Date: 12

th
March 2014

Sr.
No.
Parameters Off site Roof top
1 Transmission Losses 4.19% NIL
2 Wheeling Lossess 6% NIL
3 Open Access Charges 1.67Rs/unit NIL
4 Maximum Demand NOT Protected Protected being a captive
generation
5 Effect of Grid Stability YES NO
6 Tariff for the
consumption if solar
generation fails
Temporary Tariff Normal Tariff
7 Energy Credit Note Delay from 3months to eight
months
Instant benefit in Electricity bill.
8 RPO Has an RPO obligation of 9%
being OA consumer
NO RPO
9 MNRE Subsidy NIL Can Avail 30% Subsidy for
100KW/Rooftop
10 Accelerated
Depreciation
NIL Can Avail AD benefit of 80% in
first year.
11 Generation Monitoring
& control
Remote Monitoring and NO
Control
Local Monitoring and Good
Control.
12 CAPEX NIL Approx INR 8Crs/MW
13 Payback NA 4years with AD benefits
6 years without AD benefits