You are on page 1of 8

2008-08845-MN-0

BSCE V-1 CEM


FOOTING
FOOTING DESIGNATION: F1 (CORNER)
P (Fy) =
Mx =
My =

132.125
455.96
452.136

Ultimate Bearing Under Footing


+-q1

240 + Stdnt# (45) = 285


285 = (P/A) + (6Mx/bd^2) + (6My/db^2)
b=d

q4
++-

285 =
132.125 /b^2 +
2735.76 /b^3 +
b = 2.74
; d = 2.74

2712.816 /b^3

16.48346707
-247.2702844

1
1.)

2.)
4

2
3.)
3
3

18.7141993

4.)
282.4679507

Reinforcement of Footing:
b=
300
(assumed value)
d = 2.74*0.25 =
0.685
=
0.0059
As:
1.21245 mm^2
# of bars = 2pcs. Of 32mm
Summary:
Top bars
Bottom bars

Internal:
b/ba =
Spacing:

Spacing (mm)
130
130

9.133333

say 10 * 2pcs = 20pcs of

129.5 mm or 130mm

Sizes
32
32

No. of bars
20
20

FOOTING DESIGNATION: F2 (EXTERNAL)


P (Fy) =
Mx =
My =

132.125
455.96
452.136

Ultimate Bearing Under Footing


+-q1

240 + Stdnt# (45) = 285


285 = (P/A) + (6Mx/bd^2) + (6My/db^2)
b=d

q4
++-

285 =
132.125 /b^2 +
2735.76 /b^3 +
b = 2.74
; d = 2.74

2712.816 /b^3

16.48346707
-247.2702844

1
1.)

2.)
4

2
3.)
3

18.7141993

4.)
282.4679507

Reinforcement of Footing:
b=
300
(assumed value)
d = 2.74*0.25 =
0.685
=
0.0059
As:
1.21245 mm^2
# of bars = 2pcs. Of 32mm
Summary:
Top bars
Bottom bars

Internal:
b/ba =
Spacing:

Spacing (mm)
130
130

9.133333

say 10 * 2pcs = 20pcs of

129.5 mm or 130mm

Sizes
32
32

No. of bars
20
20

FOOTING DESIGNATION: F3 (INTERNAL)


P (Fy) =

131.645

Ultimate Bearing Under Footing

Mx =
My =

454.304
452.14

+-q1

240 + Stdnt# (45) = 285


285 = (P/A) + (6Mx/bd^2) + (6My/db^2)
b=d

q4
++-

285 =
131.645 /b^2 +
2725.824 /b^3 +
b = 2.73
; d = 2.73

2712.84 /b^3

17.02544728
-249.6396859

1
1.)

2.)
4

2
3.)
3

18.30174079

4.)
284.966874

Reinforcement of Footing:
b=
300
(assumed value)
d = 2.73*0.25 =
0.6825
=
0.0059
As:
1.208025 mm^2
# of bars = 2pcs. Of 32mm
Summary:
Top bars
Bottom bars

Internal:
b/ba =

9.1

Spacing:

129 mm or 130mm

Spacing (mm)
130
130

Sizes
32
32

say 10 * 2pcs = 20pcs of

No. of bars
20
20

FOOTING DESIGNATION: F4 (INTERNAL-CIRCULAR)


P (Fy) =
Mx =
My =

159.554
550.618
552.016
240 + Stdnt# (45) = 285

Ultimate Bearing Under Footing


+-q1

285 = (P/A) + (6Mx/bd^2) + (6My/db^2)


b=d

q4
++-

285 =
159.554 /b^2 +
3303.708 /b^3 +
b = 2.92
; d = 2.92

3312.096 /b^3

19.04984551
-247.0130772

1
1.)

2.)
4

2
3.)

18.37603177

4.)
284.4389545

Reinforcement of Footing:
b=
300
(assumed value)
d = 2.92*0.25 =
0.73
=
0.0059
As:
1.2921 mm^2
# of bars = 2pcs. Of 32mm
Summary:
Top bars
Bottom bars

Internal:
b/ba =
Spacing:

Spacing (mm)
130
130

9.733333

say 10 * 2pcs = 20pcs of

138.5 mm or 130mm

Sizes
32
32

No. of bars
20
20

REINFORCED CONCRETE DESIGN2


ENGR. JONATHAN V. AQUINO

RNER)

ate Bearing Under Footing


+-+
q2

q1:
q2:
q3:
q4:

-247.27
16.48347
282.468
18.7142

X:

41.11

X:

0.17

X:

0.19

X:

36.21

q3
+++

say 10 * 2pcs = 20pcs of 32mm


or 130mm

Kpa
Kpa
Kpa
Kpa

ERNAL)

ate Bearing Under Footing


+-+
q2

q1:
q2:
q3:
q4:

-247.27
16.48347
282.468
18.7142

X:

41.11

X:

0.17

X:

0.19

X:

36.21

q3
+++

say 10 * 2pcs = 20pcs of 32mm


or 130mm

ERNAL)

ate Bearing Under Footing

Kpa
Kpa
Kpa
Kpa

+-+
q2

q1:
q2:
q3:
q4:

-249.64
17.02545
284.9669
18.30174

X:

40.04

X:

0.17

X:

0.19

X:

37.24

Kpa
Kpa
Kpa
Kpa

q3
+++

say 10 * 2pcs = 20pcs of 32mm


or 130mm

L-CIRCULAR)

ate Bearing Under Footing


+-+
q2

q1:
q2:
q3:

-247.013 Kpa
19.04985 Kpa
284.439 Kpa

q4:

18.37603 Kpa

q3
+++

X:

37.86

X:

0.21

X:

0.2

X:

39.24

say 10 * 2pcs = 20pcs of 32mm


or 130mm

You might also like