You are on page 1of 1

NOTE:-

MINIMUM CEMENT CONSUMPTION SHOULD BE AS PER THE CHART PROVIDED


FOR THE TENDER NAMED " CIVIL WORKS AT LONI TERMINAL" FOR ALL THE
JOBS INCLUDING CIVIL BUILDING STRUCTURES, RCC DRIVE WAY, DYKEWALL,
FIRE BREAK WALL ETC COMPLETE.
NOTE : 30 Bags / CuM
SR.NO. DESCRIPTION NO. OF CEMENT BAGS
1 M10 ( 1:3:6 ) 4.4
2 M15 (1:2:4 ) 4.8
3 M20 (1:1.5:3 ) 5.5
4 M25 (1:1:2 ) 7.5
5 PCC M10 (1:3:6 ) 3
& (1:4:8 ) 2.3
NOTE : 30 Bags / CuM
SR.NO. DESCRIPTION NO. OF CEMENT BAGS
1 (1:4) 6
2 (1:5) 5
3 (1:6) 4.3
NOTE : 30 Bags / CuM
SR.NO. DESCRIPTION NO. OF CEMENT BAGS

1 20 MM THICK (1:4 ) 18
2 12 MM THICK (1:4) 10.8
NOTE : 30 Bags / CuM
SR.NO. DESCRIPTION NO. OF CEMENT BAGS

1 ( 1:3 ) 2.5
2 (1:4 ) 2

3 (1:5 ) 1.65

4 (1:6 ) 1.4
ACTUAL CEMENT CONTENT REQUIRED MAY VARY AS PER APPROVED MIX
DESIGN BUT MINIMUM CONSUMPTION SHALL BE AS PER THE CHART.
CEMENT CONSUMPTION FOR CONCRETE GRADES
CEMENT CONSUMPTION FOR CEMENT MORTAR
CEMENT CONSUMPTION FOR PLASTER
CEMENT CONSUMPTION FOR BRICK WORK / CuM

You might also like