3.0 Task 3: Building Drawing
List of instruments and materials
1. Engineering Drawing equipment.
2. A3 size paper.
Instructions
1. Project task must be done by the candidate individually.
2. Study carefully the given drawings before starting the task.
3. All dimensions are in millimetre.
4. Project tasks of the candidates must be kept by the subject teacher for assessment and safety purposes.
Assessment
For assessment, emphasis is given to the following aspects:
1. Correct method.
2. Using the correct standard symbols.
3. Accuracy.
4. Draughtsmanship.
TERHAD 3759/2 [Lihat halaman sebelah 3759/2 2014 Hak Cipta Kerajaan Malaysia TERHAD 5
3.0 Tugasan 3: Lukisan Bangunan
Senarai alat dan bahan
1. Peralatan Lukisan Kejuruteraan.
2. Kertas bersaiz A3.
Arahan
1. Tugasan projek mestilah dilakukan oleh calon secara individu. 2. Kaji lukisan-lukisan yang diberi dengan teliti sebelum memulakan kerja. 3. Semua dimensi pada lukisan adalah dalam milimeter. 4. Semua tugasan projek calon mestilah disimpan oleh guru mata pelajaran untuk tujuan penilaian dan keselamatan.
Pentaksiran
Bagi tujuan pentaksiran, penekanan akan diberikan kepada perkara berikut:
1. Kaedah yang betul.
2. Penggunaan simbol piawai yang betul.
3. Kejituan.
4. Kejurupelanan.
TERHAD 3759/2 [Lihat halaman sebelah 3759/2 2014 Hak Cipta Kerajaan Malaysia TERHAD 6
(a) Do the following in page 8:
(i) Figure 1 shows incomplete view of the gable roof. Complete the top view and side view by drawing the roof line.
(ii) Figure 2 shows incomplete view of the Dutch hip roof. Complete the top view and side view by drawing the roof line.
(iii) Figure 3 shows floor plan of a kitchen and bathroom. Draw the standard architecture symbols based on Table A.
(b) Figure 4 shows an isometric view of a single storey bungalow.
Figure 5 shows incomplete views of the floor plan, the front view and the left side view.
Do the following in Figure 5:
(i) Complete the floor plan by drawing the roof line.
(ii) Complete the front view.
(iii) Complete the left side view.
Complete all views with the standard architecture symbols based on Table B.
LOCATION DETAILS P1 Sliding door 3 panels P2 Hinge door T1 Hinge window 3 panels T2 Sliding window 2 panel T3 Adjustable glass louvers T4 Fixed glass louvers T5 Hinge window 2 panels T6 Hinge window 4 panels
Table B TERHAD 3759/2 [Lihat halaman sebelah 3759/2 2014 Hak Cipta Kerajaan Malaysia TERHAD 7
(a) Lakukan yang berikut pada muka surat 8:
(i) Rajah 1 menunjukkan bumbung tebeng layar yang tidak lengkap. Lengkapkan pandangan atas dan pandangan sisi dengan melukis garisan bumbung.
(ii) Rajah 2 menunjukkan bumbung limas belanda yang tidak lengkap. Lengkapkan pandangan atas dan pandangan sisi dengan melukis garisan bumbung.
(iii) Rajah 3 menunjukkan pelan lantai dapur dan bilik air. Lukis symbol piawai senibina berdasarkan Jadual A.
(b) Rajah 4 menunjukkan pandangan isometri sebuah banglo setingkat.
Rajah 5 menunjukkan pelan lantai, pandangan hadapan dan pandangan sisi kiri yang tidak lengkap.
Lakukan yang berikut pada Rajah 5:
(i) Lengkapkan pelan lantai dengan melukiskan garisan bumbung.
(ii) Lengkapkan pandangan hadapan.
(iii) Lengkapkan pandangan sisi kiri.
Lengkapkan semua pandangan itu dengan simbol piawai senibina berdasarkan Jadual B.
1. Project task must be done by the candidate individually. 2. Study carefully the given drawings before starting the task. 3. Project tasks of the candidates must be kept by the subject teacher for assessment and safety purposes.
Assessment
For assessment, emphasis is given to the following aspects:
1. Correct method.
2. Using the correct standard symbols.
3. Follow the piping law.
4. Draughtsmanship.
TERHAD 3759/2 [Lihat halaman sebelah 3759/2 2014 Hak Cipta Kerajaan Malaysia TERHAD 12
1. Tugasan mestilah dilakukan oleh calon secara individu. 2. Kaji lukisan-lukisan yang diberi dengan teliti sebelum memulakan kerja. 3. Tugasan calon mestilah disimpan oleh guru mata pelajaran untuk tujuan penilaian dan keselamatan.
Pentaksiran
Bagi tujuan pentaksiran, penekanan akan diberikan kepada perkara berikut:
1. Kaedah yang betul.
2. Penggunaan simbol piawai yang betul.
3. Mematuhi undang-undang kecil perpaipan.
4. Kejurupelanan.
TERHAD 3759/2 [Lihat halaman sebelah 3759/2 2014 Hak Cipta Kerajaan Malaysia TERHAD 13
(a) Complete Table A on page 15 by drawing the piping standard symbols of sanitary fitting.
(b) Figure 6 shows an isometric piping view of a bungalow.
Figure 7 shows floor plan of the bungalow that had been completed with sanitary equipment symbols.
Draw an orthographic piping drawing in Figure 7 based on Figure 6 showing joints of piping flow.
TERHAD 3759/2 [Lihat halaman sebelah 3759/2 2014 Hak Cipta Kerajaan Malaysia TERHAD 14
(a) Lengkapkan Jadual A pada muka surat 15 dengan melukis simbol piawai perpaipan bagi alat lekapan.
(b) Rajah 6 menunjukkan lukisan perpaipan isometri bagi sebuah banglo.
Rajah 7 menunjukkan pelan lantai itu yang telah dilengkapkan dengan simbol alat kelengkapan sanitari.
Lukiskan lukisan perpaipan ortografik pada Rajah 7 berdasarkan Rajah 6 dengan menunjukkan semua simbol penyambungan aliran.
TERHAD 3759/2 [Lihat halaman sebelah 3759/2 2014 Hak Cipta Kerajaan Malaysia TERHAD 15
Draw the piping standard symbols of the sanitary fitting. Lukiskan simbol piawai perpaipan bagi lekapan berikut. No. Bil. Elements Elemen Standard symbols Simbol piawai 1. Elbow joint (top view) Siku/Liku (pandangan atas)