SOGA LADRILLO CON CEMENTO-ARENA, MEZCLA 1:5,
17.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
17.03.03 SOBRECIMIENTOS MEZCLA 1:8 CEMENTO-HORMIGON
17.03.04 ACERO F'y=4200kg/cm2 GRADO 60 EN SOBRECIMIENTOS
17.03.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2
m3
m3
kg
m2

80.15
24.07
5.46
220.89
58.29

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

80.15
24.07
5.46
220.89
58.29

17.04 REPOSICION DE COLUMNAS


17.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2
17.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
17.04.03 ACERO FY=4200 KG/CM2 GRADO 60 EN COLUMNAS
17.04.04 BARANDA METLICA

m3
m2
kg
m

2.19
3.25
138.60
130.65

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

2.19
3.25
138.6
130.65

glb

1.00

0.00

0.0%

18.00

CONFORMACION DE TERRAPLENES Y REFORESTACION EN BOTADEROS

18.01 CONFORMACION DE TERRAPLENES Y REFORESTACION EN BOTADEROS

Hoja 6 de 39

VALORIZACION N 01
CONTROL DE METRADOS EJECUTADOS
0
Proyecto:

"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE


Departamento
BAOS DEL INCA''

: CAJAMARCA

Ejecucin:

ICSA CONSTRUCTORES SRL

Provincia

: CAJAMARCA

Modalidad:

Precios Unitarios

Distrito

Item

Descripcin

01.00 OBRAS PROVISIONALES


01.01 CARTEL DE OBRA (1.80X3.60 m)
01.02 ALMACEN Y GUARDIANIA
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

Und

: LOS BAOS DEL INCA

Metrado

METRADOS EJECUTADOS
ANTERIOR

ACTUAL

ACUMUL.

% AVAN.

SALDO

0.00
und
Glb
Glb

1.00
1.00
1.00

1
0.5

02.00 CONSTRUCCION DE CALZADA VEHICULAR

0.00

0.0%

1
0.5

1
0.5

0.00

0.00

0.0%
0.0%
0.0%

0.00

15791.39
16.26
2.28

0.636773219
1
1

9007.69

02.01 OBRAS PRELIMINARES


02.01.01 TRAZO, NIVELES Y REPLANTEO
02.01.02 DEMOLICION DE PAVIMENTO
02.01.03 ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE

m2
m2
m3

24,799.08
16.26
2.28

15791.39
16.26
2.28

02.02 MOVIMIENTO DE TIERRAS


02.02.01 CORTE A NIVEL DE SUBRASANTE CON MAQUINARIA
02.02.02 CORTE A NIVEL DE SUBRASANTE MANUAL
02.02.03 RELLENO CON MATERIAL PROPIO
02.02.04 ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA
02.02.05 NIVELACION Y COMPACTACION DE SUB RASANTE - MAQUINARIA
02.02.06 MEJORAMIENTO DE SUBRASANTE CON OVER T.M 6" (Ext, Riego y Comp.)
02.02.07 CONFORMACION DE SUB BASE GRANULAR (Ext. Riego Y Comp.) E=0.20M
02.02.08 CONFORMACION DE SUB BASE GRANULAR E=0.15m, (Ext. Riego Y Comp.)

m3
m3
m3
m3
m2
m3
m2
m2

16,290.54
805.05
154.74
18,568.97
20,547.89
1,226.93
20,547.89
20,547.89

9168.53
290.12

9168.53 0.5628131419
290.12 0.360375132

10655.86

10655.86 0.5738530462

02.03 EMBLOQUETADO DE CALLES CON ADOQUINES DE CONCRETO


COLOCACION DE ADOQUIN DE CONCRETO 20X10X8 CM VEHICULAR, COLOR GRIS
02.03.01 CLARO
COLOCACION DE ADOQUIN DE CONCRETO 20X10X6 CM VEHICULAR, COLOR GRIS
02.03.02 CLARO

0.5

0.00
0.00

0.0%

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

7122.01
514.93
154.74
7913.11
20547.89
1226.93
20547.89
20547.89

0.0%
m2
m2

9,200.47
10,226.20

0.00

0.0%

0.00

0.0%

9200.47
10226.2

0.0%

03.00 CUNETAS
14.51
2.03

1
1

0.00
0.00

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

3351.54
4589.29
447.8
1216.12

169.13
18.15
29.79

0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

169.13
18.15
29.79

221.30

0.00

0.0%
0.0%

221.3

m2
m2
m3

6,209.17
790.42
156.27

0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

6209.17
790.42
156.27

04.02 MOVIMIENTO DE TIERRAS


04.02.01 EXCAVACION A NIVEL DE SUB RASANTE MANUAL (h=0.15m)
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL/VOLQUETE 6 M3, D=10KM APROX.
04.02.03 NIVELACION Y COMPACTACION DE SUBRASANTE MANUAL
04.02.04 NIVELACION Y COMPACTACION BASE GRANULAR-MANUAL (E=0.15m)

m3
m3
m2
m2

1,663.81
2,003.69
6,303.75
6,303.75

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

1663.81
2003.69
6303.75
6303.75

04.03 OBRAS DE CONCRETO SIMPLE


04.03.01 LOSA DE CONCRETO DE F'C=140 KG/CM2, E=4" EN VEREDAS
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS Y SARDINELES
04.03.03 CONCRETO f'c=140 Kg/cm2, E=4" SARDINEL

m2
m2
m3

5,822.96
1,175.62
176.53

0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

5822.96
1175.62
176.53

04.04 JUNTAS
04.04.01 JUNTAS DE DILATACION EN VEREDAS

2,344.25

0.00

0.0%
0.0%

2344.25

234.53

03.01 DEMOLICION DE CUNETAS


03.02 ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE
03.03 CONFORMACION Y REFINE BASE
03.04 CONCRETO EN CUNETAS F'C=140 KG/CM2 E=0.10M
03.05 ENCOFRADO Y DESENCOFRADO NORMAL EN CUNETAS
03.06 JUNTAS DE DILATACION EN CUNETAS

m2
m3
m2
m2
m2
m

14.51
2.03
3,351.54
4,589.29
447.80
1,216.12

03.07 CONSTRUCCION DE BADENES E=0.10 M


03.07.01 TRAZO, NIVELES Y REPLANTEO EN CUNETAS
03.07.02 LOSA DE CONCRETO DE F'C=140 KG/CM2, E=0.10m
03.07.03 ENCOFRADO Y DESENCOFRADO DE BADEN

m2
m3
m2

03.08 COLOCACION DE REJILLA


03.08.01 SUMINISTRO Y COLOCACIN DE REJILLA DE FIERRO LAMINADO

04.00 VEREDAS Y SARDINEL


04.01 TRABAJOS PRELIMINARES
04.01.01 TRAZO, NIVELES Y REPLANTEO
04.01.02 DEMOLICION DE VEREDAS
04.01.03 ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE

14.51
2.03

05.00 SARDINELES DE JARDINES


05.01 TRABAJOS PRELIMINARES
05.01.01 TRAZO, NIVELES Y REPLANTEO.

m2

234.53

0.00

0.0%
0.0%
0.0%

05.02 MOVIMIENTO DE TIERRAS


05.02.01 EXCAVACION A NIVEL DE SUB RASANTE MANUAL (h=0.20m)
05.02.02 ELIMINACION DE MAT. VEREDAL MANUAL / VOLQUETE 6 m3, D=10Km Aprox.

m3
m3

8.96
11.21

0.00
0.00

0.0%
0.0%
0.0%

8.96
11.21

05.03 OBRAS DE CONCRETO SIMPLE


05.03.01 CONCRETO f'c= 140 Kg/cm, SARDINEL DE JARDIN
05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS Y SARDINELES

m3
m2

13.11
208.56

0.00
0.00

0.0%
0.0%
0.0%

13.11
208.56

05.04 JUNTAS
05.04.01 JUNTAS DE DILATACION EN SARDINELES

35.70

0.00

0.0%
0.0%

35.7

0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

69.21
122.47
0.2

06.00 CANAL DE CONCRETO TAPADO


06.01 EXCAVACION EN TIERRA, PROF. 1.40m
06.02 PERFILADO, CONFORMACION Y COMPACTACION DE FONDO
06.03 RELLENO DE ZANJA CON MATERIAL PROPIO

m3
m2
m3
Hoja 7 de 39

69.21
122.47
0.20

VALORIZACION N 01
CONTROL DE METRADOS EJECUTADOS
0
Proyecto:

"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE


Departamento
BAOS DEL INCA''

: CAJAMARCA

Ejecucin:

ICSA CONSTRUCTORES SRL

Provincia

: CAJAMARCA

Modalidad:

Precios Unitarios

Distrito

Item

Descripcin

06.04 ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA


06.05 SOLADO DE FONDO E=4", 1:8, CEMENTO:HORMIGON

Und
m3
m2

Hoja 8 de 39

: LOS BAOS DEL INCA

Metrado
86.51
12.25

METRADOS EJECUTADOS
ANTERIOR

ACTUAL

ACUMUL.
0.00
0.00

% AVAN.
0.0%
0.0%

SALDO
86.51
12.25

VALORIZACION N 01
CONTROL DE METRADOS EJECUTADOS
0
Proyecto:

"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE


Departamento
BAOS DEL INCA''

: CAJAMARCA

Ejecucin:

ICSA CONSTRUCTORES SRL

Provincia

: CAJAMARCA

Modalidad:

Precios Unitarios

Distrito

Item

Descripcin

Und

: LOS BAOS DEL INCA

Metrado

METRADOS EJECUTADOS
ANTERIOR

ACTUAL

ACUMUL.

% AVAN.

SALDO

06.06 CONCRETO PARA MUROS Y LOSAS F'C=175 KG/CM2


06.07 ENCOFRADO Y DESENCOFRADO DE LOSAS Y MUROS
06.08 JUNTA DE CONSTRUCCION CON TEKNOPOR 1"-TAPADO ASF.
06.09 ACERO F'y=4200kg/cm2
06.10 TUBERIA DE PVC D=4"

m3
m2
m
kg
m

41.87
357.48
30.00
1,806.71
4.05

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

41.87
357.48
30
1806.71
4.05

07.00 SUMINISTRO E INSTALACION DE ALCANTARILLA TMC


07.01 EXCAVACION EN TIERRA, PROF. 1.30m
07.02 PERFILADO, CONFORMACION Y COMPACTACION DE FONDO
07.03 RELLENO DE ZANJA CON MATERIAL DE PRESTAMO
07.04 ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA
07.05 CONCRETO PARA EMBOQUILLADO F'C= 140KG/CM
07.06 ENCOFRADO EN MUROS
07.07 COLOCACION DE ALCANTARILLA TMC 24"

m3
m2
m3
m3
m3
m2
m

12.79
9.84
10.47
17.91
1.27
8.64
8.20

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

12.79
9.84
10.47
17.91
1.27
8.64
8.2

08.00 MURO DE CONTENCION


08.01 EXCAVACION EN TIERRA, PROF. 4.00m
08.02 MATERIAL IMPERMEABLE
08.03 RELLENO CON MATERIAL DE FILTRO
08.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
08.05 CONCRETO F'C=80 KG/CM2
08.06 CONCRETO F'C= 140 KG/CM2+30%PM.
08.07 ENCOFRADO Y DESENCOFRADO DE MURO
08.08 CONCRETO F'C=175 KG/CM2
08.09 ACERO DE REFUERZO EN VEREDAS F'y=4200kg/cm2
08.10 TUBERIA DE PVC D=4"
08.11 JUNTAS DE POLIESTIRENO

m3
m3
m3
m3
m3
m3
m2
m3
kg
m
m

125.43
4.07
21.09
156.79
19.43
74.37
183.15
4.07
290.08
58.28
37.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

125.43
4.07
21.09
156.79
19.43
74.37
183.15
4.07
290.08
58.28
37

09.00 INSTALACION DE REDES DE DESAGE


09.01 EXCAVACION EN TIERRA, PROF. 1.40m
09.02 PERFILADO, CONFORMACION DE FONDO
09.03 CAMA DE ARENA
09.04 RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
09.05 RELLENO Y COMPACTACION CON MAT. PROPIO
09.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
09.07 INSTALACION DE TUBERIA PVC-SAL 6" (DESAGUE)
09.08 INSTALACION DE TUBERIA PVC-SAL 8" (DESAGUE)
09.09 PRUEBA HIDRAULICA DE TUBERIA PVC-SAL 6" (DESAGUE)
09.10 PRUEBA HIDRAULICA DE TUBERIA PVC-SAL 8" (DESAGUE)

m3
m2
m2
m3
m3
m3
m
m
m
m

643.39
467.22
46.73
142.17
455.81
59.27
592.27
274.66
502.89
274.66

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

643.39
467.22
46.73
142.17
455.81
59.27
592.27
274.66
502.89
274.66

10.00 REPOSICION DE CONEXIONES DOMICILIARIAS DE DESAGE


10.01 EXCAVACION EN TIERRA, PROF. 1.40m
10.02 PERFILADO, CONFORMACION DE FONDO
10.03 CAMA DE ARENA
10.04 RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
10.05 RELLENO Y COMPACTACION CON MAT. PROPIO
10.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
10.07 INSTALACION DE TUBERIA PVC-SAL 6" (DESAGUE)
10.08 SUMIN. E INST. DE CAJA DE DESAGUE, INCLUYE MARCO Y TAPA
10.09 EMPALME DE TUBERIA A RED GENERAL DE DESAGUE

m3
m2
m2
m3
m3
m3
m
und
und

713.28
509.49
51.66
420.31
231.26
77.39
849.14
188.00
188.00

418.36
298.82
29.89
225.8
155.03
46
498.04

0.586529834
0.5865080767
0.5785907859
0.5372225262
0.670371011
0.5943920403
0.5865228349

0.00
0.00

0.0%
0.0%

294.92
210.67
21.77
194.51
76.23
31.39
351.1
188
188

11.00 CONSTRUCCION DE BUZONES


11.01 EXCAVACION EN TIERRA
11.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
11.03 SOLADO DE FONDO E=4", 1:8, CEMENTO:HORMIGON
11.04 CONCRETO PARA MUROS Y FONDO F'C=175 KG/CM2
11.05 ENCOFRADO DE MURO (INTERIOR Y EXTERIOR)
11.06 CONSTRUCCION DE MEDIA CAA
11.07 SUMIN. E INST. DE TECHO 210 KG/CM2, INCLUYE MARCO Y TAPA

m3
m3
m3
m3
m2
m3
und

27.04
35.50
1.81
17.20
188.50
5.44
16.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

27.04
35.5
1.81
17.2
188.5
5.44
16

12.00 ENCIMADO DE BUZONES


12.01 EXCAVACION EN TIERRA
12.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
12.03 CONCRETO PARA MUROS F'C=175 KG/CM2
12.04 ENCOFRADO DE MURO (INTERIOR Y EXTERIOR)

m3
m3
m3
m2

3.62
4.52
4.83
46.13

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

3.62
4.52
4.83
46.13

13.00 INSTALACION DE REDES DE AGUA POTABLE


13.01 EXCAVACION EN TIERRA, PROF. 1.00m MAX
13.02 PERFILADO, CONFORMACION DE FONDO
13.03 CAMA DE ARENA
13.04 RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
13.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
13.06 INSTALACION DE TUBERIA PVC-SAP 1"

m3
m2
m2
m3
m3
m

263.83
376.90
37.69
113.07
47.12
628.17

0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

263.83
376.9
37.69
113.07
47.12
628.17

14.00 REPOSICION DE CONEXIONES DOMICILIARIAS DE AGUA


14.01 EXCAVACION EN TIERRA, PROF. 1.00m MAX
14.02 PERFILADO, CONFORMACION DE FONDO
14.03 CAMA DE ARENA
14.04 RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
14.05 RELLENO Y COMPACTACION CON MAT. PROPIO
14.06 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
14.07 TENDIDO DE TUBERIA PVC - SAP 3/4"
14.08 INSTALACION DE ACCESORIOS TOMA.
14.09 SUMIN. E INST. DE CAJA DE AGUA, INCLUYE MARCO Y TAPA

m3
m2
m2
m3
m3
m3
m
m
und

430.96
482.05
48.26
224.62
64.51
175.01
791.12
189.00
189.00

318.78
304.56
30.45
130.57
52.13
152.62
507.11

0.7396974197
0.6318016803
0.6309573145
0.5812928501
0.8080917687
0.8720644535
0.6410026292

0.00
0.00

0.0%
0.0%

0.0%
418.36
298.82
29.89
225.8
155.03
46
498.04

0.0%

Hoja 9 de 39

318.78
304.56
30.45
130.57
52.13
152.62
507.11

112.18
177.49
17.81
94.05
12.38
22.39
284.01
189
189

VALORIZACION N 01
CONTROL DE METRADOS EJECUTADOS
0
Proyecto:

"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE


Departamento
BAOS DEL INCA''

: CAJAMARCA

Ejecucin:

ICSA CONSTRUCTORES SRL

Provincia

: CAJAMARCA

Modalidad:

Precios Unitarios

Distrito

Descripcin

Item

14.10 INSTALACION DE ACCESORIOS DE MEDICION

Und

: LOS BAOS DEL INCA

Metrado

METRADOS EJECUTADOS
ANTERIOR

ACTUAL

ACUMUL.

% AVAN.

SALDO

0.00

0.0%

189

22.27
31.17
22.27
22.27
3.33
18.30
27.00
27.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

22.27
31.17
22.27
22.27
3.33
18.3
27
27

m2

252.62

0.00

0.0%
0.0%

252.62

Glb

1.00

0.00

0.0%
0.0%

80.15
24.07
5.46
2.19
156.62

und

15.00 REUBICACION DE POSTES DE CONCRETO


15.01 DEMOLICION DE CIMIENTOS
15.02 ELIMINACION DE DEMOLICION - CARGUIO MANUAL A VOLQUETE
15.03 EXCAVACION EN TERRENO NORMAL
15.04 RELLENO DE CIMIENTO DEMOLIDO CON MATERIAL PROPIO
15.05 SOLADO DE FONDO E=8", 1:12, CEMENTO:HORMIGON
15.06 CIMIENTOS DE CONCRETO MEZCLA 1:8 CEMENTO-HORMIGON
15.07 DESMONTAJE DE POSTES DE CONCRETO
15.08 REUBICACION DE POSTES DE CONCRETO

m3
m3
m3
m3
m3
m3
und
und

16.00 TERRENOS A EXPROPIAR


16.01 EXPROPIACION DE TERRENOS PARA VAS Y VEREDAS
17.00 VARIOS
17.01 LIMPIEZA FINAL DE OBRAS

189.00

17.02 DEMOLICION DE CONSTRUCCION EN TERRENO A EXPROPIAR


17.02.01 DEMOLICION DE MURO DE ALBAILERIA
17.02.02 DEMOLICION DE CIMIENTO CORRIDO
17.02.03 DEMOLICION DE SOBRECIMIENTO
17.02.04 DEMOLICION DE COLUMNAS
17.02.05 ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE

m2
m3
m3
m3
m3

80.15
24.07
5.46
2.19
156.62

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

17.03 REPOSICION DE ESTRUCTURA DEMOLIDA


17.03.01 REPOSICION DE MURO DE SOGA LADRILLO CON CEMENTO-ARENA, MEZCLA 1:5,
17.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
17.03.03 SOBRECIMIENTOS MEZCLA 1:8 CEMENTO-HORMIGON
17.03.04 ACERO F'y=4200kg/cm2 GRADO 60 EN SOBRECIMIENTOS
17.03.05 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2
m3
m3
kg
m2

80.15
24.07
5.46
220.89
58.29

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

80.15
24.07
5.46
220.89
58.29

17.04 REPOSICION DE COLUMNAS


17.04.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2
17.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
17.04.03 ACERO FY=4200 KG/CM2 GRADO 60 EN COLUMNAS
17.04.04 BARANDA METLICA

m3
m2
kg
m

2.19
3.25
138.60
130.65

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

2.19
3.25
138.6
130.65

glb

1.00

0.00

0.0%

18.00

CONFORMACION DE TERRAPLENES Y REFORESTACION EN BOTADEROS

18.01 CONFORMACION DE TERRAPLENES Y REFORESTACION EN BOTADEROS

Hoja 10 de 39

VALORIZACION N 01
0
"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE BAOS DEL
INCA''
Ejecucin: ICSA CONSTRUCTORES SRL
Modalidad: Precios Unitarios
Proyecto:

01.00
01.01
01.02
01.03

OBRAS PROVISIONALES
CARTEL DE OBRA (1.80X3.60 m)
ALMACEN Y GUARDIANIA
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

02.00

CONSTRUCCION DE CALZADA VEHICULAR

02.01
02.01.01
02.01.02
02.01.03

OBRAS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
DEMOLICION DE PAVIMENTO
ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE

02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08

MOVIMIENTO DE TIERRAS
CORTE A NIVEL DE SUBRASANTE CON MAQUINARIA
CORTE A NIVEL DE SUBRASANTE MANUAL
RELLENO CON MATERIAL PROPIO
ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA
NIVELACION Y COMPACTACION DE SUB RASANTE - MAQUINARIA
MEJORAMIENTO DE SUBRASANTE CON OVER T.M 6" (Ext, Riego y Comp.)
CONFORMACION DE SUB BASE GRANULAR (Ext. Riego Y Comp.) E=0.20M
CONFORMACION DE SUB BASE GRANULAR E=0.15m, (Ext. Riego Y Comp.)

02.03

02.03.02

EMBLOQUETADO DE CALLES CON ADOQUINES DE CONCRETO


COLOCACION DE ADOQUIN DE CONCRETO 20X10X8 CM VEHICULAR, COLOR
GRIS CLARO
COLOCACION DE ADOQUIN DE CONCRETO 20X10X6 CM VEHICULAR, COLOR
GRIS CLARO

03.00

CUNETAS

03.01
03.02
03.03
03.04
03.05
03.06

DEMOLICION DE CUNETAS
ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE
CONFORMACION Y REFINE BASE
CONCRETO EN CUNETAS F'C=140 KG/CM2 E=0.10M
ENCOFRADO Y DESENCOFRADO NORMAL EN CUNETAS
JUNTAS DE DILATACION EN CUNETAS

03.07
03.07.01
03.07.02
03.07.03

02.03.01

Und

792.96 und
5,394.39 Glb
5,200.00 Glb

0.59 m2
17.13 m2
22.11 m3

4.83
19.98
13.48
7.35
1.26
50.62
15.63
8.38

60.24
49.07

m3
m3
m3
m3
m2
m3
m2
m2

m2
m2

Metrado

: CAJAMARCA
: LOS BAOS DEL INCA

ANTERIOR

Descripcin
P. U.

: CAJAMARCA

Provincia
Distrito

AVANCE DE OBRA

EXPEDIENTE
Item

Departamento

COSTO

Metrado

ACTUAL

Valorizado

Metrado

Valorizado

0.0%
0.0%
0.0%
0.0%
0.0%

1,885,684.76

0.00

0.0%

24,799.08
16.26
2.28

14,960.40
14,631.46
278.53
50.41

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

16,290.54
805.05
154.74
18,568.97
20,547.89
1,226.93
20,547.89
20,547.89

814,688.42
78,683.31
16,084.90
2,085.90
136,481.93
25,890.34
62,107.20
321,163.52
172,191.32

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

1,056,035.94
554,236.31

0.00

0.0%

0.00

0.0%

0.00

0.0%

0.00

0.0%

0.00

0.00

0.0%

0.00

1.00
1.00
1.00

9,200.47
501,799.63

0.00

0.0%

229,305.77

0.00

0.0%

10,226.20

248.56
44.88
13,473.19
153,374.07
13,057.85
5,594.15

0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

CONSTRUCCION DE BADENES E=0.10 M


TRAZO, NIVELES Y REPLANTEO EN CUNETAS
LOSA DE CONCRETO DE F'C=140 KG/CM2, E=0.10m
ENCOFRADO Y DESENCOFRADO DE BADEN

0.40 m2
261.46 m3
29.16 m2

169.13
18.15
29.79

5,681.83
67.65
4,745.50
868.68

0.00
0.00
0.00
0.00

03.08
03.08.01
.
04.00
04.01
04.01.01
04.01.02
04.01.03

COLOCACION DE REJILLA
SUMINISTRO Y COLOCACIN DE REJILLA DE FIERRO LAMINADO

170.95 m

221.30

37,831.24
37,831.24

0.59 m2
17.13 m2
22.11 m3

6,209.17
790.42
156.27

04.02
04.02.01

19.98 m3

1,663.81

04.02.02
04.02.03
04.02.04

MOVIMIENTO DE TIERRAS
EXCAVACION A NIVEL DE SUB RASANTE MANUAL (h=0.15m)
ELIMINACION DE MATERIAL EXCEDENTE MANUAL/VOLQUETE 6 M3, D=10KM
APROX.
NIVELACION Y COMPACTACION DE SUBRASANTE MANUAL
NIVELACION Y COMPACTACION BASE GRANULAR-MANUAL (E=0.15m)

04.03
04.03.01
04.03.02
04.03.03

OBRAS DE CONCRETO SIMPLE


LOSA DE CONCRETO DE F'C=140 KG/CM2, E=4" EN VEREDAS
ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS Y SARDINELES
CONCRETO f'c=140 Kg/cm2, E=4" SARDINEL

m3

Metr.

0.00
0.00
0.00
0.00
0.00

14.51
2.03
3,351.54
4,589.29
447.80
1,216.12

VEREDAS Y SARDINEL
TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO
DEMOLICION DE VEREDAS
ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE

3,058,418.61
11,387.35
792.96
5,394.39
5,200.00

m2
m3
m2
m2
m2
m

17.13
22.11
4.02
33.42
29.16
4.60

ACUMULADO

Valorizado

183001.05 5.9835187179

183001.05 5.9835187179

7994.39 70.2041300215

7994.39 70.204130021

0.00

0.0%

0.00

0.00

0.0%

5394.39

100

5394.39

100

0.5

2600

50

0.5

2600

50

138047.03 7.3207904592

0.00

9645.86 64.4759498409
15791.39

9316.92 63.6773090314

138047.03 7.3207904592
9645.86 64.475949841

15791.39

9316.92 63.677309031

16.26

278.53

100

16.26

278.53

100

2.28

50.41

100

2.28

50.41

100

128401.17 15.7607702341

128401.17 15.760770234

9168.53

44284 56.2813130256

9168.53

44284 56.281313026

290.12

5796.6 36.0375258783

290.12

5796.6 36.037525878

0.00
10655.86

0.0%

0.00

78320.57 57.3853036809

10655.86

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00

293.44 0.1279688688
100

0.00

0.0%

78320.57 57.385303681

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

0.00

0.0%

0.00

0.0%

0.00

0.0%

293.44 0.1279688688

14.51

248.56

14.51

248.56

2.03

44.88

100

2.03

44.88

100

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

100

0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

0.00
0.00

0.0%
0.0%

0.00
0.00

0.0%
0.0%

0.00

0.00
0.00

0.0%
0.0%

553,905.78
20,658.43
3,663.41
13,539.89
3,455.13

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

242,513.65
33,242.92
44,301.59

0.00
0.00

0.0%
0.0%

0.00
0.00

0.0%
0.0%

0.00

0.00
0.00

0.0%
0.0%

0.00

0.0%

0.00

0.0%

0.00

0.00

0.0%

22.11
1.93 m2
24.24 m2

2,003.69
6,303.75
6,303.75

12,166.24
152,802.90

0.00
0.00

0.0%
0.0%

0.00
0.00

0.0%
0.0%

0.00
0.00

0.00
0.00

0.0%
0.0%

32.11 m2
32.19 m2
291.99 m3

5,822.96
1,175.62
176.53

276,363.45
186,975.25
37,843.21
51,544.99

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

Hoja 11 de 39

VALORIZACION N 01
0
"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE BAOS DEL
INCA''
Ejecucin: ICSA CONSTRUCTORES SRL
Modalidad: Precios Unitarios
Proyecto:

Und

04.04
04.04.01

JUNTAS
JUNTAS DE DILATACION EN VEREDAS

6.13 m

05.00
05.01
05.01.01

SARDINELES DE JARDINES
TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO.

05.02
05.02.01
05.02.02

MOVIMIENTO DE TIERRAS
EXCAVACION A NIVEL DE SUB RASANTE MANUAL (h=0.20m)
ELIMINACION DE MAT. VEREDAL MANUAL / VOLQUETE 6 m3, D=10Km Aprox.

05.03
05.03.01
05.03.02

OBRAS DE CONCRETO SIMPLE


CONCRETO f'c= 140 Kg/cm, SARDINEL DE JARDIN
ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS Y SARDINELES

05.04
05.04.01

JUNTAS
JUNTAS DE DILATACION EN SARDINELES

06.00
06.01
06.02
06.03
06.04
06.05
06.06
06.07
06.08
06.09
06.10

CANAL DE CONCRETO TAPADO


EXCAVACION EN TIERRA, PROF. 1.40m
PERFILADO, CONFORMACION Y COMPACTACION DE FONDO
RELLENO DE ZANJA CON MATERIAL PROPIO
ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA
SOLADO DE FONDO E=4", 1:8, CEMENTO:HORMIGON
CONCRETO PARA MUROS Y LOSAS F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO DE LOSAS Y MUROS
JUNTA DE CONSTRUCCION CON TEKNOPOR 1"-TAPADO ASF.
ACERO F'y=4200kg/cm2
TUBERIA DE PVC D=4"

8.92
1.93
15.03
7.35
29.45
321.84
38.70
11.35
4.41
19.03

07.00
07.01
07.02
07.03
07.04
07.05
07.06
07.07

SUMINISTRO E INSTALACION DE ALCANTARILLA TMC


EXCAVACION EN TIERRA, PROF. 1.30m
PERFILADO, CONFORMACION Y COMPACTACION DE FONDO
RELLENO DE ZANJA CON MATERIAL DE PRESTAMO
ELIMINACION DE MAT. EXCEDENTE CON MAQUINARIA
CONCRETO PARA EMBOQUILLADO F'C= 140KG/CM
ENCOFRADO EN MUROS
COLOCACION DE ALCANTARILLA TMC 24"

08.00
08.01
08.02
08.03
08.04
08.05
08.06
08.07
08.08
08.09
08.10
08.11

MURO DE CONTENCION
EXCAVACION EN TIERRA, PROF. 4.00m
MATERIAL IMPERMEABLE
RELLENO CON MATERIAL DE FILTRO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
CONCRETO F'C=80 KG/CM2
CONCRETO F'C= 140 KG/CM2+30%PM.
ENCOFRADO Y DESENCOFRADO DE MURO
CONCRETO F'C=175 KG/CM2
ACERO DE REFUERZO EN VEREDAS F'y=4200kg/cm2
TUBERIA DE PVC D=4"
JUNTAS DE POLIESTIRENO

09.00
09.01
09.02
09.03
09.04
09.05
09.06
09.07
09.08
09.09
09.10
10.00
10.01
10.02
10.03
10.04
10.05
10.06
10.07
10.08
10.09

Metrado

: CAJAMARCA
: LOS BAOS DEL INCA

ANTERIOR

Descripcin
P. U.

: CAJAMARCA

Provincia
Distrito

AVANCE DE OBRA

EXPEDIENTE
Item

Departamento

COSTO

Metrado

ACTUAL

Valorizado

Metrado

ACUMULADO

Valorizado

Metr.

Valorizado

2,344.25

14,370.25
14,370.25

0.00
0.00

0.0%
0.0%

0.00
0.00

0.0%
0.0%

0.00

0.00
0.00

0.0%
0.0%

0.55 m2

234.53

11,173.09
128.99
128.99

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

19.98 m3
9.34 m3

8.96
11.21

283.72
179.02
104.70

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

291.99 m3
32.19 m2

13.11
208.56

10,541.54
3,827.99
6,713.55

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

6.13 m

35.70

218.84
218.84

0.00
0.00

0.0%
0.0%

0.00
0.00

0.0%
0.0%

0.00

0.00
0.00

0.0%
0.0%

m3
m2
m3
m3
m2
m3
m2
m
kg
m

69.21
122.47
0.20
86.51
12.25
41.87
357.48
30.00
1,806.71
4.05

37,548.42
617.35
236.37
3.01
635.85
360.76
13,475.44
13,834.48
340.50
7,967.59
77.07

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

8.92
1.93
55.17
7.35
217.94
38.70
454.64

m3
m2
m3
m3
m3
m2
m

12.79
9.84
10.47
17.91
1.27
8.64
8.20

5,181.55
114.09
18.99
577.63
131.64
276.78
334.37
3,728.05

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

7.76
102.56
96.77
11.17
173.96
355.84
38.70
376.79
4.41
19.03
13.36

m3
m3
m3
m3
m3
m3
m2
m3
kg
m
m

125.43
4.07
21.09
156.79
19.43
74.37
183.15
4.07
290.08
58.28
37.00

46,530.93
973.34
417.42
2,040.88
1,751.34
3,380.04
26,463.82
7,087.91
1,533.54
1,279.25
1,109.07
494.32

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

INSTALACION DE REDES DE DESAGE


EXCAVACION EN TIERRA, PROF. 1.40m
PERFILADO, CONFORMACION DE FONDO
CAMA DE ARENA
RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
RELLENO Y COMPACTACION CON MAT. PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
INSTALACION DE TUBERIA PVC-SAL 6" (DESAGUE)
INSTALACION DE TUBERIA PVC-SAL 8" (DESAGUE)
PRUEBA HIDRAULICA DE TUBERIA PVC-SAL 6" (DESAGUE)
PRUEBA HIDRAULICA DE TUBERIA PVC-SAL 8" (DESAGUE)

8.92
1.93
5.20
18.14
15.03
11.17
31.30
40.61
1.51
1.58

m3
m2
m2
m3
m3
m3
m
m
m
m

643.39
467.22
46.73
142.17
455.81
59.27
592.27
274.66
502.89
274.66

47,860.91
5,739.04
901.73
243.00
2,578.96
6,850.82
662.05
18,538.05
11,153.94
759.36
433.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

REPOSICION DE CONEXIONES DOMICILIARIAS DE DESAGE


EXCAVACION EN TIERRA, PROF. 1.40m
PERFILADO, CONFORMACION DE FONDO
CAMA DE ARENA
RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
RELLENO Y COMPACTACION CON MAT. PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
INSTALACION DE TUBERIA PVC-SAL 6" (DESAGUE)
SUMIN. E INST. DE CAJA DE DESAGUE, INCLUYE MARCO Y TAPA
EMPALME DE TUBERIA A RED GENERAL DE DESAGUE

8.92
1.93
5.20
18.14
15.03
11.17
31.30
84.26
112.45

m3
m2
m2
m3
m3
m3
m
und
und

713.28
509.49
51.66
420.31
231.26
77.39
849.14
188.00
188.00

83,138.68
6,362.46
983.32
268.63
7,624.42
3,475.84
864.45
26,578.08
15,840.88
21,140.60

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

Hoja 12 de 39

26992.5 32.4668373373

26992.5 32.466837337

418.36

3731.77 58.6529424154

418.36

298.82

576.72 58.6502867835

298.82

29.89

155.43 57.8602538808

29.89

3731.77 58.652942415
155.43 57.860253881

225.8

4096.01 53.7222503482

225.8

4096.01 53.722250348

155.03

2330.1 67.0370327748

155.03

576.72 58.650286784

2330.1 67.037032775

46

513.82 59.4389496211

46

513.82 59.438949621

498.04

15588.65 58.6522803754

498.04

15588.65 58.652280375

0.00
0.00

0.0%
0.0%

0.00
0.00

0.00
0.00

0.0%
0.0%

VALORIZACION N 01
0
"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE BAOS DEL
INCA''
Ejecucin: ICSA CONSTRUCTORES SRL
Modalidad: Precios Unitarios
Proyecto:

Und

11.00
11.01
11.02
11.03
11.04
11.05
11.06
11.07

CONSTRUCCION DE BUZONES
EXCAVACION EN TIERRA
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
SOLADO DE FONDO E=4", 1:8, CEMENTO:HORMIGON
CONCRETO PARA MUROS Y FONDO F'C=175 KG/CM2
ENCOFRADO DE MURO (INTERIOR Y EXTERIOR)
CONSTRUCCION DE MEDIA CAA
SUMIN. E INST. DE TECHO 210 KG/CM2, INCLUYE MARCO Y TAPA

11.17
11.17
184.50
286.00
35.35
273.50
268.65

m3
m3
m3
m3
m2
m3
und

12.00
12.01
12.02
12.03
12.04

ENCIMADO DE BUZONES
EXCAVACION EN TIERRA
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
CONCRETO PARA MUROS F'C=175 KG/CM2
ENCOFRADO DE MURO (INTERIOR Y EXTERIOR)

11.17
11.17
307.03
35.35

13.00
13.01
13.02
13.03
13.04
13.05
13.06

INSTALACION DE REDES DE AGUA POTABLE


EXCAVACION EN TIERRA, PROF. 1.00m MAX
PERFILADO, CONFORMACION DE FONDO
CAMA DE ARENA
RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
INSTALACION DE TUBERIA PVC-SAP 1"

14.00
14.01
14.02
14.03
14.04
14.05
14.06
14.07
14.08
14.09
14.10

REPOSICION DE CONEXIONES DOMICILIARIAS DE AGUA


EXCAVACION EN TIERRA, PROF. 1.00m MAX
PERFILADO, CONFORMACION DE FONDO
CAMA DE ARENA
RELLENO Y COMPACTACION CON MAT. PROPIO ZARANDEADO
RELLENO Y COMPACTACION CON MAT. PROPIO
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
TENDIDO DE TUBERIA PVC - SAP 3/4"
INSTALACION DE ACCESORIOS TOMA.
SUMIN. E INST. DE CAJA DE AGUA, INCLUYE MARCO Y TAPA
INSTALACION DE ACCESORIOS DE MEDICION

15.00
15.01
15.02
15.03
15.04
15.05
15.06
15.07
15.08

REUBICACION DE POSTES DE CONCRETO


DEMOLICION DE CIMIENTOS
ELIMINACION DE DEMOLICION - CARGUIO MANUAL A VOLQUETE
EXCAVACION EN TERRENO NORMAL
RELLENO DE CIMIENTO DEMOLIDO CON MATERIAL PROPIO
SOLADO DE FONDO E=8", 1:12, CEMENTO:HORMIGON
CIMIENTOS DE CONCRETO MEZCLA 1:8 CEMENTO-HORMIGON
DESMONTAJE DE POSTES DE CONCRETO
REUBICACION DE POSTES DE CONCRETO

16.00
16.01

TERRENOS A EXPROPIAR
EXPROPIACION DE TERRENOS PARA VAS Y VEREDAS

17.00
17.01

VARIOS
LIMPIEZA FINAL DE OBRAS

17.02
17.02.01
17.02.02
17.02.03
17.02.04
17.02.05

DEMOLICION DE CONSTRUCCION EN TERRENO A EXPROPIAR


DEMOLICION DE MURO DE ALBAILERIA
DEMOLICION DE CIMIENTO CORRIDO
DEMOLICION DE SOBRECIMIENTO
DEMOLICION DE COLUMNAS
ELIMINACION DE DEMOLICION-CARGUIO MANUAL A VOLQUETE

17.03

REPOSICION DE ESTRUCTURA DEMOLIDA

17.03.01
17.03.02
17.03.03
17.03.04
17.03.05
17.04
17.04.01
17.04.02
17.04.03
17.04.04

REPOSICION DE MURO DE SOGA LADRILLO CON CEMENTO-ARENA, MEZCLA 1:5,

Metrado

COSTO

ACTUAL

Valorizado

Metrado

ACUMULADO

Valorizado

Metr.

27.04
35.50
1.81
17.20
188.50
5.44
16.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

m3
m3
m3
m2

3.62
4.52
4.83
46.13

3,204.58
40.44
50.49
1,482.95
1,630.70

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00

8.92
1.93
5.20
18.14
11.17
12.62

m3
m2
m2
m3
m3
m

263.83
376.90
37.69
113.07
47.12
628.17

13,781.70
2,353.36
727.42
195.99
2,051.09
526.33
7,927.51

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

8.92
1.93
5.20
18.14
15.03
11.17
2.42
46.82
62.61
22.99

m3
m2
m2
m3
m3
m3
m
m
und
und

430.96
482.05
48.26
224.62
64.51
175.01
791.12
189.00
189.00
189.00

38,966.42
3,844.16
930.36
250.95
4,074.61
969.59
1,954.86
1,914.51
8,848.98
11,833.29
4,345.11

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

46.64
24.53
40.19
15.03
164.02
185.15
420.16
252.10

m3
m3
m3
m3
m3
m3
und
und

22.27
31.17
22.27
22.27
3.33
18.30
27.00
27.00

25,118.48
1,038.67
764.60
895.03
334.72
546.19
3,388.25
11,344.32
6,806.70

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

50.00 m2

252.62

12,631.00
12,631.00

2,500.00 Glb

1.00

80.15
24.07
5.46
2.19
156.62

7.27
87.26
87.26
87.26
22.11

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA


SOBRECIMIENTOS MEZCLA 1:8 CEMENTO-HORMIGON
ACERO F'y=4200kg/cm2 GRADO 60 EN SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS
REPOSICION DE COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ACERO FY=4200 KG/CM2 GRADO 60 EN COLUMNAS
BARANDA METLICA

382.34
55.85
4.68
73.92

m2
m3
m3
m3
m3

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

9673.69 24.8257089053

9673.69 24.825708905

318.78

2843.52 73.9698659785

318.78

304.56

587.8 63.1798443613

304.56

30.45

158.34 63.0962343096

30.45

2843.52 73.969865979

130.57

2368.54 58.1292442712

130.57

2368.54 58.129244271

52.13

783.51 80.8083829247

52.13

783.51 80.808382925

152.62

1704.77 87.2067564941

152.62

1704.77 87.206756494

507.11

1227.21 64.1004747951

507.11

1227.21 64.100474795

587.8 63.179844361
158.34

63.09623431

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.00
0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00

0.0%
0.0%

0.00
0.00

0.0%
0.0%

0.00

0.00
0.00

0.0%
0.0%

31,597.74
2,500.00

0.00
0.00

0.0%
0.0%

0.00
0.00

0.0%
0.0%

0.00

0.00
0.00

0.0%
0.0%

6,813.45
582.69
2,100.35
476.44
191.10
3,462.87

0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

10,959.16
3,249.28

0.00

0.0%

0.00

0.00

0.0%

0.00

0.0%

0.00

0.0%

0.00

0.00

0.0%

m3
m3
kg
m2

3,983.34
1,010.92
1,009.47
1,706.15

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%

m3
m2
kg
m

2.19
3.25
138.60
130.65

11,325.13
837.32
181.51
648.65
9,657.65

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.0%
0.0%
0.0%
0.0%
0.0%

0.00

0.0%

0.00

0.0%

0.00

0.00

0.0%

0.00

0.0%

0.00

0.0%

0.00

0.00

0.0%

CONFORMACION DE TERRAPLENES Y REFORESTACION EN BOTADEROS

3,000.00

Valorizado

80.15
24.07
5.46
220.89
58.29

m2

18.00
18.01

Metrado

18,401.45
302.04
396.54
333.95
4,919.20
6,663.48
1,487.84
4,298.40

40.54
165.49
185.15
4.57
29.27

CONFORMACION DE TERRAPLENES Y REFORESTACION EN BOTADEROS

: CAJAMARCA
: LOS BAOS DEL INCA

ANTERIOR

Descripcin
P. U.

: CAJAMARCA

Provincia
Distrito

AVANCE DE OBRA

EXPEDIENTE
Item

Departamento

glb

3,000.00
3,000.00
1.00

COSTO DIRECTO TOTAL DE OBRA

S/.

3,058,418.61

183,001.05

5.98%

GASTOS GENERALES VARIABLES (9%)

S/.

275,257.67

0.00

0.0%

16,470.09

5.98%

16,470.09

5.98%

GASTOS GENERALES FIJOS (0.20%)

S/.

6,116.84

366.00

5.98%

366.00

5.98%

UTILIDAD

S/.

152,920.93

0.00

9,150.05

5.98%

9,150.05

5.98%

SUB TOTAL

S/.

3,492,714.05

0.00

208,987.19

5.98%

208,987.19

5.98%

IGV

S/.

628,688.53

37,617.69

5.98%

37,617.70

5.98%

VALORIZACION TOTAL

S/.

4,121,402.58

246,604.88

5.98%

246,604.89

5.98%

Hoja 13 de 39

0.00

0.0%

0.0%

183001.05 5.9835187179

RIZACION N 01

SALDO
Metr.

Valorizado

2875417.56 94.0164812821

0.00

3392.96 29.7958699785

792.96

100

0.00

0.00

0.0%

0.5

2600

50

0.00

1747637.73 92.6792095408
5314.54 35.5240501591

9007.69

5314.54 36.3226909686

0.00
0.00

0.00
0.00

0.0%
0.0%

686287.25 84.2392297659
7122.01

34399.31 43.7186869744

514.93

10288.3 63.9624741217

154.74
7913.11
20547.89

2085.9

100

58161.36 42.6146963191
25890.34

100

1226.93

62107.2

100

20547.89

321163.52

100

20547.89

172191.32

100

1056035.94

100

9200.47

554236.31

100

10226.2

501799.63

100

229012.33 99.8720311312

0.00
0.00

0.00
0.00

0.0%
0.0%

3351.54

13473.19

100

4589.29

153374.07

100

447.8

13057.85

100

1216.12

5594.15

100

5681.83

100

169.13

67.65

100

18.15

4745.5

100

29.79

868.68

100

37831.24

100

37831.24

100

221.3

553905.78
20658.43

100

6209.17

3663.41

100

790.42

13539.89

100

156.27

3455.13

100

242513.65

100

1663.81

33242.92

100

2003.69

44301.59

100

6303.75

12166.24

100

6303.75

152802.9

100

276363.45

100

5822.96

186975.25

100

1175.62

37843.21

100

176.53

51544.99

100

Hoja 14 de 39

RIZACION N 01

SALDO
Metr.

Valorizado

14370.25

100

14370.25

100

11173.09

100

128.99

100

128.99

100

283.72

100

8.96

179.02

100

11.21

104.7

100

2344.25

234.53

10541.54
13.11

3827.99

100

208.56

6713.55

100

218.84

100

218.84

100

37548.42

100

35.7

69.21

617.35

100

122.47

236.37

100

0.2

3.01

100

86.51

635.85

100

12.25

360.76

100

41.87

13475.44

100

357.48

13834.48

100

30

340.5

100

1806.71

7967.59

100

4.05

77.07

100

5181.55

100

12.79

114.09

100

9.84

18.99

100

10.47

577.63

100

17.91

131.64

100

1.27

276.78

100

8.64

334.37

100

8.2

3728.05

100

46530.93

100

125.43

973.34

100

4.07

417.42

100

21.09

2040.88

100

156.79

1751.34

100

19.43

3380.04

100

74.37

26463.82

100

183.15

7087.91

100

4.07

1533.54

100

290.08

1279.25

100

58.28

1109.07

100

37

494.32

100

47860.91

100

643.39

5739.04

100

467.22

901.73

100

46.73

243

100

142.17

2578.96

100

455.81

6850.82

100

59.27

662.05

100

592.27

18538.05

100

274.66

11153.94

100

502.89

759.36

100

274.66

433.96

100

56146.17 67.5331506346
294.92

2630.69 41.3470575846

210.67

406.59 41.3486962535

21.77

113.2 42.1397461192

194.51

3528.41 46.2777496518

76.23

1145.74 32.9629672252

31.39

350.63 40.5610503789

351.1

10989.43 41.3477196246

188

15840.88

100

188

21140.6

100

Hoja 15 de 39

RIZACION N 01

SALDO
Metr.

Valorizado

18401.45

100

27.04

302.04

100

35.5

396.54

100

1.81

333.95

100

17.2

4919.2

100

188.5

6663.48

100

5.44

1487.84

100

16

4298.4

100

3204.58

100

3.62

40.44

100

4.52

50.49

100

4.83

1482.95

100

46.13

1630.7

100

13781.7

100

263.83

2353.36

100

376.9

727.42

100

37.69

195.99

100

113.07

2051.09

100

47.12

526.33

100

628.17

7927.51

100

29292.74 75.1743167579
112.18

1000.65 26.0303941563

177.49

342.56 36.8201556387

17.81

92.61 36.9037656904

94.05

1706.07 41.8707557288

12.38

186.07 19.1905857115

22.39

250.1 12.7937550515

284.01

687.3 35.8995252049

189

8848.98

100

189

11833.29

100

189

4345.11

100

25118.48

100

22.27

1038.67

100

31.17

764.6

100

22.27

895.03

100

22.27

334.72

100

3.33

546.19

100

18.3

3388.25

100

27

11344.32

100

27

6806.7

100

12631

100

12631

100

31597.74

100

2500

100

6813.45

100

80.15

582.69

100

24.07

2100.35

100

5.46

476.44

100

2.19

191.1

100

156.62

3462.87

100

10959.16

100

80.15

3249.28

100

24.07

3983.34

100

5.46

1010.92

100

220.89

1009.47

100

58.29

1706.15

100

0.00

11325.13

100

2.19

837.32

100

3.25

181.51

100

138.6

648.65

100

130.65

9657.65

100

3000

100

3000

100

252.62

0.00

2875417.56 94.0164812821

258787.5804 94.0164829558
5750.84 94.016518333
143770.88 94.0164828974
3283726.8604 94.0164815496
591070.83 94.0164806252

3874797.6904 94.0164814086

Hoja 16 de 39

VALORIZACIN DE ADICIONALES DE OBRA POR PARTIDAS NUEVAS


DICIEMBRE
0
Proyecto:
Ejecucin:
Modalidad:

"CONSTRUCCION DEL SISTEMA DE RIEGO EN EL SECTOR DE ROSARIOMAYO - ICHUPAMPA - HUAYNAPATA''


Municipalidad Distrital de Echarate
Administracin Directa

Departamento

: Cusco

Provincia
Distrito

: La Convencin
: Echarate

AVANCE DE OBRA

EXPEDIENTE

ANTERIOR

Descripcin

Item

P. U.
01

OBRAS PRELIMINARES

1.09

TRANSPORTE DE MATERIALES Y EQUIPO

13.47

COSTO DIRECTO TOTAL DE OBRA

Und

m3

S/.

Hoja 17 de 39

Metrado

300.00

COSTO

Metrado

4,041.00
4,041.00
4,041.00

0.00

0.00
0.00
0.00

0.00
0.00
0.00

4,041.00

Valorizado

ACTUAL
%

Metrado

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.00
0.00
0.00

0.0%
0.0%
0.0%

0.00

0.0%

0.00
0.00

Valorizado

4041

100

300

4041
4041

100
100

0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

4,041.00 100.0%

ES DE OBRA POR PARTIDAS NUEVAS


CIEMBRE

AVANCE DE OBRA

SALDO

ACUMULADO
Metr.
0.00
0.00

Valorizado

Metr.

4041

100

300

4041
4041

100
100

0.00
0.00
0.00

0.00
0.00
0.00

0.0%
0.0%
0.0%

4,041.00

100.0%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Valorizado

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0

Hoja 18 de 39

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0% DEDUCTIVO
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0

EJECUCION COMPROMISOS VS MARCO PRESUPUESTAL AL 21/12/2008


Proyecto:

#REF!

Ejecucin:

Municipalidad Distrital de Echarate

Modalidad:

Administracin Directa

SEC. FUNC.:

237

PARTIDA

COMPROM. PIA COMPROM. PIM


CSC

ENERO 2008

FEBRERO
2008

MARZO 2008

ABRIL 2008

MAYO 2008

JUNIO 2008

JULIO 2008

AGOSTO
2008

SETIEMBRE
2008

CSC

CSC

CSC

CSC

CSC

CSC

CSC

CSC

CSC

651108
651110

211,346.00

811,346.00

6,195.00

6,401.50

19,640.74

28,458.04

651111

45,937.00

153,299.00

708.03

766.81

2,244.77

3,043.40

651113

34,762.00

134,762.00

1,032.50

1,066.92

3,273.41

4,378.52

651118

334.00

334.00

2,458.00

40.20

333.33

651120
651122

21,628.00

51,628.00

651123

203,000.00

203,000.00

651127

197,523.00

197,523.00

651129

896,012.00

896,012.00

651130

108,299.00

108,299.00

651132

59,633.00

59,633.00

651139

146,664.00

196,664.00

651149

12,293.00

12,293.00

651151

699,099.00

749,099.00

651152

31,670.00

31,670.00

21,627.55

651124
651126
1,800.00

1,305.00

24,027.20

12,648.32

31,943.50

25,049.55

11,374.00

27,945.00

100,334.00

6,069.33

185,814.00

389,929.16

14,952.00

23,887.00

651133
651136
651137
651138

651155

2,617.80

4,218.00

2,292.75
13,349.00

685,750.00

798.00

651156
651157
651158

2,375.00

2,375.00

2,375.00

651165
651175
651176
651177

469.00

10,469.00

TOTAL

2,671,044.00

3,619,204.00

468.30
0.00

14,654.00

55,970.70

Hoja 19 de 39

0.00

63,418.17

707,677.33

40,731.56

331,560.22

455,805.65

OCTUBRE
2008

NOVIEMBRE
2008

DICIEMBRE
2008

EJECUTADO 2008

CSC

CSC

CSC

TOTAL

SALDO PIA

SALDO PIM

0.00

0.00

0.00

427,591.73

24,551.46

438,658.70

951,497.17

-740,151.17

-140,151.17

49,635.81

2,806.02

51,979.97

111,184.81

-65,247.81

42,114.19

71,265.24

4,092.01

73,109.42

158,218.02

-123,456.02

-23,456.02

15,933.31

16,266.64

-15,932.64

-15,932.64

0.00

0.00

0.00

46,047.05

-24,419.05

5,580.95

71,428.10

131,571.90

131,571.90

0.00

0.00

0.00

0.00

0.00

0.00

1,600.00

151,702.33

45,820.67

45,820.67

29,979.00

9,750.00

652,147.68

243,864.32

243,864.32

1,730.50

138,015.20

198,701.25

-90,402.25

-90,402.25

0.00

59,633.00

59,633.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

201,914.50

-55,250.50

-5,250.50

24,419.50
68,232.80

176.80

2,580.00

657.50

41,029.70

520.30

57,936.00

57,274.00

421.00

952.50

3,666.25

8,626.75

8,626.75

707,454.00

-8,355.00

41,645.00

38,904.60

-7,234.60

-7,234.60

675.81

-675.81

122.19

0.00

0.00

0.00

0.00

0.00

0.00

2,375.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8,939.89

9,408.19

-8,939.19

1,060.81

824,596.69

3,321,591.40

-650,547.40

297,612.60

8,355.00
10,441.20

600.00

27,863.40

675.81

671,433.98

155,743.10

Hoja 20 de 39

0
0%

C
T
V
K
G
S
U
H
P
A
f
G
S
V
-A
L
W
U
A
C
N
A
O
U
K
P
R
'A
S
'U
R
0
0
1
1

NOTA: - SE HAN CORREGIDO LAS VALORIZACIONES DE OBRA DE ACUERDO A LO REALIZADO CONJUNTAMENTE QUE LA SUPERVISION
- LA VALORIZACION DE MATERIALES EN CANCHA Y RESERVA CORRESPONDE A LOS MATERIALES QUE NO LLEGARON A OBRA CUYA RELACION SE ADJUNTA EN EL INFORME

(II)
( (I
I I)
)

(II)

( ( (I) (II) (
II
I
II
)
))

(II)

TP-CUS
CHANK
KfW

C
T
V
K
G
U
(S
H
P
A
f
G
S
V
-A
L
IA
W
U
C
N
A
O
)IRPKU'A
S
U
)0'R
0

1
1

CONTROL PRESUPUESTAL PROYECTO DE RIEGO SIETE TINAJAS

PROGRAMACION FINANCIERA

EJECUCION FINANCIERA

FUENTE DE FINANCIAMIENTO

CANON
SOBRECANON

VALORIZACION DE OBRA

FUENTE DE FINANCIAMIENTO
TOTAL

CANON
SOBRECANON

USUARIOS

TOTAL

GASTO GENERAL

USUARIOS

GASTOS DE
SUPERVISION

COSTO DIRECTO

GASTOS EN
G. P. S. R.

GASTOS EN
MITIGACION

FUENTE DE FINANCIAMIENTO
CANON
SOBRECANON

ENERO

0.00

0.00

0.00

FEBRERO

0.00

14,654.00

14,654.00

55,970.70

55,970.70

MARZO

SALDO VALORIZADO DE ALMACEN

COSTO DIRECTO VALORIZADO

MESES

GASTO GENERAL
TOTAL

GASTOS DE
SUPERVISION

TOTAL

CD

GG

TOTAL

USUARIOS
C
T
V
S
K
G
H
P
A
f
G
V
-A
L
W
A
C
N
A
O
U
K
P
'R
S
'U
0
0
1
1

(
I

0.00

0.00

0.00I

0.00

C
T
V
K
G
S
H
P
0.00 A
fV
G
-A
L
W
A
C
N
A
O
U
K
P
0.00 'R
S
'U
0
0
1
1

0.00
0.00

ABRIL

0.00

0.00

0.00

0.00

0.00

0.00

MAYO

0.00

63,418.17

63,418.17

0.00

0.00

0.00

0.00

JUNIO

0.00

707,677.33

707,677.33

#REF!

#REF!

0.00

0.00

#REF!

(
I
I
)

0.00

JULIO

0.00

40,731.56

40,731.56

#REF!

#REF!

0.00

0.00

#REF!

AGOSTO

0.00

331,560.22

331,560.22

#REF!

#REF!

0.00

0.00

#REF!

0.00

SETIEMBRE

0.00

455,805.65

455,805.65

#REF!

#REF!

0.00

0.00

#REF!

0.00

OCTUBRE

0.00

671,433.98

671,433.98

#REF!

#REF!

0.00

0.00

#REF!

0.00

NOVIEMBRE

0.00

0.00

0.00

0.00

0.00

DICIEMBRE

0.00

0.00

0.00

0.00

0.00

AO 2008

0.00

0.00

0.00
0.00

2,341,251.61

0.00

2,341,251.61

0.00
0.00

0.00

0.00

0.00

0.00

#REF!

0.00

#REF!

0.00

0.00

#REF!

0.00

TOTAL PROYECTO

0.00

0.00

0.00

2,341,251.61

0.00

2,341,251.61

0.00

0.00

0.00

0.00

0.00

#REF!

0.00

#REF!

0.00

0.00

#REF!

0.00

CHANK
TP-CUS
KfW

DESCRIPCION

PPTO BASE

1
Municipio
Usuarios
Sub Total - CD

EJECUCION PPTAL

SALDO POR FTE.


FTO.

3=1-2

PORC. DE EJEC/TOTAL
CD

#REF!
#REF!

2,341,251.61
0.00

#REF!
#REF!

#REF!
#REF!

#REF!

2,341,251.61

#REF!

#REF!

PORC. DE G.G./
EJEC. PPTAL.
(CD)

RESUMEN
VALORIZAC

SVA

EJECUCION REAL EFICACIA PPTAL

7
#REF!
0.00
#REF!

8=2-7

0.00

DESCRIPCION

PORC. DE AVANCE

2,341,251.61

#REF! AVANCE

FISICO DE OBRA CON RESPECTO AL C. DIRECTO PRESUPUESTO BASE

GG

946,037.03

0.00%

0.00

% DE GASTOS GENERALES CON RESPECTO AL C. D. PRES. BASE

GS

388,592.01

0.00%

0.00

% DE GASTOS DE SUPERVISION CON RESPECTO AL C. D. PRES. BASE

Utilidad (ob. Por


contrata.)

178,610.49

IGV(ob. Por contrata.)

557,519.87

#REF!
#REF!
#REF!

Nataly Ynga Huilca:

PRES. Obra

#REF!

2,341,251.61

#REF!

G.P.S.R.
MITIGACION
TOTAL

320,144.00
25,325.00
#REF!

2,341,251.61

#REF!

#REF!

0.00

#REF!

0.00

0.00

2,341,251.61

C
T
V
K
G
S
(
H
P
A
fV
G
V
T
-A
L
I(A
G
S
W
P
C
N
A
O
G
II'RPKUV
L
A
)I0'0USORAP'
)110'U0

1
1

9=8/7

2,341,251.61
0.00
0.00

0.00
0.00

#REF! AVANCE

DE VALORIZACION TOTAL CON RESPECTO AL PRES. BASE. TOTAL

#REF!

0.00

S10
Municipalidad Distrital de Echarate
Obra: "CONSTRUCCION DEL SISTEMA DE RIEGO EN EL SECTOR DE ROSARIOMAYO - ICHUPAMPA - HUAYNAPATA''

TOTAL DE INSUMOS
DESAGREGADO DE INSUMOS MENSUALIZADO

Descripcin insumo

Unidad

AGOSTO 2008

SETIEMBRE

OCTUBRE 2008

NOVIEMBRE
2008

DICIEMBRE
2008

ACUMULADO

Cant.

Cant.

Cant.

Cant.

Cant.

Cant.

Capataz J IV

hh

Operario J III

hh

Oficial J II

hh

Peon J I

hh

Topografo T 2

hh

0.00
86.4869
376.9393
532.5321
4606.7053
212

Tecnico T II

hh

0.00

Soldador J VI

hh

0.00

Ens

0.00

0.00
411.1428
2566.2139
2419.3892
25959.7359
238.424
4
24.42
15

%PU

0.00

0.00

0.00

MANO DE OBRA

Rotura de Briquetas
MANO DE OBRA, IND. LS.

MATERIALES

0.00
510.9819
2440.071
2060.543
34326.7602
231.504

0.00

0.00

###

337.75

130.07

1,476.43
###

1,643.08

842.59

7,868.90
###

1,242.02

821.84

7,076.32
###

20,349.01

13,124.91

98,367.13
###
1,219.34
###

210.43

326.98

0.00

0.00

0.00

4.00
###

12.4

32.00

0.00

68.82
###

0.00

0.00

0.00

15.00
###

0.00

0.00

0.00

0.00

0.00

0.00

121.4091
212.2883

69.6187
92.4411

32.15

43.67

312.69
###

40.61

30.00

391.62
###

0.00

0.00

18.75

0.00

98.87
###

0.00

12.54

0.00

22.64
###

11.78
7.75
2.6
13.0861

17.86

0.00

52.84
###

20.00

0.00

43.01
###

0.00

0.00

2.60
###

16.56

4.96

47.83
###

0.00

0.00

0.26

0.28
###

1.6803
1.6803
14.469
10.85
10.85
56.1241
69.5171

2.07

0.52

5.48
###

2.07

0.26

5.20
###

13.15

68.50

1,188.79
###

28.00

0.00

60.22
###

28.00

0.00

60.22
###

12.90

12.07

187.03
###

Clavos

kg

Alambre

kg

Calamina de 11 canales de 1.80 m N 17

pln

45.847
16.278
80.115

Hoja de sierra de 24 dientes

und

0.00

Soldadura Supercito de 1/8 ( 3.25 mm)

kg

0.00

Soldadura Punto Azul de 1/8 ( 3.25 mm)

kg

0.00

10.103
23.199
15.2625

Pisones de Mano

und

0.00

0.00

Barreta octogonal de 1" x 1.80 m

und

1.74

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 3'

und

0.00

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 5'

und

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 8'

und

Acero de Construccin Corrugado Fy=4200 Kg/cm-Grado 60

kg

0.25
0.25
13.25

Acero de Construccion Corrugado 5/8"

var

0.00

Acero de Construccion Corrugado 3/4"

var

0.00

Arena (Entre las mallas N100 y N 4)

m3

Grava (de " a 1")

m3

11.4678
16.758

Piedra de 4" a 8"

m3

0.00

Piedra de 10" a 12"

m3

0.00

Cemento Portland Tipo I

bls

Agua

m3

Aditivo Adherente

kg

Fulminante

und

11.492
0.0256
0.9654
0.9398
1079.4185
21.3675
21.3675
94.4649
113.7708
59.7188
63.5
1346.7496
60.2269
148.5
2443.77
2443.77
285.1065

###

###

15.86

14.08

229.98
###

0.00

99.78

205.78

365.28
###

0.00

0.00

0.00

63.50
###

827.79
125.4848

186.32

142.51

2,658.25
###

41.59

11.71

253.05
###

0.00

0.00

0.00

201.11
###

6476.76
6476.76
755.622

4,333.47

1,338.93

14,714.43
###

4,333.47

1,338.93

14,714.43
###

518.51

156.21

1,734.52
###

0.00

0.00

0.00

0.00

60.00
###

14.469
210.4911
2185.347

13.15

53.45

109.16
###

231.70

704.68

1,791.02
###

642.42

360.00

7,545.60
###

0.00

0.00

0.00

0.38
###

18.6
109.0514
1.014
2.0785
109.1954
2.8938

47.10

91.20

193.53
###

24.55

26.40

348.57
###

0.00

0.00

1.01
###

1.17

0.00

6.71
###

29.60

18.00

364.91
###

2.63

10.73

21.89
###

0.00

0.00

0.00

0.33
###
3.86
###

Guia (mecha)

Dinamita al 65%, 7/8" x 7"

kg

Saco de Polietileno

und

Yeso

QQ

Madera Corriente

p2

Madera Aguano

p2

Regla de Madera

p2

154.878
14.0299
52.608
121.5
121.5
19.075
60
13.25
417.1
401.7
0.135

Rollizo de Eucalipto 6"

0.00

Triplay de 6 mm x 2.40m x 1.20m

m2

19.41

14.8415
227.042
3956.13
0.24
36.633
169.155

Zaranda de 2 x 1.20 m x "

und

0.00

0.00

Tecnopor de 1" x 2.40 m x 1.20 m

pln

Petrleo D-2

gln

Pintura Esmalte

gln

0.764
19.86
2.65

Juego de Moldes Para Briquetas

und

0.00

2.6977
188.256
2.9803
0.3335

Latas Concreteras

und

0.00

0.00

2.6

0.87

0.38

Compuerta Metlica Segn Diseo

und

0.00

0.00

0.00

0.00

2.00
###

0.00

0.00

0.00

0.00

0.00

###

EQUIPOS
HERRAMIENTAS MANUALES

%MO

0.00

0.00

0.00

0.00

0.00

###

Camin Plataforma

hm

0.00

0.00

0.00

0.00

37.76
###

Cargador Frontal de 3.00 Yardas

hm

9.6

9.92

25.20

0.00

60.48
###

Medio Camion (Cap. 3.000 Kg)

hm

0.00

0.00

0.00

0.00

56.00
###

Retroexcavadora de 80 HP x 0.70 m

hm

0.00

37.7609
15.76
56
79.0362

38.8554

99.64

0.00

217.53
###

Tractor D6D (Bulldozer)

hm

0.00

72.40

8.00

115.91
###

hm

165.606
95.1712

32.00

672.70
###

hm

254.2268
158.015

45.01

Mezcladora de Concreto (Trompo) de 10 P - Motor de 8 HP

35.5067
175.8557
17.65

0.00

Volquete de 5 m

20.57

11.17

302.58
###

Hoja 22 de 39

S10
Municipalidad Distrital de Echarate
Obra: "CONSTRUCCION DEL SISTEMA DE RIEGO EN EL SECTOR DE ROSARIOMAYO - ICHUPAMPA - HUAYNAPATA''

TOTAL DE INSUMOS
DESAGREGADO DE INSUMOS MENSUALIZADO

Descripcin insumo

Unidad

AGOSTO 2008

SETIEMBRE

OCTUBRE 2008

NOVIEMBRE
2008

DICIEMBRE
2008

ACUMULADO

Cant.

Cant.

Cant.

Cant.

Cant.

Cant.

8
86.4
24.42
238.424

Motobomba de 10 HP de 4"

hm

0.00

Motosierra

hm

4.8

Soldadora Elctrica de 260 Amperios

hm

0.00

Teodolito

hm

212

Plancha Compactadora de 8 HP

hm

0.00

0.00

0.00

23.32

10.26

33.58
###

Compresora De Dos Martillos

hm

1,481.94
###

hm

210.43

326.88

1,219.24
###

hm

537.0424
231.504
95.1712

176.45

Vibrador de Aguja de 1" - Motor de 5 HP

302.1621
238.424
158.015

459.62

Miras Y Jalones

6.6667
212
17.65

20.57

11.17

302.58
###

Bomba para Pruebas Hidraulicas (Balde de Prueba)

hm

0.00

0.00

0.00

0.00

266.56

266.56
###

Nivel

hm

212

238.424

231.504

210.43

60.32

952.68
###

%PU

0.00

0.00

0.00

0.00

0.00

###

0.00

0.00

0.00

49.60

0.00

MAQUINARIA, EQUIPO IMP.


Volquete de 8 m

Hoja 23 de 39

0.00

0.00

0.00

8.00
###

80
12.4
231.504

153.60

88.00

412.80
###

32.00

0.00

68.82
###

210.43

326.88

1,219.24
###

S10
Municipalidad Distrital de Echarate
Obra:"CONSTRUCCION DEL SISTEMA DE RIEGO EN EL SECTOR DE ROSARIOMAYO - ICHUPAMPA - HUAYNAPATA''

DESAGREGADO DE INSUMOS MENSUALIZADO


Descripcin insumo

Unidad

AGOSTO 2008
Cant.
Total

P. U.

MANO DE OBRA
Capataz J IV

hh

Operario J III

hh

Oficial J II

hh

Peon J I

hh

Topografo T 2

hh

86.4869
4.21 376.939
3.88 532.532
3.55 4606.71
9.10
212

Tecnico T II

hh

9.10

0.00

Soldador J VI

hh

5.54

0.00

Ens

20.00

0.00

Rotura de Briquetas
MANO DE OBRA, IND. LS.

5.54

%PU

0.00

MATERIALES

0.00

SETIEMBRE
Cant.
Total

22415.27
479.14 411.1428
1586.91 2566.214
2066.22 2419.389
16353.8 25959.74
1929.2 238.424
0.00
4
0.00
24.42
0.00
15
0.00

kg

4.00

Alambre

kg

4.00

Calamina de 11 canales de 1.80 m N 17

pln

14.00

45.847
16.278
80.115

Hoja de sierra de 24 dientes

und

5.00

0.00

Soldadura Supercito de 1/8 ( 3.25 mm)

kg

10.00

0.00

Soldadura Punto Azul de 1/8 ( 3.25 mm)

kg

12.00

0.00

Pisones de Mano

und

50.00

0.00

0.00

Barreta octogonal de 1" x 1.80 m

und

80.00

1.74

139.2

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 3'

und

456.00

0.00

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 5'

und

532.00

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 8'

und

875.00

Acero de Construccin Corrugado Fy=4200 Kg/cm-Grado 60

kg

2.80

0.25
0.25
13.25

Acero de Construccion Corrugado 5/8"

var

38.00

0.00

Acero de Construccion Corrugado 3/4"

var

54.00

0.00

Arena (Entre las mallas N100 y N 4)

m3

2.00

Grava (de " a 1")

m3

11.4678
2.00 16.758

Piedra de 4" a 8"

m3

2.00

0.00

Piedra de 10" a 12"

m3

2.00

0.00

Cemento Portland Tipo I

bls

25.00

Agua

m3

Aditivo Adherente

kg

Fulminante

und

Guia (mecha)

Dinamita al 65%, 7/8" x 7"

kg

Saco de Polietileno

und

Yeso

QQ

Madera Corriente

p2

Madera Aguano

p2

Regla de Madera

p2

Rollizo de Eucalipto 6"

154.878
0.50 14.0299
25.00 52.608
0.50
121.5
0.50
121.5
9.00 19.075
1.00
60
5.00
13.25
1.70
417.1
3.20
401.7
3.20
0.135
3.00

0.00

Triplay de 6 mm x 2.40m x 1.20m

m2

32.00

19.41

Zaranda de 2 x 1.20 m x "

und

100.00

0.00

Tecnopor de 1" x 2.40 m x 1.20 m

pln

24.00

Petrleo D-2

gln

13.00

0.00

11.492
0.00
0.0256
133 0.9654
218.75 0.9398
37.1 1079.419
0.00 21.3675
0.00 21.3675
22.94 94.4649
33.52 113.7708
0.00 59.7188
0.00
63.5
3871.95 1346.75
7.01 60.2269
1315.2
148.5
60.75 2443.77
60.75 2443.77
171.68 285.1065
0.00
60
66.25 14.8415
709.07 227.042
1285.44 3956.13
0.43
0.24
0.00
36.633
621.12 169.155
0.00

0.00

Pintura Esmalte

gln

25.00

0.764
19.86
2.65

Juego de Moldes Para Briquetas

und

500.00

0.00

Latas Concreteras

und

12.00

0.00

0.00

0.00

Compuerta Metlica Segn Diseo

und

400.00

0.00

0.00

0.00

19974.33
662.2

EQUIPOS
HERRAMIENTAS MANUALES

%MO

0.00

Hoja 24 de 39

117267.13
2277.73 510.9819
10803.76 2440.071
9387.23 2060.543
92157.06 34326.76
2169.66 231.504
0.00
36.4
135.29
12.4
0.00
300

18.34 2.6977
258.18 188.256
66.25 2.9803
0.00
0.3335

NOVIEMBRE 2008
Cant.

145,133.84
2,830.84

333.79

10,272.70

1,574.53

7,994.91

1,167.83

121,860.00

19,758.32

2,106.69

171.84

0.00

0.00

68.70

12.40

0.00

0.00

0.00

0.00

0.00

74336.35
485.64 69.6187
849.15 92.4411

52,368.04

0.00

10527.04
183.39 121.4091
65.11 212.2883
0.00
1121.61
0.00
10.103
0.00
23.199
0.00 15.2625

Clavos

OCTUBRE 2008
Cant.
Total

278.47

28.96

369.76

33.01
18.75

0.00

0.00

0.00

50.52
231.99
183.15

0.00

0.00

0.00

11.78
7.75
0.00
2.6
919.36 13.0861
0.00
11.67
513.59 1.6803
822.33 1.6803
3022.37 14.469
811.97
10.85
1153.85
10.85
188.93 56.1241
227.54 69.5171
0.00
119.44
0.00
127
33668.74 827.79
30.11 125.4848
0.00
3712.5
1221.89 6476.76
1221.89 6476.76
2565.96 755.622

117.80

11.78

93.00

7.75

0.00

130.00

0.00

1,046.89

16.46

0.00

0.00

893.92

2.07

1,470.26

2.07

40.51

10.74

412.30

10.85

585.90

10.85

112.25

12.90

139.03

15.86

0.00

99.78

0.00

0.00

20,694.75

186.32

62.74

41.59

0.00

0.00

3,238.38

4,303.47

3,238.38

4,303.47

6,800.60

515.01

0.00

0.00

0.00

74.21 14.469
385.97 210.4911
12659.62 2185.347
0.00
0.77
109.9
18.6
5412.96 109.0514
0.00
1.014
64.74 2.0785
2447.33 109.1954
74.51 2.8938
0.00
166.75
0.00
2.6
0.00
800
75197.4
0.00
6080.95

72.35

10.74

357.83

199.52

6,993.11

642.42

0.00

0.00

55.80

18.60

3,489.64

24.55

101.40

0.00

49.88

1.17

1,419.54

29.60

72.35

2.15

0.00

0.00

31.20

0.87

0.00

0.00

82,163.13
8,558.23

0.00

S10
Municipalidad Distrital de Echarate
Obra:"CONSTRUCCION DEL SISTEMA DE RIEGO EN EL SECTOR DE ROSARIOMAYO - ICHUPAMPA - HUAYNAPATA''

DESAGREGADO DE INSUMOS MENSUALIZADO


Descripcin insumo

Unidad

AGOSTO 2008
Cant.
Total

P. U.

SETIEMBRE
Cant.
Total

37.7609
15.76
56
79.0362

0.00
3776.09
2364
9.92
0.00
2800
11065.07 38.8554

0.00
5326.01
9672.06 254.2268
134.14 158.015
0.00
8
24
86.4
0.00
24.42
1325 238.424

Camin Plataforma

hm

100.00

0.00

0.00

Cargador Frontal de 3.00 Yardas

hm

150.00

9.6

1440

Medio Camion (Cap. 3.000 Kg)

hm

50.00

0.00

0.00

Retroexcavadora de 80 HP x 0.70 m

hm

140.00

0.00

0.00

Tractor D6D (Bulldozer)

hm

150.00

Volquete de 5 m

hm

55.00

Mezcladora de Concreto (Trompo) de 10 P - Motor de 8 HP

hm

35.5067
175.856
7.60
17.65

Motobomba de 10 HP de 4"

hm

5.00

0.00

Motosierra

hm

5.00

4.8

Soldadora Elctrica de 260 Amperios

hm

10.00

0.00

Teodolito

hm

6.25

212

Plancha Compactadora de 8 HP

hm

5.00

0.00

Compresora De Dos Martillos

hm

100.00

Miras Y Jalones

hm

0.50

Vibrador de Aguja de 1" - Motor de 5 HP

hm

5.00

Nivel

hm

2.50

6.6667
212
17.65
212

MAQUINARIA, EQUIPO IMP.

%PU

0.00

NOVIEMBRE 2008
Cant.
0.00

0.00

1,488.00

9.92

0.00

0.00

5,439.76

38.86

0.00

0.00

72.40

13982.47 165.606
1200.91 95.1712
0.00
40
432
80
244.2
12.4
1490.15 231.504

9,108.33

8.00

723.30

20.57

0.00

0.00

0.00

0.00

400.00

137.60

124.00

12.40

1,446.90

171.84

0.00

0.00

23.32

30216.21 537.0424
119.21 231.504
790.08 95.1712
596.06 231.504

53,704.24

459.62

115.75

171.84

0.00

52,916.64

Hoja 25 de 39

0.00

666.67 302.1621
106 238.424
88.25 158.015
530 238.424

0.00

TOTAL PRESUPUESTO

OCTUBRE 2008
Cant.
Total

266,800.88

0.00

475.86

20.57

578.76

171.84

0.00

0.00

279,665.01

S10
Municipalidad Distrital de Echarate
Obra:"CONSTRUCCION DEL SISTEMA DE RIEGO EN EL SECTOR DE ROSARIOMAYO - ICHUPAMPA - HUAYNAPATA''

DESAGREGADO DE INSUMOS MENSUALIZADO


Descripcin insumo

Unidad

NOVIEMBRE 2008
P. U.
Total

DICIEMBRE 2008
Cant.
Total

ACUMULADO
Cant.
Total

###

84,783.60

Capataz J IV

hh

5.54

1,849.18

118.87

658.55

1,461.27

8,095.44

Operario J III

hh

4.21

6,628.77

479.73

2,019.67

7,437.49

31,311.82

Oficial J II

hh

3.88

4,531.17

499.28

1,937.22

6,679.57

25,916.75

Peon J I

hh

3.55

70,142.04

4,533.74

16,094.79

89,185.27

316,607.70

Topografo T 2

hh

9.10

1,563.74

60.32

548.91

914.09

8,318.20

Tecnico T II

hh

9.10

0.00

0.00

0.00

4.00

36.40

Soldador J VI

hh

5.54

68.70

0.00

0.00

49.22

272.68

Ens

20.00

0.00

0.00

0.00

15.00

MANO DE OBRA

Rotura de Briquetas
MANO DE OBRA, IND. LS.

%PU

MATERIALES

21,259.14

396,858.99

0.00

300.00
6,000.00

###

23,625.18

Clavos

kg

4.00

115.84

36.68

10,046.38
146.70

302.51

170,902.97
1,210.04

Alambre

kg

4.00

132.04

30.00

120.00

384.02

1,536.07

Calamina de 11 canales de 1.80 m N 17

pln

14.00

262.50

0.00

0.00

98.87

1,384.11

Hoja de sierra de 24 dientes

und

5.00

0.00

0.00

0.00

10.10

50.52

Soldadura Supercito de 1/8 ( 3.25 mm)

kg

10.00

117.80

0.00

0.00

46.76

467.59

Soldadura Punto Azul de 1/8 ( 3.25 mm)

kg

12.00

93.00

0.00

0.00

30.76

369.15

Pisones de Mano

und

50.00

0.00

0.00

0.00

2.60

130.00

Barreta octogonal de 1" x 1.80 m

und

80.00

1,316.48

2.17

173.66

44.94

3,595.59

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 3'

und

456.00

0.00

0.02

7.34

0.04

19.02

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 5'

und

532.00

1,103.16

0.28

146.46

5.24

2,790.13

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 8'

und

875.00

1,814.40

0.26

226.80

5.20

4,552.54

Acero de Construccin Corrugado Fy=4200 Kg/cm-Grado 60

kg

2.80

30.07

18.58

52.02

1,136.46

3,182.08

Acero de Construccion Corrugado 5/8"

var

38.00

412.30

0.00

0.00

43.07

1,636.57

Acero de Construccion Corrugado 3/4"

var

54.00

585.90

0.00

0.00

43.07

2,325.65

Arena (Entre las mallas N100 y N 4)

m3

2.00

25.81

12.07

24.14

187.03

374.06

Grava (de " a 1")

m3

2.00

31.71

14.08

28.16

229.98

459.96

Piedra de 4" a 8"

m3

2.00

199.55

205.78

411.57

365.28

730.55

Piedra de 10" a 12"

m3

2.00

0.00

0.00

0.00

63.50

127.00

Cemento Portland Tipo I

bls

25.00

4,658.08

142.51

3,562.68

2,658.25

66,456.19

Agua

m3

0.50

20.80

11.71

5.85

253.05

126.52

Aditivo Adherente

kg

25.00

0.00

0.00

0.00

201.11

5,027.70

Fulminante

7,289.72

und

0.50

2,151.74

1,233.93

616.97

14,579.43

Guia (mecha)

0.50

2,151.74

1,233.93

616.97

14,579.43

7,289.72

Dinamita al 65%, 7/8" x 7"

kg

9.00

4,635.07

143.96

1,295.63

1,718.77

15,468.93

Saco de Polietileno

und

1.00

0.00

0.00

0.00

60.00

60.00

Yeso

QQ

5.00

53.70

3.53

17.65

56.83

284.15

Madera Corriente

p2

1.70

339.19

38.77

65.91

1,092.93

1,857.98

Madera Aguano

p2

3.20

2,055.74

360.00

1,152.00

7,545.60

24,145.91

Regla de Madera

p2

3.20

0.00

0.00

0.00

0.38

1.20

Rollizo de Eucalipto 6"

3.00

55.80

91.20

273.60

165.03

495.10

Triplay de 6 mm x 2.40m x 1.20m

m2

32.00

785.74

26.40

844.80

348.57

11,154.26

Zaranda de 2 x 1.20 m x "

und

100.00

0.00

0.00

0.00

1.01

101.40

Tecnopor de 1" x 2.40 m x 1.20 m

pln

24.00

28.05

0.00

0.00

6.71

161.02

Petrleo D-2

gln

13.00

384.78

18.00

234.00

364.91

4,743.83

Pintura Esmalte

gln

25.00

53.70

0.75

18.85

11.43

285.65

Juego de Moldes Para Briquetas

und

500.00

0.00

0.00

0.00

0.33

166.75

Latas Concreteras

und

12.00

10.49

0.38

4.62

3.86

46.31

Compuerta Metlica Segn Diseo

und

400.00

0.00

0.00

0.00

2.00

800.00

###

71,919.92

EQUIPOS
HERRAMIENTAS MANUALES

%MO

Hoja 26 de 39

4,952.84

0.00

14,017.75

258,829.43

1,167.81

15,478.94

S10
Municipalidad Distrital de Echarate
Obra:"CONSTRUCCION DEL SISTEMA DE RIEGO EN EL SECTOR DE ROSARIOMAYO - ICHUPAMPA - HUAYNAPATA''

DESAGREGADO DE INSUMOS MENSUALIZADO


Descripcin insumo

Unidad

NOVIEMBRE 2008
P. U.
Total

DICIEMBRE 2008
Cant.
Total

ACUMULADO
Cant.
Total

Camin Plataforma

hm

100.00

0.00

0.00

0.00

37.76

3,776.09

Cargador Frontal de 3.00 Yardas

hm

150.00

1,488.00

0.00

0.00

45.20

6,780.00

Medio Camion (Cap. 3.000 Kg)

hm

50.00

0.00

0.00

0.00

56.00

2,800.00

Retroexcavadora de 80 HP x 0.70 m

hm

140.00

5,439.76

0.00

0.00

156.75

21,944.58

Tractor D6D (Bulldozer)

hm

150.00

10,860.00

8.00

1,200.00

115.91

17,386.01

Volquete de 5 m

hm

55.00

440.00

32.00

1,760.00

635.69

34,962.87

Mezcladora de Concreto (Trompo) de 10 P - Motor de 8 HP

hm

7.60

156.30

11.17

84.92

302.58

2,299.57

Motobomba de 10 HP de 4"

hm

5.00

0.00

0.00

0.00

8.00

40.00

Motosierra

hm

5.00

688.00

32.00

160.00

340.80

1,704.00

Soldadora Elctrica de 260 Amperios

hm

10.00

124.00

0.00

0.00

49.22

492.20

Teodolito

hm

6.25

1,074.00

60.32

377.00

914.09

5,713.05

Plancha Compactadora de 8 HP

hm

5.00

116.61

10.26

51.30

33.58

167.91

Compresora De Dos Martillos

hm

100.00

45,962.06

89.80

8,979.89

1,395.29

139,529.07

Miras Y Jalones

hm

0.50

85.92

60.32

30.16

914.09

457.04

Vibrador de Aguja de 1" - Motor de 5 HP

hm

5.00

102.83

11.17

55.87

302.58

1,512.88

hm

2.50

429.60

60.32

150.80

914.09

2,285.22

Nivel
MAQUINARIA, EQUIPO IMP.

TOTAL PRESUPUESTO

%PU

0.00

###

Hoja 27 de 39

180,328.70

1,500.00

45,323.27

826,591.39

Municipalidad Distrital de Echarate


Obra: PROYECTO DE RIEGO SIETE TINAJAS

II SIFON INVERTIDO SIETE TINAJAS


DESAGREGADO DE INSUMOS MENSUALIZADO

Descripcin insumo

Unidad

P. U.

AGOSTO 2008
SIFON
Cant. Total

SETIEMBRE
SIFON
Cant. Total

0.00

0.00

Capataz J IV

hh

12.18

0.00

0.00

Operario J III

hh

10.97

0.00

0.00

Oficial J II

hh

7.94

0.00

0.00

Peon J I

hh

4.91

0.00

0.00

Topografo T 2

hh

9.10

0.00

0.00

Soldador J VI

hh

10.97

0.00

0.00

###

Err:511

MANO DE OBRA

MATERIALES
Clavos

kg

3.40

0.00

0.00

Alambre

kg

3.40

0.00

0.00

Hoja de sierra de 24 dientes

und

8.40

0.00

0.00

Soldadura Punto Azul de 1/8 ( 3.25 mm)

kg

10.08

0.00

0.00

Barreta octogonal de 1" x 1.80 m

und

73.95

0.00

0.00

Acero de Construccin Corrugado Fy=4200 Kg/cm-Grado 60

kg

2.35

0.00

0.00

Acero de Construccion Corrugado 5/8"

var

31.93

0.00

0.00

Acero de Construccion Corrugado 3/4"

var

47.60

0.00

0.00

Fulminante

und

0.42

0.00

0.00

Guia (mecha)

0.42

0.00

0.00

Dinamita al 65%, 7/8" x 7"

kg

7.60

0.00

0.00

Yeso

QQ

4.20

0.00

0.00

Madera Corriente

p2

1.50

0.00

0.00

Rollizo de Eucalipto 6"

2.50

0.00

0.00

Pintura Esmalte

gln

25.21

0.00

0.00

###

Err:511

EQUIPOS

OCTUBRE 2008
SIFON
Cant. Total

NOVIEMBRE 2008
SIFON
Cant.
Total

0.00

4,308.22

3.71
0.00 51.78
0.00 67.79
0.00 541.91
0.00 38.59
0.00
13.2
###
0.00
2.26
0.00
5.12
0.00 12.54
0.00
8.25
0.00
0.1
0.00
2.41
0.00 11.55
0.00 11.55
0.00
30
0.00
30
0.00
3.5
0.00
2.41
0.00 32.18
0.00
19.2
0.00
0.48
###
0.00

HERRAMIENTAS MANUALES

%MO

Cargador Frontal de 3.00 Yardas

hm

150.00

0.00

0.00

0.00

Retroexcavadora de 80 HP x 0.70 m

hm

140.00

0.00

0.00

0.00

Motosierra

hm

5.00

0.00

0.00

0.00

Soldadora Elctrica de 260 Amperios

hm

10.00

0.00

0.00

0.00

Teodolito

hm

6.25

0.00

0.00

0.00

Miras Y Jalones

hm

0.50

0.00

0.00

0.00

Nivel

hm

2.50

0.00

0.00

0.00

Volquete de 8m

hm

70.00

0.00

0.00

0.00

45.19
568.03
538.25
2,660.78
351.17
144.80

Err:511
7.68
17.41
105.34
83.16
7.40
5.66
368.79
549.78
12.60
12.60
26.60
10.12
48.27
48.00
12.10

Err:511
153.56

TOTAL PRESUPUESTO

###

Hoja 28 de 39

###

10.32
41.35
16
13.2
38.59
38.59
38.59
49.6

1,548.00
5,789.00
80.00
132.00
241.19
19.30
96.48
3,472.00

Err:511

DICIEMBRE 2008
SIFON
Cant.
Total

ACUMULADO
SIFON
Cant.
Total

0.00

4,308.22

0.00

3.71

45.19

0.00

51.78

568.03

0.00

67.79

538.25

0.00

541.91

2,660.78

0.00

38.59

351.17

0.00

13.20

0.00

144.80

1,315.51

0.00

2.26

7.68

0.00

5.12

17.41

0.00

12.54

105.34

0.00

8.25

83.16

0.00

0.10

7.40

0.00

2.41

5.66

0.00

11.55

368.79

0.00

11.55

549.78

0.00

30.00

12.60

0.00

30.00

12.60

0.00

3.50

26.60

0.00

2.41

10.12

0.00

32.18

48.27

0.00

19.20

48.00

0.00

0.48

0.00

12.10

Err:511
153.56

0.00

10.32

1,548.00

0.00

41.35

5,789.00

0.00

16.00

80.00

0.00

13.20

132.00

0.00

38.59

241.19

0.00

38.59

19.30

0.00

38.59

96.48

0.00

49.60

3,472.00

0.00

Hoja 29 de 39

Err:511

S10
Municipalidad Distrital de Echarate
Obra: PROYECTO DE RIEGO SIETE TINAJAS

IV ASPERSION SIETE TINAJAS


DESAGREGADO DE INSUMOS MENSUALIZADO
AGOSTO 2008
Descripcin insumo

Unidad

SETIEMBRE

OCTUBRE 2008

NOVIEMBRE 2008

P. U.
Cant. Total

MANO DE OBRA

Cant. Total

Cant. Total

0.00

0.00

0.00

Cant.

Total

305.45
0.25
16.77
6.4
48.78

173.17

6.4

35.46

Capataz J IV

hh

5.54

0.00

0.00

0.00

Operario J III

hh

4.21

0.00

0.00

0.00

Oficial J II

hh

3.88

0.00

0.00

0.00

Peon J I

hh

3.55

0.00

0.00

0.00

Topografo T 2

hh

9.10

0.00

0.00

0.00

Soldador J VI

hh

5.54

0.00

0.00

0.00

###

Err:511

###

Clavos

kg

4.00

0.00

0.00

0.00

Alambre

kg

4.00

0.00

0.00

0.00

Soldadura Supercito de 1/8 ( 3.25 mm)

kg

10.00

0.00

0.00

0.00

Soldadura Punto Azul de 1/8 ( 3.25 mm)

kg

12.00

0.00

0.00

0.00

Barreta octogonal de 1" x 1.80 m

und

80.00

0.00

0.00

0.00

0.00

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 3'

und

456.00

0.00

0.00

0.00

0.00

Barreno Exagonal para Compresora / Motoperforadora 7/8" x 5'

und

532.00

0.00

0.00

0.00

0.00

Acero de Construccin Corrugado Fy=4200 Kg/cm-Grado 60

kg

2.80

0.00

0.00

0.00

Acero de Construccion Corrugado 5/8"

var

38.00

0.00

0.00

0.00

Acero de Construccion Corrugado 3/4"

var

54.00

0.00

0.00

0.00

Fulminante

und

0.50

0.00

0.00

0.00

0.00

Guia (mecha)

0.50

0.00

0.00

0.00

0.00

Dinamita al 65%, 7/8" x 7"

kg

9.00

0.00

0.00

0.00

0.00

Yeso

QQ

5.00

0.00

0.00

0.00

0.00

Madera Corriente

p2

1.70

0.00

0.00

0.00

Rollizo de Eucalipto 6"

3.00

0.00

0.00

0.00

Pintura Esmalte

gln

25.00

MATERIALES

EQUIPOS

1.39
70.60
24.83
0.00

665.54
0.93
2.48
6.08
4

3.72
9.92
60.80
48.00

0.00

5.6
5.6

212.80
302.40

0.00

9.3

27.90

0.00

0.00

0.00

0.00

###

Err:511

###

5,585.84

HERRAMIENTAS MANUALES

%MO

Cargador Frontal de 3.00 Yardas

hm

150.00

0.00

0.00

0.00

22.09

Retroexcavadora de 80 HP x 0.70 m

hm

140.00

0.00

0.00

0.00

Volquete de 5 m

hm

55.00

0.00

0.00

0.00

Motosierra

hm

5.00

0.00

0.00

0.00

Soldadora Elctrica de 260 Amperios

hm

10.00

0.00

0.00

0.00

Teodolito

hm

6.25

0.00

0.00

0.00

0.00

Compresora De Dos Martillos

hm

100.00

0.00

0.00

0.00

0.00

Miras Y Jalones

hm

0.50

0.00

0.00

0.00

0.00

Bomba para Pruebas Hidraulicas (Balde de Prueba)

hm

2.50

0.00

0.00

0.00

0.00

###

6,556.83

TOTAL PRESUPUESTO

###

Hoja 30 de 39

4.96
19.43
37.01

2,720.20

6.4

64.00

744.00
2,035.55
0.00

DICIEMBRE 2008
Cant.

ACUMULADO

Total

Cant.

35,766.48
11.2
362.86
322.56
8591.17
266.66

62.05

11.45

63.43

1,527.64

379.63

1,598.24

1,251.53

328.96

1,276.36

30,498.65

8,639.95

30,671.82

2,426.61

266.66

2,426.61

0.00

6.40

2,474.46
6.99

2.79
0.24
0.24
49.92

Total

36,071.92

35.46

3,140.00

27.96

7.92

0.00

2.48

31.68
9.92

0.00

6.08

60.80

0.00

4.00

48.00

223.20

2.79

223.20

109.44

0.24

109.44

127.68

0.24

127.68

139.78

49.92

139.78

0.00

5.60

212.80

0.00

5.60

302.40

52.50

105.00

52.50

52.50

105.00

52.50

110.25

12.25

110.25

105
105
12.25
49.92
665.91

249.60

49.92

249.60

1,132.05

665.91

1,132.05

0.00

9.30

27.90

9.98

249.50

9.98

249.50

11,432.77

Err:511

22.09

56
266.56
86.65
266.56
266.56

44.18

0.00

4.96

744.00

0.00

19.43

2,720.20

0.00

37.01

2,035.55

280.00

56.00

280.00

0.00

6.40

64.00

1,666.00

266.56

1,666.00

8,665.00

86.65

8,665.00

133.28

266.56

133.28

666.40

266.56

666.40

49,673.71

Hoja 31 de 39

Err:511

CUADRO COMPARATIVO DE PERSONAL VALORIZADO VS


Proyecto
Ejecucin
Modalidad
Mes

: Irrigacin Siete Tinajas


: Municipalidad Distrital de Echarate
: Administracin Directa
#NAME?
MES ACTUAL - DIAS HOMBRE

4,000.00

20,000.00

3,500.00

18,000.00

ACUMUL

16,000.00

3,000.00

14,000.00
2,500.00

12,000.00

2,000.00

10,000.00
8,000.00

1,500.00

6,000.00
1,000.00
4,000.00
500.00

2,000.00
0.00

0.00

Desagregado - Valorizado
Capataz J-IV

PERSONAL DE
OBRA

ValorIzado
HORA-HOMBRE

Capataz J-IV
Operarios J-III
Oficiales J-II
Peones J-I
TOTAL

DIAS-HOMBRE

Capataz J-IV
Operarios J-III
Oficiales J-II
Peones J-I
TOTAL

MES-HOMBRE

HORA-HOMBRE
HORA-HOMBRE
HORA-HOMBRE
HORA-HOMBRE

DIAS-HOMBRE
DIAS-HOMBRE
DIAS-HOMBRE
DIAS-HOMBRE

MES-HOMBRE
MES-HOMBRE
MES-HOMBRE
MES-HOMBRE

Oficiales J-II

Peones J-I

Aug-08

UNID.

Capataz J-IV
Operarios J-III
Oficiales J-II
Peones J-I
TOTAL

Nota:

Operarios J-III

Desagregado - Valoriz

Ejecutado
Capataz J-IV

TOTAL

Sep-08

Ejecutado.

ValorIzado

Oct-08
Ejecutado.

ValorIzado

Operarios J-III

Oficial

Nov-08
Ejecutado.

ValorIzado

86.49
376.94
532.53
4,606.71
5,602.66

480.00
984.00
552.00
15,032.00
17,048.00

411.14
2,566.21
2,419.39
25,959.74
31,356.48

624.00
2,408.00
2,336.00
23,656.00
29,024.00

510.98
2,440.07
2,060.54
34,326.76
39,338.36

832.00
3,384.00
1,552.00
41,440.00
47,208.00

337.75
1,643.08
1,242.02
20,349.01
23,571.86

10.81
47.12
66.57
575.84
700.33

60.00
123.00
69.00
1,879.00
2,131.00

51.39
320.78
302.42
3,244.97
3,919.56

78.00
301.00
292.00
2,957.00
3,628.00

63.87
305.01
257.57
4,290.85
4,917.29

104.00
423.00
194.00
5,180.00
5,901.00

42.22
205.39
155.25
2,543.63
2,946.48

0.42
1.81
2.56
22.15
26.94

2.31
4.73
2.65
72.27
81.96

2.14
13.37
12.60
135.21
163.32

3.25
12.54
12.17
123.21
151.17

2.55
12.20
10.30
171.63
196.69

4.16
16.92
7.76
207.20
236.04

1.69
8.22
6.21
101.75
117.86

La diferencia de mano de obra utilizada con la mano de obra segn partidas ejecutadas, refleja una deficiencia por parte de la residencia de obras, cabe resaltar q
efectuando la reformulacin del proyecto, as mismo los rendimientos que presentan los costos unitarios de excavacin en material suelto no estn a acorde con el

Hoja 32 de 39

RSONAL VALORIZADO VS EJECUTADO

ACUMULADO - DIAS HOMBRE

00

00

00

00

00

00

00

00

00

00

00

Desagregado - Valorizado
Capataz J-IV

Operarios J-III

Ejecutado

Oficiales J-II

Peones J-I

Nov-08

TOTAL

Dec-08
Ejecutado.

ValorIzado

Total - 08
Ejecutado.

ValorIzado

Ejecutado.

768.00
3,648.00
1,432.00
34,304.00
40,152.00

130.07
842.59
821.84
13,124.91
14,919.42

384.00
1,576.00
1,760.00
24,376.00
28,096.00

1,346.36
7,026.30
6,254.48
85,242.21
99,869.36

2,704.00
10,424.00
5,872.00
114,432.00
133,432.00

96.00
456.00
179.00
4,288.00
5,019.00

16.26
105.32
102.73
1,640.61
1,864.93

48.00
197.00
220.00
3,047.00
3,512.00

168.29
878.29
781.81
10,655.28
12,483.67

338.00
1,491.00
734.00
14,950.00
17,513.00

4.00
19.00
7.46
178.67
209.13

0.65
4.21
4.11
65.62
74.60

2.00
8.21
9.17
126.96
146.33

te de la residencia de obras, cabe resaltar que se tiene partidas nuevas no valorizadas, por cuanto se viene
en material suelto no estn a acorde con el normal rendimiento.

Hoja 33 de 39

CUADRO COMPARATIVO DE MATERIAL VALORIZADO VS EJECU


Proyecto
Ejecucin
Modalidad
Mes

: Irrigacin Siete Tinajas


: Municipalidad Distrital de Echarate
: Administracin Directa
#NAME?
MES ACTUAL

ACUMULADO

300.00

3,100.00
3,000.00

250.00
2,900.00
200.00

2,800.00
2,700.00

150.00
2,600.00
100.00

2,500.00
2,400.00

50.00
2,300.00
2,200.00

0.00

Desagregado - Valorizado

Desagregado - Valorizado

Ejecutado

Cemento

Cemento

PERSONAL DE
OBRA
Cemento

Nota:

UNID.

Aug-08
ValorIzado

Bolsa

154.88

Sep-08

Ejecutado.
270.00

ValorIzado
1,346.75

Oct-08

Ejecutado.
1,316.00

ValorIzado
827.79

Nov-08

Ejecutado.
973.00

ValorIzado
186.32

Ejecutado.
411.00

La diferencia de sustancial de cemento, se debe a que no se ha valorizado partidas nuevas, por cuanto se viene efectuando la reformulacin del proyecto y la aprob

Hoja 34 de 39

AL VALORIZADO VS EJECUTADO (CEMENTO)

ACUMULADO

Desagregado - Valorizado

Ejecutado

Cemento

Dec-08
ValorIzado
142.51

Total - 08

Ejecutado.
243.00

ValorIzado
2,515.74

Ejecutado.
2,970.00

uando la reformulacin del proyecto y la aprobacin de dichas partidas.

Hoja 35 de 39

CUADRO COMPARATIVO DE MAQUINARIA VALORIZADO VS E


Proyecto
Ejecucin
Modalidad
Mes

: Irrigacin Siete Tinajas


: Municipalidad Distrital de Echarate
: Administracin Directa
#NAME?
ACUMULADO

MES ACTUAL
300.00

1,000.00
900.00

250.00

800.00
700.00

200.00

600.00
500.00

150.00

400.00
100.00

300.00
200.00

50.00

100.00
0.00

0.00

Desagregado -Valorizado
Volquete 5 m3

PERSONAL DE
OBRA
Volquete 5 m3
Retroexcavadora

Nota:

UNID.

HM

Volquete 5 m3

Retroexcavadora

Aug-08
ValorIzado

HM

Desagregado-Valorizado

Ejecutado

175.86
0.00

Sep-08

Ejecutado.
226.00
42.00

ValorIzado

Oct-08

Ejecutado.

322.81
79.04

218.00
139.00

ValorIzado
165.61
38.86

Retroexcav

Nov-08

Ejecutado.
268.00
192.00

ValorIzado
184.63
99.64

Ejecutado.
196.00
250.00

La utilizacin de retroexcavadora en el proyecto ha suscitado la inclusin de partidas nuevas, que no se estn valorizando, lo cual refleja un desfase de horas
comparativo de maquinaria utilizada versus lo requerido segn costos unitarios, siendo subsanados una ves aprobado la reformulacin del expediente tcnico.

Hoja 36 de 39

QUINARIA VALORIZADO VS EJECUTADO

ACUMULADO

Desagregado-Valorizado
Volquete 5 m3

Ejecutado
Retroexcavadora

Dec-08
ValorIzado
32.00

Total - 08

Ejecutado.
75.00
310.00

ValorIzado
848.91
217.53

Ejecutado.
908.00
623.00

n valorizando, lo cual refleja un desfase de horas maquinas en el cuadro


robado la reformulacin del expediente tcnico.

Hoja 37 de 39

ICSA CONSTRUCTORES SRL


RUC: 20483981202

DATOS GENERALES
Fecha 28 de Diciembre del 2012

Mes que corresponde : Diciembre 2012

DATOS GENERALES
1 Obra

"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS


URBANAS DE LA ZONA ESTE DE BAOS DEL INCA''

2 Ubicacin : Departamento
Provincia
Distrito

:
:
:

Cajamarca
Cajamarca
Los Baos del Inca

Los Baos del Inca

Lugar
3 Entidad Contratante

4 Contratista

ICSA CONSTRUCTORES SRL

5 RESIDENTE DE OBRA

Victor Manuel Blanco Leiva

CIP

18812

6 INSPECTOR DE OBRA

:Ing Segundo Pedro Rojas Salazar

CIP

44815

7 Financiamiento

Canon, Sobrecanon y Regalias Mineras

8 Sistema de Contratacion

Precios Unitarios

9 Contrato No.

LP N 03-2012-MDBI/CE

10 Presupuesto Referencial.

S/. 4,121,402.58

11 Monto del contrato, con IGV

S/. 4,121,402.58

12 Factor de Relacion

MUNICIPALIDAD DISTRITAL DE BAOS DEL INCA

1.00000

13 Fecha de Firma de Contrato

26/11/2012

14 Plazo de ejecucin, en d. n.

150

15 Adelanto Directo

No se otorg adelanto

16 Adelanto de Materiales

S/. 126,872.84

17 Fecha Entrega Terreno Por el Sup Obra.

04/12/2012

18 Fecha de Inicio de Ejecucion de la Obra

05/12/2012

19 Fecha de Culminacion de Obra

03/06/2013

(20%)

dias naturales.

Proyecto:

"CONSTRUCCIN DE LA PAVIMENTACIN DE LAS VIAS URBANAS DE LA ZONA ESTE DE BAOS


DEL INCA''
Ejecucin: ICSA CONSTRUCTORES SRL
Modalidad:Precios Unitarios

RESUMEN GENERAL DE LA VALORIZACION


DICIEMBRE DEL 2012
ITEM
1.00
1.01

CONCEPTO
Valorizacion Contractual
Valorizacion Contractual

1.1.0
1.1.1
1.1.2

Reintegros
Reajuste reconocido
Reintegro por Reajuste
Total Monto Bruto (A)
Descuentos
Amortizaciones de Adelanto Directo
Amortizaciones de Adelanto Directo
Amortizaciones de delanto Materiales
Amortizaciones de Adelanto Materiales
Deduccion que no corresponde a Adelanto directo
Deduccion que no corresponde a Adelanto directo
Deduccion que no corresponde a Adelanto de Materiales
Deduccion que no corresponde a Adelanto de Materiales
Total de Descuentos
Total Neto
IGV

2.00
2.1.0
2.1.1
2.2.0
2.2.1
2.3.0
2.3.1
2.4.0
2.4.1

PARCIAL

TOTAL

S/. 208,987.19

S/. 208,987.19

S/. 126,872.84

S/. 126,872.84
S/. 82,114.35
S/. 14,780.58

TOTAL A PAGAR AL CONTRATISTA


S/. 96,894.93
SON: NOVENTA Y SEIS MIL OCHOCIENTOS NOVENTA Y CUATRO CON 93/100 NUEVOS SOLES