Master Planning
Master Planning
Ed
Special Education Department
Head
Leonard MS, FWISD
MASTER
PLANNING
Leonard is growing past capacity when looking at a projected enrollment
summary.
A new middle school will be built, the 6
th
grade Leonard center will be
absorbed into the current Leonard 7
th
and 8
th
middle school.
The current capacity is 7,569 students, with a current enrollment of 7,078.
LEONARD MIDDLE SCHOOL
There are multiple deficiencies that will be addressed by the grant.
Some of the deficiencies include:
Steel exterior door requires replacing
Overhead door is damaged and requires replacement
Fire and safety have 8 deficiencies
REQUIREMENTS
MASTER PLAN AERIAL SITE
MASTER PLANNING SITE PLAN
MASTER PLANNING ROOF PLAN
IMPORTANCE OF THE MASTER
PLAN