PROJECT MANAGEMENT GANTT, PERT AND CPM BACKGRAOUND In 1958 and 1959 in united states Construction Projects Innovative project control techniques Application Construction projects computer programs Programming Tender proposals Installation of computer systems.
Original Description:
Original Title
Administración de proyectos Gantt, PERT y CPM.pptx
PROJECT MANAGEMENT GANTT, PERT AND CPM BACKGRAOUND In 1958 and 1959 in united states Construction Projects Innovative project control techniques Application Construction projects computer programs Programming Tender proposals Installation of computer systems.
PROJECT MANAGEMENT GANTT, PERT AND CPM BACKGRAOUND In 1958 and 1959 in united states Construction Projects Innovative project control techniques Application Construction projects computer programs Programming Tender proposals Installation of computer systems.
BACKGRAOUND In 1958 and 1959 in united states Construction Projects Innovative project control techniques Application Construction projects Computer programs Programming Tender proposals Maintenance Planning Installation of computer systems GANTT CHART Used to represent the project in the form of network Identifies the different types of time Is represented by a double chart as shown below If there is an increase in the duration of an activity is called critical activity This chart shows that each activity has four times: Earliest start time Later start time Earliest completion time Completion Time Later Clearance REPRESENTATION BY A NETWORK There is another way to represent the network projects, through the activity node technique Their symbolism is as follows
The union of the nodes form a chain, called critical path PERT METHOD PERT: Program Evaluation and Review Technique Its main use is to determine the minimum duration of a project Deterministic PERT and Probabilistic PERT Also used to identify activities that can be a bottleneck and that conform the critical path For deterministic PERT the decision maker clearly knows the activities and the time duration PROBABILISTIC PERT The time duration of activities varies Probability distribution in three times a = optimistic time, if all goes well, under ideal conditions m = Most probably time, if all goes within normal b = Pessimistic time, if all goes wrong, under terrible conditions CPM CRITICAL PATH METHOD Assumed that the activity times are deterministic
Assign importance in the time and cost
The CPM method is a negotiation or bartering of duration and direct costs, but smartly The graph shows the behavior of the direct costs Having as variables CC = direct cost at minimum duration or critical Cn = direct cost at normal duration Dc = Minimum duration or crtical in the activity Dn = Normal duration of the activity
if we add the points we get the graph of total costs