Professional Documents
Culture Documents
Chino
Chino
4:1
A = 4a
4a
Q med
4.2
16.5
A = 111.348 m2 a = 5.28 m
5.3
Q max
21.2
3.- TR y Cs
Q med
Vol = (4m)(4.2m)(16.5m) = 277.2 m3
Cs = Q/A = (2721.6 m3/d) / (4.2x16.5) = 39.27 m3/m2/d
TR = V/Q = (277.2 m3) / (2721.6 m3/d) = 0.10185 das x 24 = 2.44 horas
Q max
Vol = (4m)(5.3m)(21.2m) = 449.44 m3
Cs = Q/A = (4453.92 m3/d) / (5.3x21.2) = 39.64 m3/m2/d
TR = V/Q = (449.44 m3) / (4453.92 m3/d) = 0.100908 das x 24 = 2.42 horas
4.- VA
)(
5.- VH
VH = Q/A = (0.05155 m3/s) / (4x4.2) = 0.00307 m/s
6.- Remocin de DBO y SST
Q med
=
(
)
=
Q max
=
(
)
=
)(
)(