ESTRUCTURA DE DIVISION DE TRABAJO (EDT)
- EXCAVACION DE ZANJAS
PARA CIMIENTOS.
- ENCOFRADO Y
DESENCOFRADO DE
SOBRECIMIENTOS
- ELIMINACION DE
MATERIAL EXCAVADO
-MURO DE LADRILLO
CONSTRUCCION DE CERCO PERIMETRICO
05.00.00 ALBAILERIA
03.02.00 SOBRECIMIENTO
03.01.00 CIMIENTOS
CORRIDOS
FRENTE 1
01.00.00 OBRAS
PROVISIONALES
- TRAZO NIVELACION Y
REPLANTEO
02.00.00 MOVOMIENTO
DE TIERRAS
03.00.00 CONCRETO SIMPLE
04.00.00 CONCRETO
ARMADO
04.01.00
COLUMNAS
- CONCRETO EN
COLUMNAS
FC=210KG/CM2
- ENCOFRADO Y
DESENCOFRADO
- ACERO GRADO 60EN
COLUMNAS
- CONCRETO CICLOPEO FC=110 KG/CM2 +
30% PG
-CONCRETO 1:.8+25% PM
PARA SOBRECIMIENTOS