To,

Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
Pile Work 56 20 40 40
Excavation 7
Beam 6
Pile Cap/Pad 3
Pedestals
Backfilling
S.SS. Errection
Equip. Erection
Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
Pile Work 56
Excavation 7
Pile Cap/Beam 5
Pedestals
Backfilling
6 7
8 9 10 11 12 13 14
Post Insulator (72 Nos)
Low Level Gantry (10 Nos.)
(20m)
Surge Arrestor (18 Nos.)
Fire Wall (7 Nos.)
500 kV Switch Yard
1 2 3 4 5
NEIE
Al-Husain Traders & Contractors
Dated: 01/03/2014
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE
EXISTING 220 KV SHIKARPUR SUBSTATION TO 500 KV LEVEL.
Daily Progress Report
Switch Yard Path Culverts (21
Nos.)
Contractor: NEIE
Auto Transformer (7 Nos.)
Line Gantry (5 Nos.)
(20+10.75+9.25m)
ATB Gantry (5 Nos.)
(20+10.75+9.25m)
Disconnector (24 Sets) Circuit Breaker (9 Sets)
High Level Gantry (10 Nos.)
(30.75+9.25m)
Activities
C.V.T (22 Nos)
Activities
Switch Yard Path (1208 m) Current Trasnsformer (27 Nos)
S.SS. Errection
Equip. Erection
Today This Month To Date Today This Month To Date Today This Month To Date Today This Month To Date
Excavation
Lean Concrete
Steel Work
Form Work
Conrete Work
Bitumen Coating
Backfilling
Today Activities Perfomed:
1- Bitumen Coating and Back Filling of Fire wall(pile cap) And Auto Transformer (walls) are in Progress.
3- Placement of M.s Rails and Levelling is in Progress
15
TYPE-ii (450 m)
Activities
TYPE-iii (620 m)
Trenches (m)
TYPE-i (140 m)
2- Form Work of ATF-3 Walls is in Progress
4- Surface Preparation for Firewall-6 Bed is in Progress
5- Surface preparation for lean concrete is in progress.
TYPE-iv (510 m)
To,
NEIE
Contractor: NEIE
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE EXISTING 220 KV SHIKARPUR SUBSTATION TO
500 KV LEVEL.
5 6 7
Current Transformer (18 Nos.)
3 4
Post Insulator (26 Nos.)
1 2
Al-Husain Traders & Contractors
Daily Progress Report
Activities
Surge Arrestor (12 Nos.)
High Level (4 Nos.)
(13+5.5+4m)
High Level (8 Nos.)
(18.5+4m)
Low Level (12 Nos.)
(13+4m)
C.V.T Line (12 Nos.)
Dated: 01/03/2014
Contractor: NEIE
220 kV Switch Yard
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
Pile Work 32 48 16 6 6 4
Excavation 2 2 1 1
Pile Cap/Beam
Pedestals
Backfilling
S.SS. Errection
Today
Activities
(13+5.5+4m) (18.5+4m) (13+4m)
S.SS. Errection
Equip. Erection
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Activity Today
This
Month
To Date Today
This
Month
To Date Activity Today This Month To Date
Pile Work 12 3 3 6 Sub Base 146.7 88.65
Brick
Work/Stone
Masonry
Bitumen Road (250 m) Fencing (335m)
13
Circuit Breaker (6 Sets) Path Way (257 m)
Activities
12 8 9 10 11
Disconnector (16 sets) Transformer Way(111 m)
Excavation Base 146.7 Copping
Pile Cap/Beam Carpet Fence Work
Pedestals
Backfilling
S.SS. Errection
Equip. Erection
16 15 14 17
Trenches (m)
Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date Today
This
Month
To Date
Excavation 100% Excavation 100%
Lean Concrete 100% Lean Concrete 118.7
Steel Work 100% Steel Work
Form Work 100% Form Work
Activities
Transformer Way Culvert
(01 No.)
TYPE-iii (260 m)
Activities
TYPE-i (126 m) TYPE-iv (257 m)
Transformer Moving Area (118.7 M)
Trenches (m)
Path Way Culverts (7 Nos)
Form Work 100% Form Work
Conrete Work 100% Conrete Work
Bitumen Coating 100%
Backfilling
3- Lean Concrete of Moving Area is Completed.
Today Activities Perfomed:
2- Back Filling of Bitumen Road shoulders is completed
1- Laying of base material of Bitumen Road is completed
4- Pile Work of 220Kv Equipment Piles is in Progress
3- Lean Concrete of Moving Area is Completed.
7- Steel Cutting and Bending of 11kV Feeder Trench is in Progress
8- Excavation for Pile Caps & Beams of 220kv Gantries is in Progress
5- Compaction of Bitumen Road is in Progress
6- Lean Concrete of 11kV Feeder Trench is completed
NEIE
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE EXISTING 220 KV
To,
Dated:01/03/2014
Daily Progress Report
Control House Building
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF PLANT FOR UPGRADATION OF THE EXISTING 220 KV
SHIKARPUR SUBSTATION TO 500 KV LEVEL
Contractor: NEIE
AL-HUSSAIN TRADERS
Sr. No. Status
1 Completed
2 Completed
3 In Progress Steel Work of Pile Caps, Foundation Beams, Columns Up to Plinth Level
Excavation Work for Foundation Beams And Pile Caps
Descripition of Activities
Pile Work
3 In Progress
4 In Progress
5 In Progress
6 In Progress
Concrete Work of Pile Caps and Foundation Beams
Form Work of Pile Caps and Foundation Beams
Concrete Work of Columns upto Plinth Level
Steel Work of Pile Caps, Foundation Beams, Columns Up to Plinth Level
7 In Progress
8
Today Activities Performed
1- Steel Work of Foundation Beams Axis (5-8) is in progress
Form Work of Columns upto Plinth Level
1- Steel Work of Foundation Beams Axis (5-8) is in progress
2- Form Work of Foundation Beams Axis (5-8) is in progress.
3- Form Work of Columns upto Plinth Level is in Progress
4- Conrete Work of Columns Upto Plinth Level (1C,1D) is completed
6- Concrete Work of Pile Caps and Foundation Beams Axis (1~5- A~D) is completed
7- Opening & Shifting of Form work is in progress.
8- Bitumen Coating on Foundation Beams is in Progress
5- Steel Fixing of Stair Case Foundation is Completed
9- Bar Bending Schedule of Stair Case Submitted on 09-02-2014
10- Bar Bending Schedule of Columns ( Plinth Level upto 1st Floor ) Submitted on 09-02-2014
11- Bar Bending Schedule of 1st Floor Beams Submitted on 21-02-2014
8- Bitumen Coating on Foundation Beams is in Progress