The document provides instructions for safely installing a soil boring machine on a building bridge. It recommends placing the 6-ton drill rig machine between a structural wall and two columns on a slab that can support the weight. It identifies the green area as safe for the drill rig placement and the red area as dangerous due to slab support. The first step is to drill a 50 cm hole in the slab no further than 1 meter from the beam to pass hollow stem augers. Care needs to be taken against vibrations causing landslides during operation.
The document provides instructions for safely installing a soil boring machine on a building bridge. It recommends placing the 6-ton drill rig machine between a structural wall and two columns on a slab that can support the weight. It identifies the green area as safe for the drill rig placement and the red area as dangerous due to slab support. The first step is to drill a 50 cm hole in the slab no further than 1 meter from the beam to pass hollow stem augers. Care needs to be taken against vibrations causing landslides during operation.
The document provides instructions for safely installing a soil boring machine on a building bridge. It recommends placing the 6-ton drill rig machine between a structural wall and two columns on a slab that can support the weight. It identifies the green area as safe for the drill rig placement and the red area as dangerous due to slab support. The first step is to drill a 50 cm hole in the slab no further than 1 meter from the beam to pass hollow stem augers. Care needs to be taken against vibrations causing landslides during operation.
THE FOLLOWING INSTRUCTIONS SHOULD BE FOLLOW FOR MONITORING
WELL / SOIL BORING INSTALATION ON BUILDING 32 BRIDGE CONNECTING. THIS REPORT WILL PRESENT INFORMATION FOR A SAFE PLACEMENT OF SOIL BORING MACHINE.
Imagine the result A STRATEGY FOR THE LOCATION OF THE MACHINE, IT IS USING THE BEAMS AND COLUMNS OF STRUCTURE TO SUPPORT AND DISTRIBUTE THE WEIGHT SAFELY.
THE SLAB WHERE A DRILL RIG MACHINE WILL BE SUPPORTED IS BETWEEN A STRUCTURAL WALL AND TWO COLUMNS.
LIVE LOADS: FORD TRUCK MOD.1762 - 8 T DRILL RIG MOD. MAC 16 HOLLOW 6 T Imagine the result THE GREEN AREA REPRESENTS WHERE THE DRILL RIG CAN BE PLACED .
PLACE THE DRILL RIG IN THE RED COULD BE DANGEROUS BECAUSE THIS SLAB IS SUPPORTED FOR ONE BEAM AS SHOWN IN THE PHOTO. Imagine the result THE FIRST STEP IS TO MAKE A 50 CM HOLE IN THE SLAB USING A MAKITA HAMMER TO PASS THE HOLLOW STEM AUGERS AS SHOWN IN THE PICTURE.
THE DISTANCE BETWEEN BEAM AND HOLE SHALL NOT PASS FROM 1M.
WE HAVE TO BE CAREFUL WITH MACHINE VIBRATION THAT COULD CAUSE LITLE LANDSLIDES.