BI WEEKLY REPORT

ENGR 596

Will be working on three assignments
1) CWP Model Pump Assembly under Mark Vernon
Modelled a stand part in Creo 2 for Circulating Water Pump which will be used in the test lab
while testing the pump.

Working on the creation of drawing for next week.

2) Value Engineering Fabrications under Tim Dach
Organized the fabrication reference list and categorized different Barrels, Supports and
Discharge Heads.
Working on centralizing and organizing the Proe files and drawings related to the spread sheet.
3) Learn Pumps under Paul Behnke
Gaining knowledge of vertical pumps. Read about Standard Pump specifications and Construction
Features, Mechanical Design of the pump and Application Engineering.