You are on page 1of 33

PIP si volum tranzactionat pentru ziua de livrare: 28/1/2013

Pret mediu Volum


[lei/MWh]
[MWh]
ROPEX_DAM_Base
226.56(1-24)
37427.8
ROPEX_DAM_Peak
260.73(7-22)
28728.67
ROPEX_DAM_Off_Peak
158.23 8699.131
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
198 968.071
134.73 977.999
117
947.18
106 951.161
129 986.713
180 1054.086
190 1386.79
249 1746.144
280 1814.831
296 1926.091
288 1915.963
278 1894.579
270 1855.33
265.85 1888.944
249 1856.556
236.84 1741.164
237 1738.304
270 1839.928
280 1808.77
278 1822.61
268 1813.442
236 1679.22
216.12 1513.021
185
1300.9

PIP si volum tranzactionat pentru ziua de livrare: 27/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
171.37(1-24)
29961.77
ROPEX_DAM_Peak
204.66(7-22)
20820.93
ROPEX_DAM_Off_Peak
104.81 9140.843
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
78 1285.342
69 1187.987
59 1108.975
57.45 1036.053
58 979.384
68 972.241
88 1067.859
96.34 1098.895
118.06 1175.83
185 1282.502
190 1296.88
190 1235.864
190 1199.332
190 1191.858
200
1243.6
215 1257.112
227 1359.974
271.12 1511.472
288 1490.16
288 1501.909
288 1481.426
250 1426.252
239 1395.378
210 1175.483

PIP si volum tranzactionat pentru ziua de livrare: 25/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
172.94(1-24)
40125.6
ROPEX_DAM_Peak
213.21(7-22)
29016.59
ROPEX_DAM_Off_Peak
92.4 11109.01
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
90 1213.598
90 1401.851
69 1294.553
69
1275.6
90 1289.463
95.61 1290.028
180 1365.786
220.09 1565.586
239.87 1836.387
269 1853.179
269 1873.446
249 1958.244
235 1948.555
225 1971.042
200 1941.748
180 1776.415
189 1820.738
198 1884.504
200 1857.282
198 1822.313
180 1751.568
179.45 1789.794
136.79 1676.392
98.76 1667.527

PIP si volum tranzactionat pentru ziua de livrare: 24/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
194.28(1-24)
38669.93
ROPEX_DAM_Peak
231.48(7-22)
28925.99
ROPEX_DAM_Off_Peak
119.87 9743.943
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
130.8 1255.965
106.04 1039.669
98.54 1012.698
106.08 999.703
119 1013.736
129 1096.497
179 1404.004
220.09 1681.392
258.71 1889.248
265.86 1857.304
260 1954.841
260 1877.24
253.42 1866.245
253.86 1811.561
237.17 1736.077
229 1667.21
213.59 1697.339
220 1831.592
239 2011.353
225 1954.285
200 1890.906
189 1795.391
150.99 1789.712
118.51 1535.963

PIP si volum tranzactionat pentru ziua de livrare: 23/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
203.75(1-24)
39507.39
ROPEX_DAM_Peak
233.03(7-22)
30347.37
ROPEX_DAM_Off_Peak
145.21 9160.015
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
120 1123.984
120.53 1000.341
124.11 950.366
129 901.049
152 929.597
178 1017.653
200.73 1346.469
219 1665.011
258.71 1796.203
265.86 1862.111
260 1892.11
246.02 1915.436
235.5 1947.026
230 1952.189
216 1930.324
208 1946.661
204 1963.761
229 1940.412
260 2131.672
260 2110.115
237.64 2090.971
198 1856.902
180 1722.362
158 1514.663

PIP si volum tranzactionat pentru ziua de livrare: 22/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
158.5(1-24)
41374.55
ROPEX_DAM_Peak
195.38(7-22)
30500.46
ROPEX_DAM_Off_Peak
84.74 10874.09
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
69 1297.891
69.39 1335.607
60 1245.431
53 1222.497
69 1254.565
90 1329.472
95.77 1542.067
134.63 1857.759
188 2004.47
209 2078.479
211.07 2049.321
211.11 1995.45
219 1982.674
215.83 1970.011
209 1922.76
200 1813.054
198 1791.702
208 1832.378
222.48 1985.921
219 1985.033
200 1921.037
185.2 1768.346
148 1719.043
119.5 1469.583

PIP si volum tranzactionat pentru ziua de livrare: 20/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
186.79(1-24)
36045.52
ROPEX_DAM_Peak
220.62(7-22)
25349.68
ROPEX_DAM_Off_Peak
119.14 10695.84
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
96.12 1486.735
90 1302.057
88 1226.015
88 1173.129
90 1179.699
90 1235.896
96.2 1286.805
98 1386.885
142.35 1423.975
198 1541.664
225 1569.929
225.6 1570.965
225 1557.588
225 1550.176
220 1548.534
210 1564.202
239 1648.643
289 1753.25
319.04 1793.845
289 1791.259
269 1746.401
259.65 1615.557
232 1638.44
179 1453.866

PIP si volum tranzactionat pentru ziua de livrare: 19/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
166.38(1-24)
41784.479
ROPEX_DAM_Peak
171.23(7-22)
29384.13
ROPEX_DAM_Off_Peak
156.69
(1-6) & (23-24)
12400.349
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
168
1751.903
139
1546.335
139
1493.013
149
1454.82
152
1431.495
168
1361.63
195
1470.353
198
1552.143
180.55
1695.326
181.19
1790.745
180
1840.963
168
1834.486
149
1825.048
139
1788.597
129
1769.921
129
1749.314
139
1778.773
187
2030.829
200
2144.903
198
2137.565
187
2057.122
180
1918.042
187
1785.171
151.49
1575.982

PIP si volum tranzactionat pentru ziua de livrare: 18/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
171.57(1-24)
46255.63
ROPEX_DAM_Peak
202.03(7-22)
34127.11
ROPEX_DAM_Off_Peak
110.64 12128.52
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
168 1472.736
98.36 1413.53
98.38 1317.602
90 1263.842
90 1277.149
98.36 1402.591
98.33 1630.585
187 1820.868
231 2071.271
249 2185.249
240 2235.805
235 2153.288
232 2149.978
228 2137.007
201.46 2141.799
187 2073.666
184.67 2101.897
200 2172.415
226 2400.059
200 2354.646
175 2295.855
158 2202.723
139.23 2155.801
102.79 1825.265

PIP si volum tranzactionat pentru ziua de livrare: 17/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
236.3(1-24)43178
ROPEX_DAM_Peak
273.48(7-22)
31342.74
ROPEX_DAM_Off_Peak
161.93 11835.26
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
188 1612.291
100.3 1453.708
95.82 1394.302
124.3 1323.652
168 1298.439
178 1436.428
187.53 1664.419
238 1928.545
278 1948.317
320 2033.147
280.25 2096.207
269 2072.237
280 2009.045
275.5 2013.024
260 1988.658
256.84 1900.097
259.99 1882.935
287 1992.677
319.04 1994.368
306.51 1970.611
298 1940.31
260 1908.146
232 1804.155
209 1512.281

PIP si volum tranzactionat pentru ziua de livrare: 16/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
205.88(1-24)
47892.1
ROPEX_DAM_Peak
242.24(7-22)
34721.47
ROPEX_DAM_Off_Peak
133.17 13170.63
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
100 1547.216
124 1629.552
118 1681.729
100 1704.527
100.83 1700.484
113 1659.225
185 1774.502
209.09 1886.208
238.5 2221.579
249.42 2259.562
250 2295.866
245 2378.326
245 2362.562
246
2300.4
235 2329.047
230 2246.612
230.39 2206.711
246 2173.169
269 2171.445
278 2120.641
260 2045.456
259.43 1949.388
210 1730.242
199.5 1517.652

PIP si volum tranzactionat pentru ziua de livrare: 15/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
176.29(1-24)
44629.94
ROPEX_DAM_Peak
215.48(7-22)
31309.87
ROPEX_DAM_Off_Peak
97.89 13320.07
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
21 1211.313
96.08 1730.959
96.05 1679.742
90 1644.186
91 1620.093
96.08 1581.699
125 1516.962
178 1616.875
210 2031.161
226 2102.463
226 2067.355
227 2041.019
229.63 2040.091
228 1929.773
221.4 1882.47
209 1840.925
209 1874.747
220 1987.816
259.97 2096.443
258.82 2149.295
219.87 2109.977
200 2022.501
167.94 1920.29
125 1931.783

PIP si volum tranzactionat pentru ziua de livrare: 14/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
184.51(1-24)
42412.5
ROPEX_DAM_Peak
222.65(7-22)
31515.93
ROPEX_DAM_Off_Peak
108.22 10896.58
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
96.42 1119.611
96.42 1273.499
90.99 1247.854
90 1196.223
90 1092.002
90 1207.908
131.14 1314.201
188 1600.722
225 1922.969
247.55 2110.301
250.21 2115.697
239 2081.048
235.5 2075.115
231 2030.716
229 1999.767
220 1946.238
219 1931.703
232 2050.415
259.97 2141.931
231 2085.832
226 2081.542
198 2027.729
170.98 1918.065
140.98 1841.416

PIP si volum tranzactionat pentru ziua de livrare: 13/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
162.14(1-24)
32985.48
ROPEX_DAM_Peak
188.83(7-22)
23262.83
ROPEX_DAM_Off_Peak
108.78 9722.646
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
90 1140.498
96.21 1247.589
90 1211.754
90 1157.983
90 981.889
90 1050.609
90 1136.23
96.25 1232.384
149 1325.19
189 1414.203
198 1458.491
195 1448.266
195 1450.121
190 1427.196
189 1407.682
185 1391.132
199 1481.892
224 1598.736
246.97 1691.581
229 1638.665
227 1630.191
219 1530.874
198 1502.275
126 1430.049

PIP si volum tranzactionat pentru ziua de livrare: 12/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
167.13(1-24)
35778.34
ROPEX_DAM_Peak
194.09(7-22)
25009.57
ROPEX_DAM_Off_Peak
113.21 10768.77
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
120.98 1321.283
120.98 1391.455
110.99 1321.859
98.85 1274.477
98.86 1230.088
103 1271.675
110.99 1305.193
168 1384.736
187 1485.25
209 1585.112
219 1640.795
217 1646.735
215 1639.338
200 1585.584
195 1547.499
185 1492.03
185 1468.675
200 1637.513
219 1714.549
215.33 1705.361
203.06 1671.184
177 1500.018
139 1461.951
113.01 1495.98

PIP si volum tranzactionat pentru ziua de livrare: 11/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
224.37(1-24)
38790.94
ROPEX_DAM_Peak
271.22(7-22)
27822.57
ROPEX_DAM_Off_Peak
130.67 10968.37
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
96.08 1320.063
101.99 1384.42
96.1 1344.433
96.11 1306.529
96.11 1299.018
155.8 1179.523
200 1370.717
200 1579.425
238.5 1813.328
289 1787.538
298 1800.383
298 1803.285
298 1791.021
298 1769.617
269 1806.295
258 1770.224
256.02 1797.938
298 1759.264
310 1763.694
300 1752.981
290 1719.781
239 1737.079
213.2 1656.105
190 1478.282

PIP si volum tranzactionat pentru ziua de livrare: 10/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
187.1(1-24)
41250.16
ROPEX_DAM_Peak
213.25(7-22)
29922.26
ROPEX_DAM_Off_Peak
134.79 11327.89
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
178 1406.528
140.98 1325.498
120.99 1280.235
104.57 1253.887
104.6 1270.392
140.98 1334.52
186.29 1513.03
200 1700.247
235 1887.309
260.72 1906.727
250 1929.888
232 1936.92
230 1923.405
228 1900.833
218 1889.366
208 1872.716
199 1838.881
200 1922.213
200 1998.973
199 1954.046
188 1882.577
178 1865.131
155 1792.779
133.2 1664.054

PIP si volum tranzactionat pentru ziua de livrare: 4/1/2013


Pret mediu [lei/MWh]
ROPEX_DAM_Base (1-24)
141.41
ROPEX_DAM_Peak (7-22)
186.49
ROPEX_DAM_Off_Peak (1-6) & (23-24)
51.27
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere a Pietei [lei/MWh]


20
57
30
29.57
27
50
75
166.96
192
198.8
209
210
210
209
198
175
177
209
210
209
188
147
100.88
95.68

ATENTIE: Data este in format: MM/DD/YYYY HH:MM


Today Date:
Interval
Introdu data:
3/17/2012 0:00
0.006944444

Hour

Minute
0
0
0
0
0
0
1
1
1
1
1
1
2
2
2
2
2
2
3
3
3
3
3
3
4
4
4
4
4
4
5
5
5
5
5
5
6
6

0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10

Date
3/17/2012 0:00
3/17/2012 0:10
3/17/2012 0:20
3/17/2012 0:30
3/17/2012 0:40
3/17/2012 0:50
3/17/2012 1:00
3/17/2012 1:10
3/17/2012 1:20
3/17/2012 1:30
3/17/2012 1:40
3/17/2012 1:50
3/17/2012 2:00
3/17/2012 2:10
3/17/2012 2:20
3/17/2012 2:30
3/17/2012 2:40
3/17/2012 2:50
3/17/2012 3:00
3/17/2012 3:10
3/17/2012 3:20
3/17/2012 3:30
3/17/2012 3:40
3/17/2012 3:50
3/17/2012 4:00
3/17/2012 4:10
3/17/2012 4:20
3/17/2012 4:30
3/17/2012 4:40
3/17/2012 4:50
3/17/2012 5:00
3/17/2012 5:10
3/17/2012 5:20
3/17/2012 5:30
3/17/2012 5:40
3/17/2012 5:50
3/17/2012 6:00
3/17/2012 6:10

PIP
140.01
140.01
140.01
140.01
140.01
140.01
92
92
92
92
92
92
90
90
90
90
90
90
76.01
76.01
76.01
76.01
76.01
76.01
74.51
74.51
74.51
74.51
74.51
74.51
90
90
90
90
90
90
98.28
98.28

00:00:00
00:10:00

00:09:59
00:19:59

6
6
6
6
7
7
7
7
7
7
8
8
8
8
8
8
9
9
9
9
9
9
10
10
10
10
10
10
11
11
11
11
11
11
12
12
12
12
12
12
13
13
13
13

20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30

3/17/2012 6:20
3/17/2012 6:30
3/17/2012 6:40
3/17/2012 6:50
3/17/2012 7:00
3/17/2012 7:10
3/17/2012 7:20
3/17/2012 7:30
3/17/2012 7:40
3/17/2012 7:50
3/17/2012 8:00
3/17/2012 8:10
3/17/2012 8:20
3/17/2012 8:30
3/17/2012 8:40
3/17/2012 8:50
3/17/2012 9:00
3/17/2012 9:10
3/17/2012 9:20
3/17/2012 9:30
3/17/2012 9:40
3/17/2012 9:50
3/17/2012 10:00
3/17/2012 10:10
3/17/2012 10:20
3/17/2012 10:30
3/17/2012 10:40
3/17/2012 10:50
3/17/2012 11:00
3/17/2012 11:10
3/17/2012 11:20
3/17/2012 11:30
3/17/2012 11:40
3/17/2012 11:50
3/17/2012 12:00
3/17/2012 12:10
3/17/2012 12:20
3/17/2012 12:30
3/17/2012 12:40
3/17/2012 12:50
3/17/2012 13:00
3/17/2012 13:10
3/17/2012 13:20
3/17/2012 13:30

98.28
98.28
98.28
98.28
195
195
195
195
195
195
180.4
180.4
180.4
180.4
180.4
180.4
189
189
189
189
189
189
190
190
190
190
190
190
190
190
190
190
190
190
190
190
190
190
190
190
190
190
190
190

13
13
14
14
14
14
14
14
15
15
15
15
15
15
16
16
16
16
16
16
17
17
17
17
17
17
18
18
18
18
18
18
19
19
19
19
19
19
20
20
20
20
20
20

40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50

3/17/2012 13:40
3/17/2012 13:50
3/17/2012 14:00
3/17/2012 14:10
3/17/2012 14:20
3/17/2012 14:30
3/17/2012 14:40
3/17/2012 14:50
3/17/2012 15:00
3/17/2012 15:10
3/17/2012 15:20
3/17/2012 15:30
3/17/2012 15:40
3/17/2012 15:50
3/17/2012 16:00
3/17/2012 16:10
3/17/2012 16:20
3/17/2012 16:30
3/17/2012 16:40
3/17/2012 16:50
3/17/2012 17:00
3/17/2012 17:10
3/17/2012 17:20
3/17/2012 17:30
3/17/2012 17:40
3/17/2012 17:50
3/17/2012 18:00
3/17/2012 18:10
3/17/2012 18:20
3/17/2012 18:30
3/17/2012 18:40
3/17/2012 18:50
3/17/2012 19:00
3/17/2012 19:10
3/17/2012 19:20
3/17/2012 19:30
3/17/2012 19:40
3/17/2012 19:50
3/17/2012 20:00
3/17/2012 20:10
3/17/2012 20:20
3/17/2012 20:30
3/17/2012 20:40
3/17/2012 20:50

190
190
182.97
182.97
182.97
182.97
182.97
182.97
159
159
159
159
159
159
150
150
150
150
150
150
169
169
169
169
169
169
194.3
194.3
194.3
194.3
194.3
194.3
189
189
189
189
189
189
182.97
182.97
182.97
182.97
182.97
182.97

21
21
21
21
21
21
22
22
22
22
22
22
23
23
23
23
23
23

0
10
20
30
40
50
0
10
20
30
40
50
0
10
20
30
40
50

3/17/2012 21:00
3/17/2012 21:10
3/17/2012 21:20
3/17/2012 21:30
3/17/2012 21:40
3/17/2012 21:50
3/17/2012 22:00
3/17/2012 22:10
3/17/2012 22:20
3/17/2012 22:30
3/17/2012 22:40
3/17/2012 22:50
3/17/2012 23:00
3/17/2012 23:10
3/17/2012 23:20
3/17/2012 23:30
3/17/2012 23:40
3/17/2012 23:50

175
175
175
175
175
175
105.97
105.97
105.97
105.97
105.97
105.97
98.28
98.28
98.28
98.28
98.28
98.28

PIP si volum tranzactionat pentru ziua de livrare: 3/1/2013


Pret mediu [lei/MWh]
ROPEX_DAM_Base (1-24)
199.46
ROPEX_DAM_Peak (7-22)
243.74
ROPEX_DAM_Off_Peak (1-6) & (23-24)
110.91
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere a Pietei [lei/MWh]


160
90
90
77
78.25
90
168
200
248
237.5
248
234.57
232
230
227
225
228
290
299
290
290
252.7
200
102

PIP si volum tranzactionat pentru ziua de livrare: 5/1/2013


Pret mediu [lei/MWh]
ROPEX_DAM_Base (1-24)
ROPEX_DAM_Peak (7-22)
ROPEX_DAM_Off_Peak (1-6) & (23-24)
Interval

183.49
221.79
106.88

Pret de Inchidere a Pietei [lei/MWh]


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

88
88
77
69
75
88
131.14
187.57
197
223
219
210
210
209
200
199
215
289.99
290
289.99
268
210
185
185

PIP si volum tranzactionat pentru ziua de livrare: 6/1/2013


Pret mediu [lei/MWh]
ROPEX_DAM_Base (1-24)
153.15
ROPEX_DAM_Peak (7-22)
184.76
ROPEX_DAM_Off_Peak (1-6) & (23-24) 89.94
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere a Pietei [lei/MWh]


129.1
80.02
45.37
30
20
25
50
85.5
129
150
168
147
150
147
147
168
197
290
290
289.99
288
259.65
210
180

PIP si volum tranzactionat pentru ziua de livrare: 7/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
182.34(1-24)
40333.29
ROPEX_DAM_Peak
200.74(7-22)
30172.25
ROPEX_DAM_Off_Peak
145.54 10161.04
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
185 1132.829
169.04 1158.029
159.74 1117.988
145.7 1091.222
95.42 1035.638
150 1035.866
180 1225.619
268 1541.418
232.84 1748.868
260 1784.941
220.62 1878.409
211.11 1951.87
202.4 1959.986
196.09 1912.701
178.86 1964.499
168 1930.578
171.4 1941.499
200 2055.38
210 2183.718
199 2113.17
164.23 2004.137
149.28 1975.459
129.3 1945.27
130.1 1644.196

PIP si volum tranzactionat pentru ziua de livrare: 8/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
174.05(1-24)
45779.87
ROPEX_DAM_Peak
208.17(7-22)
32886.01
ROPEX_DAM_Off_Peak
105.82 12893.85
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
90 1460.951
100 1570.022
90 1608.828
88.31 1522.795
71.85 1545.624
68.2 1558.579
101.56 1733.442
166 1885.263
211.9 2087.081
228.31 2155.081
226 2174.614
214.2 2147.613
210.1 2163.471
210 2157.282
201.6 2105.426
200 2055.401
200 2016.909
225 2057.702
257.2 2092.187
250 2101.686
228 2038.399
200.79 1914.457
190 1885.275
148.2 1741.78

PIP si volum tranzactionat pentru ziua de livrare: 9/1/2013


Pret mediu [lei/MWh] Volum [MWh]
ROPEX_DAM_Base (1-24) 208.08
ROPEX_DAM_Peak (7-22) 246.34
ROPEX_DAM_Off_Peak (1-6)
131.55
& (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

42240.75
29938.598
12302.152

Pret de Inchidere a PieteiVolum


[lei/MWh]
Tranzactionat [MWh]
100.84
1463.586
116.6
1519.99
109
1547.247
100.98
1526.051
103.99
1360.919
103.99
1461.41
180
1629.664
189.9
1782.128
229
2017.903
240
1988.861
246
1960.343
235
1960.058
248
1885.807
248
1889.824
235.93
1889.981
230
1818.528
231
1820.437
290
1843.779
299
1920.843
290
1877.626
290
1842.398
259.65
1810.418
219
1799.237
198
1623.712

PIP si volum tranzactionat pentru ziua de livrare: 21/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
177.86(1-24)
37807.39
ROPEX_DAM_Peak
219.11(7-22)
28841.38
ROPEX_DAM_Off_Peak
95.36 8966.013
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
95.88 1008.548
90 936.191
90 882.116
90 861.456
90
903.36
95.87 1008.408
190 1242.938
259.99 1677.485
251.75 1795.466
260 1791.095
249 1884.489
229 1837.987
229 1803.56
226 1796.564
210 1735.241
195 1686.722
198 1729.33
209 1874.289
219 2083.16
210 2090.162
198 1968.163
172.02 1844.727
112.6 1811.528
98.54 1554.406

PIP si volum tranzactionat pentru ziua de livrare: 26/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
114.93(1-24)
41009.35
ROPEX_DAM_Peak
124.71(7-22)
28439.18
ROPEX_DAM_Off_Peak
95.37 12570.17
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
96.33 1447.505
96.35 1471.828
96.37 1493.396
90.45 1483.73
91.5 1462.672
93.93 1471.139
92 1434.775
96.43 1424.953
99.03 1727.723
107.89 1788.814
123.9 1753.947
131.12 1793.027
134.5 1757.571
129 1805.304
118 1775.859
110 1780.726
116.5 1778.304
130.88 1828.62
165 1960.994
169 2005.275
150 1962.654
122.03 1860.632
99 1937.277
99 1802.624

PIP si volum tranzactionat pentru ziua de livrare: 29/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
190.85(1-24)
37113.37
ROPEX_DAM_Peak
228.19(7-22)
28049.74
ROPEX_DAM_Off_Peak
116.18 9063.634
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
139.52 1157.52
102.97 1054.525
98.23 1017.466
90 1014.422
90 1039.871
106.97 1149.53
159.97 1371.685
215 1623.691
230 1823.017
231 1945.677
229 1948.121
229 1882.694
229 1835.032
232 1871.041
229 1807.754
220 1696.58
220 1636.475
239 1757.022
269 1763.914
269 1788.219
231 1697.008
219 1601.808
159.97 1393.991
141.8 1236.309

PIP si volum tranzactionat pentru ziua de livrare: 30/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
205.06(1-24)
38966.45
ROPEX_DAM_Peak
246.66(7-22)
29830.74
ROPEX_DAM_Off_Peak
121.86 9135.706
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
119 1095.259
90 1006.417
90 960.236
69
955.84
90 989.839
98.86 1096.331
168 1371.906
198 1643.79
233 1838.556
259 1978.881
259 1972.221
249 1947.539
249 1914.72
249 1940.238
239 1904.441
234 1849.554
234 1827.41
270 1950.881
299 1939.974
287.58 1901.811
270 1941.853
249 1906.964
220 1645.125
198 1386.659

PIP si volum tranzactionat pentru ziua de livrare: 31/1/2013


Pret mediu Volum
[lei/MWh]
[MWh]
ROPEX_DAM_Base
149.65(1-24)
34358.73
ROPEX_DAM_Peak
176.56(7-22)
25689.49
ROPEX_DAM_Off_Peak
95.85 8669.246
(1-6) & (23-24)
Interval
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Pret de Inchidere
VolumaTranzactionat
Pietei [lei/MWh]
[MWh]
140.01 1011.165
92 1027.043
90 962.686
76.01
946.23
74.51 986.015
90 1096.096
98.28 1320.703
195 1624.774
180.4 1681.946
189 1708.461
190 1700.733
190 1642.531
190 1617.18
190 1617.924
182.97 1573.68
159 1555.852
150 1571.417
169 1632.651
194.3 1663.469
189 1648.109
182.97 1602.578
175 1527.477
105.97 1406.756
98.28 1233.255

You might also like