You are on page 1of 1

General Issues Faced by Tool & Die Developers

Pressure on timely proposal and profitability


Locating a similar job
Dealing with imported design data
Validate components for moldability
Identifying Parting lines, complex parting surfaces
Identifying Side action, lifters, shrinkage
Generation of detailed drawings
Making the drawing of bought out mold components
Finding interferences before assembly
Design changes - effect of changes late in design cycle
Accurate BOM/assembly documentation
Version control at all project phases
Export design for NC programming
Accuracy of machined vs. designed
Chandigarh Office Ludhiana Office Gurgaon Office Mumbai Office
SCO:41 (Top Floor), SCF-139(2nd Floor), #8/37, First Floor, Above Plot No.7, Sector 1A,
Sector 31D Chandigarh Phase II, Urban Estate, DCB Bank Jharsa Road, Koperkhairne Navi
160047. Chandigarh Road, Kirti Nagar, Mumbai-400709 Tele:
Tele : +91.172.5075202. Ludhiana 141010.Tele: Gurgaon.122001Tele: +91.22. 27547829,
+91.161. +91. 124.4721999, Fax: Telefax:27547830
2675652,4645620-21 4721909

You might also like