You are on page 1of 15

prefabricated panels

.
.

6/1

store types

6/1/1

:

:
30 3

30 3 :
1 ).(6/2
2 ).(6/3
3 ).(6/4

6/1/2


)/6/1/1 ( .

6/2
:

)(




.

6/2/1
:
1 .
2 .
3
4 .
5 .

6/3
resistance

thermal


).(6/1

) : (6/1

Cooler

Chill cooler

Holding freezer

Blast Freezer

)o(
4 10

) o .2 /(
/


4.4 6.2
3 5.3

2- 2

2.6 3.5

4.4 6.2

5.3 7

23- 29

6.3 6.2

5.8 8.8

7 8.8

40-

6.2 7

8.8 10.6

8.8 10.6

)(14

6/4

vapor barrier


.

.
)
(

6/4/1

vapor resistivity rv

) (6/2 .

).(6/2

) (6/2

)(15


Vapor Resistivity

)(MNs / g.m
1

7
8


) (


2
3
30/3
25/3
15/


0.4 0.5
- 0.1

80-135
54-80
27-54
80-135
380-800
27-54
80-190
54
10000
7000-16000
200-540
160-380
100-270
160-540
5.4
27-160
360000-324000
216000-100000
130000
46000
92000
184000

- 0.3

350000

6/4/2

vapour resistance Rv

Rv = rvL

:
: Rv
: L
: rv

)(MNs / g
)(m
)(MNs/g.m

6/4/3

total vapour resistance Rvt

RVT
= R
vi
:

i =1

:
= Rvi (i (MNs/g
: n


1 / 2
.

) (W :

)W = 0.005

pi ps ps po

R vo
2 R vi
) kg/m

:
pi
Ps
Po
Rvi

Rvo

6/5
materials used in cold store construction


.

6/5/1
6/5/1/1
- 1 .
2 .
3 .

6/5/1/2
.
1 . Polyurethane foam
2 . Expanded bead polystyrene
3 . Extruded polystyrene
4 . Polyethlen foam
6/5/1/3


:
1 .
2 .
3 .
4 .
5 .
6 / .
7 .
8 .
6/5/1/4
- 1
. .
- 2
.
- 3 .

6/5/1/5
) (U

.PTFE

6/5/1/6 :
). (6/4

6/5/1/7


.

)
(
.

6/5/2

) (6/1
:

6/5/2/1
1 .
2 )
) ((15
.
3 .
4
.
5 . 6/2

6/5/2/2
1 .
2
.
3 .
4
).(6/2
5 .

6/6 :

6/6/1 ) (
roofs
:
1
.
2 .
3 .
4
.

6/6/2

cold store

doors

) (

) ( .
6/6/2/1
1 .
2 .
3 .
) (.
.


.

.

6/6/3

port doors

loading bays

6/6/4



.
.

valve stations

6/6/5



/

.

cooler pods

6/6/6


.
.

6/7

storage equipment in cold

stores
:
1 ) (Static racking )(Mobile racking
2 )(Fork lift trucks
.

6/8

floors

6/8/1

base

slab


) -6/5(.
1 .
2 .
3 .
4 .
5 .
6 .
7 .

.

6/8/2

frost heave prevention


) (6/5 :

) (Base slab
.
) (Ventilation ducts .


.


.

6/8/3

vapour seal


) 250
( .
.

6/8/4

insulation

floor

:

40
/ .3
.

).(Wearing floor
.
.

6/8/5

wearing floor

:
.

) .( 19

6/9

6/9/1

performance

inspection pre

commissioning
:
.
.
.
.

6/9/2 :
cooling the store down to temperature
/

1o
) (6/3

6/9/3

thermographic testing

techniques




). (OFF

) (6/3

)(16

1
2
3
4
5
6
7
8
9
10

6/9/4

performance of the insulating envelope

:

48
.
)
( .

1o
) 12( .
.

.
)
( .

:
1 .
2 ) (

.

6/10
maintenance
:

6/10/1 :



6/10/2 :
1
2

6/10/3 :
1 )(6/10/2

2
3
4
5 ) (

6/10/4 :
1
2
3

6/10/5 :

.

6/10/6 :


.
.