You are on page 1of 1

From TO

K.NAGI REDDY, The principal,


Assistant Executive Engineer, K.S.R.M. COLLAGE OF
ENGINEERING
A.P.E.W.I.D.C., KADAPA.
Proddatur.

Lr. No. /SWGH/2013-2014 dated

Sir,
Sub:- Works - A.P.E.W.I.D.C., - Construction of Social Welfare Girls Hostel at
Mydukur Village and Mandal in YSR District Design Mix result for M20
concrete mix design and material testing Requested Regarding.

I submit herewith the following samples of materials and request to conduct the following tests
and M20 concrete mix design.

1. Cement (IS 85112-1989)-
a. Fineness
b. 1.Intial setting time
2. Final setting time
c. Soundness
d. Compressive strength for 7 days & 28 days.

2. Course Aggregate - 40mm HBT Metal.
a. Sieve Analysis
b. Flakiness Index
c. Aggregate impact value

3. 20mm H.B.G. Metal
a. Sieve analysis
b. Flakiness index
c. Aggregate impact value

4. Fine aggregate- Sand
a) Gradations for concrete (finess modules)
b) Bulkage
c) Silt Content

5. HYSD steel bars fe415
6mm,8mm,10mm,12mm,16mm,20mm,25mm,.
a) Weight for meter length
b) Ultimate tensile strength
c) Elongation in %
d) Proof stress
.
The necessary charges will be paid soon after receiving the results from your end.