Production Order could be split due to following reasons:


1. When partial lot of order is to be handled from the rest due to quality reasons.
2. If capacity bottle necks eists.
!. "aterial is committed for part of order qty.
#eatures:
1. $he split operations and the material assigned are copied into the child order.
2. $he structure of the parent order does not changes while the split off operations are copied into
the child order
%tatus for parent order : %P&$
%tatus for the child order: %P&'
#or operation : %P&$
(estrictions:
1. $he parent order and the child order must be settled to same cost collector
2. (ead PP "aster data is not possible
!. )onfirmations at header le*el is not possible
%teps to perform split:
1. In OP&+ %et the indicator cost collector
2. ,efault (ule -Periodic settlement.PP2/
!. )0111 do standard cost estimate
2. 00#31 )reate cost collector
4. )reate production order with op156256!5625
3. 7o to op o*er*iew
8. %elect the op from which you want to split .eop25/
+. 7o to functions ----9 %plit order
:. 'nter the qty 6if necessary a different order type for the child order
15. 'ecute
11. Order will be splitted .
12. $he order can be splitted e*en from op15 itself
1!. 7oto ",52
12. $wo orders will be created
14. 7o to op o*er*iew of each order and there you can see the splitting.