CALCULO DE ARMADURA DE RESERVORIO

DATOS
PROYECTO :AGUA PACHAMARCA

ACERO MUROS
ACERO VERTICAL
= 3/8
DIAMETRO
= 0.953
AREA
= 0.713
PESO
= 0.560
ACERO HORIZONTAL = 3/8
DIAMETRO
= 0.953
AREA
= 0.713
PESO
= 0.560

EXPEDIENTE :
ZONAL
:
EVALUADOR :CARLOS L
FECHA
: 2-Jul-14

CARACTERISTICAS GEOMETRICAS
VOLUMEN RESERVORIO

30.00

m3

ALTURA UTIL RESERVORIO =


1.95
LADO UTIL RESERVORIO
=
3.95
ESPECIFICACIONES

mts.
mts.

CONCRETO f'c
SOBRECARGA EN LOSA
ACERO fy
RESISTENCIA DEL SUELO

=
=
=
=

210
150
4,200
2.00

COEF. SISMICO
RECUBRIMIENTO r =
fs
fc

=
=
=
=

0.12
4.00 Cm
2,100 Kg/cm2
94.5 Kg/cm2

ACERO LOSA DE TECHO


ACERO HORIZONTAL = 3/8
DIAMETRO
= 0.953
AREA
= 0.713
PESO
= 0.560
ACERO LOSA DE FONDO
ACERO HORIZONTAL = 3/8
DIAMETRO
= 0.953
AREA
= 0.713
PESO
= 0.560

Kg/cm2
Kg/m2
Kg/cm2
Kg/cm2

0.20

0.20

Pulg.
Cms.
Cms2.
Kg/ml
Pulg.
Cms.
Cms2.
Kg/ml

Pulg.
Cms.
Cms2.
Kg/ml
Pulg.
Cms.
Cms2.
Kg/ml

1.98

2.38
2.38

Sc
SL
A'

Wc
0.10

B'
0.30
WL

NIVEL DE AGUA

S1
1.95
Ea
2.65

2.60

W1

0.7

1.43

Wa
A

B
S2

0.30

0.15
C

W2
0.30
1.19
1.39

CALCULOS
W1= Pc x V1
W2 = Pc x V2

1080.00 Kg
1713.60 Kg

Wa = Pa x Va
WL = Pc x VL

3861.00
523.20
327.00
194.40

Ws = Sc x A
S1 = 0,12 x W1
S2 = 0,12 x W2
SL = 0,12 x WL
Ss = 0,12 x Ws

Kg
Kg
Kg
Kg

308.45 Kg
94.18 Kg
70.63 Kg

3194.10 Kg

Ea = 1,12 x 0,5 x Pa x H12

VERIFICACION DEL ESFUERZO CORTANTE EN LA BASE AB


V = Fh / A

1.78 Kg/cm2

Vc = 0,29 ( f'c )^1/2

4.20 Kg/cm2
V=

1.78

Kg/cm2

<

Vc =

4.20

Kg/cm2BIEN !!

CALCULO DE LA ARMADURA
ACERO VERTICAL CARA B'-B
MOMENTO MAXIMO EN LA BASE A-B
Mu
d = t1 - r - D/2

2677.46 Kg-mts.
15.52 Cms.

AREA DE ACERO
As1 =
127.22 Cms2
As2 =
4.73 Cms2

SE ASUME :

0.0024

CUANTIA = As / t1 x b
CUANTIA MINIMA POR FLEXION 0.0012
USAR :

4.73 Cms2

3/8

<

0.0024

BIEN!!

0.15 mts.

ACERO HORIZONTAL B'B


ASUMIR CUANTIA MINIMA PARA EL ACERO HORIZONTAL, CONSIDERANDO P = 0,0018
As = P x b x t1
USAR :

3.60 Cms2

3/8

0.20 mts.

ACERO EN LA ZAPATA
ASUMIR EL AREA DE ACERO HALLADA PARA LA BASE DE MURO
USAR :

3/8

0.15 mts.

ACERO EN LA LOSA DE FONDO


P1
P2
P3
P4
P5
LUEGO:

6843.456
14126.4
12830.40
24470.21
45868.68
WuD :
WuL :

5478.24
270.00
Wu :

5748.24

CALCULO DEL MOMENTO ULTIMO


Mu = 0,0513 * Wu * L2
d = t1 - r - D/2

5605.64 Kg--mts
25.52 Cms.

AREA DE ACERO
As1 =
210.97 Cms2
As2 =
5.97 Cms2

SE ASUME :

0.002

CUANTIA = As / t1 x b
CUANTIA MINIMA POR FLEXION 0.0012
USAR :

5.97 Cms2

3/8

<

0.0020

BIEN!!

0.12 mts.

ACERO EN LA LOSA DE TECHO


WuD = 2400 * t1 * 1,5
WuL = SC * 1,8

360
270
630

Wu =
CALCULO DEL MOMENTO ULTIMO
Mu = 0,0479 * Wu * L2
d = t1 - r - D/2
AREA DE ACERO
As1 =
46.32 Cms2
As2 =
2.30 Cms2

473.22 Kg--mts
5.72 Cms.

SE ASUME :

2.30 Cms2

0.0023

CUANTIA = As / t1 x b

CUANTIA MINIMA POR FLEXION 0.0012

<

0.0023 BIEN!!
Cms2

USAR :

3/8

0.20 mts

4.75
0.15

0.20

0.30

0.15

TUB. FG 3/4"
@ 0,30 Mts.

0.20

2.2

UNIONES
ELECTROSOLDADAS

0.15

3.95

ESCALINES FG
VER DETALLE

DETALLE DE ESCALINES

BUZON 0,60 x 0,60 Mts.


TAPA SANITARIA METALICA

ESPECIFICACIONES TECNICAS
0.20

0.20

0.20

0.20

3.95

0.20

RESISTENCIA DEL CONCRETO

f'c

175

Kg/cm2

FLUENCIA DEL ACERO

fy

4200

Kg/cm2

30

TRASLAPE MINIMO DE VARILLAS

cm

0.20

FONCODES
RESERVORIO APOYADO

30 M3

PLANTA
C. LOAYZA P.

Jul-14

TAPA SANITARIA METALICA


0,60 x 0,60 mts.

3/8

TUBERIA DE VENTILACION FG 2"

0.20

0.10

0.30
NIVEL DE AGUA

3/8

0.15

3/8

0.20

2.25

TARRAJEO C / IMPERMEABILIZANTE

1.95

3/8

0.15

3/8

3/8

0.12

PENDIENTE DE FONDO 1%

0.15

0.30

0.075

1.32

0.20

0.20

SOLADO DE CONCRETO

3.95

0.20

0.20

FONCODES
RESERVORIO APOYADO 30 M3
CORTE A-A
C. LOAYZA P.

Jul-14

3/8

0.20

3/8

4.35

ESPECIFICACIONES TECNICAS
RESISTENCIA DEL CONCRETO

f'c

175

Kg/cm2

FLUENCIA DEL ACERO

fy

4200

Kg/cm2

30

TRASLAPE MINIMO DE VARILLAS

4.35

cm

FONCODES
RESERVORIO APOYADO

30 M3

ARMADURA DE LOSA DE TECHO


C. LOAYZA P.

Jul-14

PLANILLA DE ARMADURA RESERVORIO

ARMADURA LOSA DE TECHO

30 M3

LONGITUD

VECES

PESO

3/8

4.43

45.5

112.88

3/8

4.29

9.61

LONGITUD

VECES

PESO

3/8

1.99

129.83

144.44

3/8

4.69

38.88

102.11

LONGITUD

VECES

PESO

3/8

2.83

119.23

188.96

3/8

8.8

24.50

120.74

4.29
0.07

4.29

ARMADURA LOSA DE FONDO


1.72
0.27

4.69

ARMADURA DE MURO
0.16

2.51

0.15

4.15

2.18

PESO TOTAL EN Kg

678.73

HOJA DE METRADOS DE RESERVORIO


CAPACIDAD :
PROYEC.:
EXPED.:
PARTIDA

6.00
6.01
6.02
6.03
6.04

6.05
6.06

6.07
6.08

6.09
6.10
6.11
6.12
6.13
6.14
6.15

AGUA PACHAMARCA
0

30

EVALUADOR:
FECHA:

DESCRIPCION

VECES

RESERVORIO
TRAZO Y REPLANTEO
EXCAVACION MANUAL
SOLADO DE CONCRETO E= 0.05 Mts.
CONCRETO F'C= 175 KG/CM2

30.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
CONFOR. DE PENDIENTE DE FONDO C F'C= 175 KG/CM21.00
ENCOFRADO Y DESENCOFRADO
4.00
4.00
1.00
ACERO FY= 4,200 KG/CM2
1.00
ESCALINES DE FIERRO GALVANIZADO
2.00
6.00
TARRAJEO INTERIOR CON IMPERMEABILIZANTE
TARRAJEO EXTERIOR MEZCLA 1:5
TAPA SANITARIA METALICA 0,60 x 0,60 Mts.
TUBERIA DE VENTILACION FG D= 2"
PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO
SUMINISTRO Y COLOCACION DE HIPOCLORADOR
PINTADO DE MUROS EXTERIORES

LONG.

ANCHO

ALTURA

M3

CARLOS L
7/2/2014
SUB-TOTAL

TOTAL

UNID.

M3
4.75
4.75
4.75
4.75
4.35
3.95
4.35
3.95
4.35
3.95
3.95
678.73
2.80
0.30

4.00
1.00
4.00
1.00
1.00
1.00
1.00
1.00
4.00
1.00

3.95
3.95
4.35
4.35

4.35
4.35

4.75
4.75
4.75
4.75
0.20
0.20
4.35
3.95

0.80
0.30
2.25
2.25
0.10
2.35
2.25

3.95

2.25
3.95
2.35
4.35

2.35
4.35

22.56
18.05
22.56
6.77
3.92
3.56
1.89
15.60
40.89
35.55
15.60
678.73
5.60
1.80
35.55
15.60
40.89
18.92
1.00
1.00
1.00
1.00
40.89
18.92

22.56
18.05
22.56
16.13

15.60
92.04

678.73
7.40

51.15
59.81
1.00
1.00
1.00
1.00
59.81

m2
m3
m2
m3
m3
m3
m3
m2
m2
m2
m2
kg
ml

m2
m2
m2
m2
unid
unid
glb
unid
m2

TIEMPO DE EJECUCION DE OBRA


PARTIDA

6.00
6.01
6.02
6.03
6.04
6.05
6.06
6.07
6.08
6.09
6.10
6.11
6.12
6.13
6.14
6.15

DESCRIPCION

UNID

RESERVORIO
30.00
TRAZO Y REPLANTEO
m2
EXCAVACION MANUAL
m3
SOLADO DE CONCRETO E= 0.05 Mts.
m3
CONCRETO F'C= 175 KG/CM2
m3
CONFOR. DE PENDIENTE DE FONDO C F'C= 175 KG/CM2
m2
ENCOFRADO Y DESENCOFRADO
m2
ACERO FY= 4,200 KG/CM2
kg
ESCALINES DE FIERRO GALVANIZADO
ml
TARRAJEO INTERIOR CON IMPERMEABILIZANTE
m2
TARRAJEO EXTERIOR MEZCLA 1:5
m2
TAPA SANITARIA METALICA 0,60 x 0,60 Mts.
und
TUBERIA DE VENTILACION FG D= 2"
und
PRUEBA HIDRAULICA Y DESINFEC. RESERVORIO
glb
SUMINISTRO Y COLOCACION DE HIPOCLORADOR
und
PINTADO DE MUROS EXTERIORES
m2

METRADO

RENDI.

PERSONAL

PERSONAL BASE

TIEMPO

M3

22.56
18.05
22.56
16.13
15.60
92.04
678.73
7.40
51.15
59.81
1.00
1.00
1.00
1.00
59.81

200.00
3.00
70.00
9.00
70.00
10.00
250.00
15.00
6.00
10.00
5.00
10.00
10.00
10.00
25.00

1.00
1.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
5.00
2.00
2.00
2.00
5.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00

TIEMPO APROX. EJECUCION RESERVORIO.

0.90
9.63
2.58
14.34
1.78
14.73
21.72
3.95
34.10
23.93
1.60
0.80
0.80
0.80
19.14

Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.
Hrs.

18.85 Dias

VOLUMEN

ALTURA

LADO INTER

3.00
4.00
5.00

1.25
1.25
1.25

1.55
1.80
2.00

6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
51.00
52.00
53.00
54.00
55.00
56.00
57.00
58.00
59.00
60.00

1.25
1.25
1.30
1.30
1.35
1.40
1.45
1.50
1.55
1.55
1.60
1.65
1.65
1.70
1.70
1.75
1.75
1.80
1.85
1.85
1.85
1.90
1.90
1.95
1.95
2.00
2.00
2.05
2.05
2.05
2.10
2.10
2.15
2.15
2.15
2.20
2.20
2.20
2.25
2.25
2.25
2.30
2.30
2.30
2.35
2.35
2.45
2.40
2.40
2.40
2.40
2.45
2.45
2.55
2.45

2.20
2.40
2.50
2.65
2.75
2.85
2.90
2.95
3.05
3.15
3.20
3.25
3.35
3.35
3.45
3.50
3.55
3.60
3.65
3.70
3.75
3.80
3.85
3.90
3.95
3.95
4.00
4.05
4.10
4.15
4.15
4.20
4.25
4.30
4.35
4.35
4.40
4.45
4.45
4.50
4.55
4.55
4.60
4.65
4.65
4.70
4.65
4.70
4.75
4.80
4.85
4.85
4.90
4.85
4.95

VOLUMEN ASUMIDO

30.00 M3
ALTURA

LADO

1.95

3.95