You are on page 1of 16

51fIFFEL

r"

CONTENTS

1. Introduction
,- , 2. Company & Management Structure
3. Technical Capacity
4. Projects Data Sheets
5. Financial Capacity
6. Health & Safety Policy Statement
Health Safety & Environmental Guide
NTS Certificates
7. AF AQ Certificates
Standard Quality Plan
8. Brochures STRlJCfUR,i\L STEELWORK I GLAZiNG 1~ITRODUCTlm4

i1EIFFEL

1. INTRODUCTION

1.1 Introduction

In 1866 Mr Gustave Eiffel formed a Steelwork Construction company in Paris by the name of Les Ateliers de Construction Gustave Eiffel. In the years 1887-1889 the company was used to construct the Eiffel Tower in Paris, and in the years 1898-1900 The Grand Palais on the Champs Elysees, two of Paris most iconic and visited buildings

In 1966, the formation of Compagnie Francaise D'Entreprises Metalliques (CFEM) combines the Eiffel Steelwork Company along with three other large structural companies.

In 1988 CFEM completed the Pyramid du Louvres.

In 1989 CFEM is rebranded Eiffel Construction Metallique, and in 1993 forms a cornerstone in the establishment of the Eiffage Group along with Fougerolle.

The group now has five key divisions.

Eiffage Construction Eiffage Concessions

Eiffel Construction Metallique Forclum

Eiffage Travaux Publics

In the years 2002-2004, Eiffel was a fundamental part of the construction of the Millau Viaduct, which incidently is owned by Eiffage Concessions.

In 2006 Eiffage was the 6th largest construction group in Europe (2nd largest in France) with a turnover in excess of 13 billion of Euros. The group has ongoing concerns in each of the following European countries: France, UK, Belgium, Holland, Germany, Spain, Portugal,

Italy, Poland, Czech Republic, Hungary, and has companies involved in such activities as; quaries, wind power, marine works, electrical installation, oil rig manufacture, road building, bridge building and power generation. In addition to this Eiffage Concessions owns the Millau Viaduct and in excess of 40% of the Autoroute Network.

Eiffage recently completed the construction of a 150Km section of a A24 from Visew to Chaves under the Consortum and are in the final stage of the new Perpignan to Figeras TGV line in Consortium (TP Ferro) ACS Dragados which will place Barcelona in only 5h30 by train from Paris, this line after completion will be operated as a concession by the Consortium.

Eiffel UK Ltd was set-up in 1985 to provide a Sales & Marketing base in the Uk for Eiffel.

The primary objective was to sell offshore manufacturing skills and resulted in Eiffel building two of BP's largest oil chilling platform - Bruce and COBO.

STRUCTLR,lIL STEELWORK I GLAZI~JG II"ITRODUCTIO~~

5lflFFfL

In 1995, Eiffel expanded its operations in the UK to encompass its first construction project - the provision of the suspended curved fixed point facade for the Channel 4 building.

This was followed up by a number of prestigious projects, including:

Natwest Tower/ Tower 42 Entrance National Maritime Museum Paddington Rail Station Concorde Lower Precinct Country Manchester Art Gallery

40 Grosvenor Place

Chineham Court

Havilland Land, Guernsey Electronic Arts HQ

Festival Place, Basingstoke

OS8/ Waitrose building - Canary Wharf

In 2003 Eiffel Uk Limited was restructured to give the company a more independent footing, and now whilst still marketing on behalf of Eiffel Construction Metallique, Eiffel UK is one of the foreign divisions of Eiffel Construction Metallique, actively tendering and executing

contracts to our stewardship. Eiffel Construction Metallique.

A brief list of big projects installation since 2003:

AstraZeneca HQ Building

CTRL - Startford & Ebbsfleet Stations Tesco A4 Bridge

Kildare County Council Link Structure, Eire Collins Theatre

Canopy - Paradise Project, Liverpool

Screens, Ballestrades and glass floors - Terminal 5 The living Bridge - University of Limerich, Eire Colchester Art Gallery

Christs Wall - Cambridge

338 Euston Road - North & South elevation refurbishment Grosvenor Apartments - Park Lane

OLR - 3 car extension

East London Line - Oalston Station Steelwork

In turn, Eiffel UK has developed to provide a complete management team for UK/Ireland projects on behalf of Eiffel, covering all aspects from project management through construction management and covering all necessary aspects 0 Health & Safety and Quality management.

In 2007, Eiffel UK acquired the assets of Horwich Steelworks Limited (ESL) with factories in Bolton and Wigan. During the course of 2007-2008 saw an ambitious investment programme in the company, which consolidated the factories out one site in Wigan, along with in excess

ST~UCTUR.:".L STECL'I'IORK i GLAZI:-...G If'lPODUCTlOi'

5lEIFFEL

of £2.5 Million in investment, including new machinery and equipment, a new factory unit and training.

ESL now employs more than 45 personnel and has the capacity to produce a wide variety of steelwork, from "simple" beam and column to the more complex tabular and architectural steelwork, as well as line for providing plate and box gerder sections.

The investment has included a new Peddinghaus saw a drill line (the largest model made by Peddinghaus) a new Peddinghaus plate cutting machine, a new ESAB profile burner, two mobile ESAB sub-arc welders and a new twin head ESAB "robot" sub-arc gravity.

The new factory and equipment have resulted in the company having a weekly output capacity of between 300-400 tonnes, dependent upon the nature and complexity.

In 2008, Eiffel UK Ltd unveiled Eiffel EZI panel, which is a metal lured modular parelling system for a use in hotels, student accommodation and the like. Eiffel UK are happy to announce that the system has recently been chosen by hotel chain Easy Hotels as their modular panel system for their franchise hotel chain.

STRUCTURAL STEELWORK! GLA21 'G ,HTRODUCTlmJ

EJEIFFEL

1.2 Company Details

Company Name:

Company Address:

Authorised Representative:

Tel:

Email Address:

Company Name:

EIFFEL CONSTRUCTION METALLIQUE SAS

Eiffel Construction Metallique 48/50 Rue de Seine

92707 Colombes Cedex FRANCE

www.eiffel.fr

Mr Barrie Rowe

Business Development Manager EI FFEL UK LTD

Studio 2D

114b Power Road London W4 5PY

02087475990 browe@eiffeluk.com

Eiffel Steelworks Limited Studio 2D

114b Power Road London

W45PY

STRUCTUR."'.~ STEELWORK I GLAZI G ir'ITPODUCTIOtJ

5lf/FFEL

(

2. COMPANY AND MANAGEMENT STRUCTURE

2.1 Holding Company

Company name:

2.2 Subsidiaries

5J:EIFFAGE

EIFFAGE

163, quai du Docteur Dervaux 92601 Asnieres-sur-Seine Cedex France

Tel: 0033 1 41 328000 www.eiffage.fr

5Jf/ffAGf

CONSTRUCTION

5JElffAGf

TRAVAUX PUBLIC

5JFORCLUM

5JEIFfAGf

Concessions

~EIFFEL

EIFFEL (UK) LTD

GOYER

MUNCH

SOMDEL INGENIERIE

SEH

SSC

STRUCTURAL STEELWORK ,I GLAZI G IHTRODUCTlmJ

('

5lf/fFEL

2.3 Subsidiaires in France

MUNCH

Manager: Etienne ROYER 135, Rue de Nancy

B.P 18

54390 FROUARD FRANCE

Tel: 03 83 49 48 48 Fax: 03 83 24 37 29

e-mail: contact-maizieres@eiffel.eiffageJr

GOYER

Director: Daniel GOYER 13 Rue Henri Goyer

41120 Fougeres-sur-Bievre FRANCE

Tel: +332 54 5665 65 Fax: +33254 566505 e-mail: THON@goyerJr

Lille Agency

35, rue Jean Mermoz 59175 TEMPLEMARS Tel: +33 (0)3 20 96 28 50 Fax: +33 (0)3 20 95 13 03

EIFFEL Lauterbourg B.P.B

1, Route de Mothern 67630 LAUTERBOURG Tel: +33(0)388946820 Fax: +33 (0)3 88546622

EIFFEL

48-50, rue de Seine 92707 COLOMBES cedex Tel: +33(0)1 47604700 Fax: +33(0)1 47604701 www.eiffel.fr

SOMDEL INGENIERIE Manager: Arnaud de VllLEPIN 80 bis, rue Jean Jaures

Crespin

59920 QUIEVRECHAIN FRANCE Tel:0327141516 Fax: 03 27 14 15 15

e-mail: contact-somdel@somdeIJr

lie-de France Agency Z.A des Hautes Bruyeres 25, rue Auguste Perret 94800 VILLEJUIF FRANCE

Tel: +33 (0)1 45 59 29 29 Fax: +33 (0)1 45 59 29 00

Orleans Agency

21 rue Lavoisier - Z.I d'ingre 45140 ST JEAN DE LA RUELLE Tel: +33(0)2 38 72 45 72

Fax: +33 {0)2 38 72 45 73

EIFFEL Maizieres B.P 80120

Voie Romaine

57281 MAIZIERES-LES-METZ Tel: +33 (0)3 87 51 41 00

Fax: +33 (0)3 87 5741 02

EIFFEL Fos-sur-Mer

Carefour du Caban - R.N 268 A Route du Port Saint Louis - B.P 10 13771 FOS-SUR MER cedex

Tel: +33(0)4420211 00

Fax: +33(0)4420539 78

STRUCTURAL STEELWORK / GLAZiNG it'iTRODUCTlO~~

(<-

5JEIFFEL

Normandie Agency

Rue des Chantiers - Pont IV 76600 LE HAVRE

Tel: +33(0)2 35246230 Fax: +33(0)2 35 24 34 00

2.4 Subsidiaries abroad

EIFFEL UK LTD

Manager: Glenn MAWDESLEY Studio 20

Power Road Studios 114 B Power Road Chiswick

London W4 5PY

UK

Tel.:. 00 44208747 5990 Fax.: 00 442087475991

e-mail: ecm@eiffeI uk.daemon.co.uk

SiBC (Stahlbau Consult GmbH) Manager: Thomas HARNICH MiUelstrasse 25

39114 MAGOEBOURG GERMANY

Tel: 00391 501932 Fax: 00 391 50 1993

e-mail: info@sbc-magdeburg.de

POLAND Defor

63-131, Chrzastowo 55 Srem

Poznan

Tel: (+48)6128221155 Fax:. (+48)612832203

Cote d'Opale Agency Route de l'Eciuse Wattier 59140 OUNKERQUE Tel: +33(0)3282.1 8359 Fax: +33(0)3 28 21 93 13

EIFFEL - NIGERIA L TO

Port Harcourt Office Plot 3/4

Trans Amadi Industrial Layout PORT HARCOURT

RIVER STATE

NIGERIA

Tel.: 002348421 650260786

SEH(Stahlbau Engineering Hannover) Manager: Hans Wilhem GESSNER Entenfangweg 2, Postfash 21 0448w 30404 HANNOVER

GERMANY

Tel: 0049 5 11 2 79 790

Fax: 00 49 5 11 279 7979 e-mail: info@seh-hannover.de

SPAIN

EIFFEL Iberica

Pol. Ind. Los Villajeros 02230 madrigueras Albacete

Tel: +(34)967 484 380 Fax: +(34)967 484561

STRUCTUR/\L STEElViORK ! GLAZING a,ITRODUCTION

HEAL TH & SAFETY PLAN Form No: EUK-H&S- RevOl
5JEIFfEL Originated By: EUK
Issue Date; 01111/08
Studio 2D. Power Road Studios Review Date; 0111 1/09 FRANCE

::::l o o

c.::

I-

Z

o z

- -

o (U

OJ ..~ 0 o OJ .... a.

1l.00

....

~

z o

U

::::l o o e::

z

o z

5lEIFFEL

2 .. 6 Key Personnel

EIFFEL UK Management Team:

1. Glenn Mawdesley - Company Director

2. John Scott - Quality, Health & Safety Representative (UK)

3. David Michel - Procurement Manager

4. Emmanuel Deline - Project Manager

5. David Mercer - Project Manager

6. Alex Jouille - Project Manager

7. Van Rami - Deputy Project Manager

8. Phil Downing - Construction Manager

9. Tony Brown- Construction Manager

10. Paul Constantinou - Construction Manager 11 . John Lucking - Project Designer

12. Rhiannon Alabaf - Document Control

13. Sam Joseph - QS

Personnel based in Colombes:

t.Loic Penel - Head of Special Structures Department 2. Jean-Claude Beguin - Senior Project Manager 3.Hubert Jamouille - Senior Project Manager 4.Christian Jourden - Project Manager

5. Patrick Philippon - Project Designer

6. Pierre Dziuba - Project Designer

7. Valerie Bouiface - Head of Design

Personnel based in Maizleres-les-Metz:

1. Thierry Crosnier- Malzieres-les-Metz Division Director

2. Bruno Bertoncini - Fabrication Manager

3. Xavier Voirgard - Project Manager

4. Mathieu Butsch - Welding Engineer

EIFFEL Group Representatives:

1. Eric Weippert - Health and Safety Group Manager

2. Jean-Marc Guigon - Quality Manager

STRUCTURAL STEELWORK / GLAZING II'ITRODUCTlO~~

5JEIFFEL

3. TECHNICAL CAPACITY

3.1 Human resources per category

Category Number of employees
2004 2005 2006
Management 183 233 245
Administrative 55 58 58
Engineering 148 261 261
Commercial 14 16 16
Technical 47 55 55
Craftsmen - Steel Fixer 40 53 55
Craftsmen - Welder 50 55 60
Craftsmen - Steel Worker 60 66 67
Craftsmen - Machine Operator 25 28 30
Craftsmen - Others 45 54 55
Operatives 19 166 168
Other Categories 20 24 26
Total Eiffel Grouip 706 1069 1096 3.2 Plant and Equipment

3.2.1 Maizieres les-Metz

Specialising in bespoke steel fabrication, this factory provides the majority of the group facade related steel structures as well as the more specialised pedestrian bridge structures.

The team at Maizieres offer the highest quality and work to the tightest tolerances.

In the UK, Maizisres has provided the steelwork for all the projects completed to date. Maizieres plant description attached.

3 .. 2.2 Lauterbourg

Specialising in heavy engineering steel fabrication, this factory provides the majority of the group large steel structures including most of the group bridge structures.

The team at Lauterbourg recently completed the world record breaking 'Millau Viaduct', providing over 2.4km of bridge deck weighing in excess of 36,000 tonne. This feat made all the more impressive when it was completed at a height of over 270 metres above the Tarn Valley.

Lauterbourg plant description attached.

STRUCTURl\L STEEL WDR:< I' GLAZI NG IHTRODUC nor-

:a1EIFFEL

5. FINANCIAL STANDING

5.1 Financial Statements

Balance Sheets and Statement of Income Attached

5.2 Turnovers

Turnover in 2003

Turnover in 2004

Turnover

201 million euros

Construction: 13%

Turnover in 2005 186 rnlllion euros



-

:.

Civil engineering structures:

I8%

Industry:

Millau :

Turnover in 2006

30% Facades

20% Special Structures 16% Mechanical Engineerin{ 14% Infrastructure

14% Offshore

6% BaUer making

STRUCTUR,\L STEELWORK I GLAW G IHTRODUCTIO~~

5JEIFFEL

• -. ~Id:"-(' -; .-.

6. HEALTH & SAFETY

6.1 Health and Safety - Policy and Procedure

Eiffel regards the provision of trained and experienced manager, supervisors, foremen and labour as the key to operations being carried our safety and without risk to Health and Safety. Safety training is ongoing.

Eiffel will conduct health and safety induction / orientation training or ensure that such training is provided for all personnel working upon site. Site safety rules will be issued at time of induction and records retained.

All supervisors, foremen and operatives are trained to CITB Standards as a minimum before commencing work on site, and re-tested if necessary during site activities.

An agenda of site induction / orientation training is attached outlining the training given to anyone prior working on site. This covers details of Eiffel's safety policy, first aid provision, procedures for dealing with emergencies and procedures for reporting and investigating accidents and emergencies.

Included is a copy of the employees site safety rules which all employees must adhere to as well as copy of Sub-Contract site safety Rules.

The Eiffel HSE site representative is responsible for monitoring and ensuring the HS policy is adhered to by all employees and Sub-Contractors.

Safety Policy and Plan attached

Guide to Health, Safety Environment

Mr Peter Smith, our Independent Safety Advisor from Nationwide Training Services conducts projects safety inspections every month.

CVattached

6.2 Health and Safety - Qualifications & Management Training

All managers and supervisors are attending training provided by Nationwide Training Services.

NTS certificates attached

STRUCTURAL STEELWORK.I GlAZIHG n'iTRODUCTiON

~EIFFEL

7. QUALITY

7.1 Quality Control - Management System and Procedures

Each division within the Eiffel Group has full responsibility and authority for managing its own product lines under an established Quality Management System.

The quality system of the special structures division has been developed in accordance with ISO 9001-EN 29001 (1998-12) and this is fully approved and accredited by AFAQ (French Association for Quality Assurance).

Certificates attached

The quality assurance manual for the structural and special structures divisions together with general procedures and work instructions, forms the basis of the quality management system for execution, control and certification of all work executed by the division.

Prior to the commencement of each project, a project quality management plan will be developed to meet the specific requirements of the projects.

The basis of this project quality management plan will follow the management requirements established in the quality assurance manual and will also incorporate project specific procedures, work instructions, specifications, certification requirements and client requirements relevant to the project.

Throughout the project duration, a programme of auditing and management is implemented to ensure that there is full compliance by all parties.

We enclose hereafter an extract of our standard project quality plan which would form the basis of any project specific plan.

Standard Quality Plan attached

STRUCTUR,l1.L SrEELViORK / GLAZinG II'IWODUCTIO~~

You might also like