Professional Documents
Culture Documents
()
(02)2754-9805
(02)2705-9181
(02)8773-7335
(02)2773-3317
E-mail joe@etdc.org.tw
1/27
1.
(Energy Service Company)
Retrofit Engineering
Performance Contract
ESCOs
Financing program
2/27
ESCO
ESCO
ESCO
ESCO
3/27
Self-sufficient project
Guaranteed savings
Turn-key project
Project financing
No cure, no pay
Financing program
One stop shopping
ESCO
ESCO
4/27
2.
l
l
l
l
l
l
l
3.
(ESCOs)
(M&V)
1.ESCOs
2.
3.ESCOs
4.ESCOs
5/27
Performance Contract
Department of Energy1994
Measurement & Verification
M&VEnergy Conservation
Measurement
ESCO
ECMs199712International Performance
Measurement and Verification Protocol (IPMVP)
6/27
4.
Project Finance
1.
2.(Construction financing)
3.
4.
Guaranteed Saving Contract,
GSCShared Saving Contract, SSC
GSC
(Credit)
SSC
7/27
5.
()
8/27
()
(MTBE)
oxygenated gasoline additive
1990
; MTBE
51,000mg/l at 25MTBE
9/27
MR3 SYSTEM
MTBE
MTBE1.9-5.3g/kgdayMTBEMTBE
MTBE1.4g/kg-day
MTBE
MTBE
MTBE
1996Santa MonicaMTBE
MTBE
0.001~0.0412mg/kg1~833.1ug/l
MTBE
200120032004
10/27
MR3 SYSTEM
15MTBE
MTBE1999
MTBE
MTBE
MTBE
MTBE
14/
MTBE()
()
11/27
90
800cc(M15SSF0.8L)
18.2
2.0Mazda323Protege2.0
13.8IxionMAV2.0
13
(Rolls-Royce)(Bentley)AstonMartin5,900ccDB-7
DB-76
6.74.8
(
2002/03/14)
12/27
(2002/03/06)
13/27
S.D.E.
S.D.E.
S.D.E.
500
150
S.D.E.400
2305,0002,500
(2002/03/14)
14/27
(2002/03/13 )
GIS
15/27
3413
12325
1.81.6
100
16/27
21
( 2002/3/15)
17/27
(2002/03/20 )
18/27
(2002/03/18)
19/27
20/27
(03/21)
(Circulation)
25
2.5ug/m3(O3)
21/27
2%
4%
150ug/m3 PM2.5(24)
199660,000(
ENS 2002 /03/12)
22/27
92
BACT
921
10100
TEL(04) 2350-7800 100 E-mail00283@etdc.org.tw
23/27
24/27
ISO 14000
ISO 14000
91420()30
1.ISO 14000 39
2. 29
3. 22
4. 26
130(14)
12
9148
(02)87737335*221
http://www.etdc.org.tw
25/27
..
319~21
4
350
26/27
Q A
Q
A
1.
2.
3.
4.
27/27
1.
2.
3.
4.
5.
6.
(www.ctciectdc.org.tw)
28/27