Professional Documents
Culture Documents
ENVIRONMENT
Program Outline
4. Roping Up
a. Minimum Knot Skills (Figure 8 Follow-through; Bowline; Double Overhand
(Fisherman's) Bend; Butterfly; Prussik; Munter)
b. Kiwi Coil
i. Purpose
ii. Tying a Kiwi Coil
c. Number of persons per team
d. Selecting the order of persons on a rope team
e. Spacing along the rope
5. Roped Up Travel
a. Rope Management/Protection
b. Belay Options (Team Arrest (unbelayed); Running Belays; Fixed Belays)
c. Route Finding with Team Protection in Mind