Abstract
The project focuses in the investigation of substations configurations and in the
comparison of them, by taking into account several factors that affect their choice in
substations in transmission system.
In chapter one, we have a description of the transmission of electricity and a reference
of the basic utility and destination of a new substation.
In chapter two there is a presentation of different kinds of substations, giving special
emphasis to transmission substations.
In chapter three there is a reference in basic equipment of a transmission substation
and a description of the components, whose continuous operation is important for the
operation of the substation as a whole.
In chapter four we present the parameters of a substations design and the standards
of the selection of a substations configuration.
In chapter five there is an analysis of all kind of configuration of transmission
substations, with a reference in their method of operation and their advantages and
disadvantages.
In chapter six different types of bus protection is presented for all kinds of
configurations.
In chapter seven we have a comparison of the different configurations by several
factors that affect their selection in each substation, such as reliability, cost, extent of
ground etc. Finally we present the conclusions that come from the comparison above.
Keywords:

Configuration, Types of Substations Configuration, Reliability of

Apparatus, Parameters of the selection of Substations Configuration, Arrangements


Comparison.

. ,
..
.
. ,
... .. .
. ,
.
,
,
.


Abstract .......................................................................................................................... 6
1. ................................................................................................................. 12
2. . .................................... 14
2.1 ................................................................................................................. 14
2.2 .......................................................... 15
2.3 ......................................................................................................... 18
2.3.1 .......................................................................................................... 18
2.3.2 ..................................................................................... 20
2.3.2.1 / ........................................................................................ 20
2.3.2.2 / ......................................................................................... 21
2.3.2.3 / ........................................................................................ 22
2.3.3 .............................................................................. 22
2.3.3.1 150kV/. ....................................... 24
2.3.3.2 150/20 kV ................................... 26
2.3.3.3 (..) ....................................................... 31
2.3.4 SF6 (GAS INSULATED SUBSTATION) ...... 33
2.3.4.1 GIS...................................... 34
2.3.4.2 ....................................................................... 35
2.3.4.3 ............................................................................................ 36
2.3.4.4 - .......................................................................... 37
2.3.4.5 37
3. ......................................................................................... 39
3.1 ............................................................................................................ 39
3.2 (/) ..................................................................................... 39
8

3.3 ....................................................................................... 43
3.4 ................................................................................................ 44
3.4.1 ...................................................................... 49
3.4.1.1 ................................................................................................... 49
3.4.1.2 ............................................. 51
3.5 ................................................................................................................... 53
3.5.1 .......................................................................................................... 53
3.5.2 T ................................................................................................. 53
3.5.3 .......................................................................................... 54
3.5.4 ........................................... 55
3.6 ......................................................................................................... 56
3.7 ..................................................................................................... 57
3.7.1 .................................................. 58
3.8 ......................................................................................................... 59
3.8.1 ................................................................... 59
3.8.2 ................................................................... 59
3.9 - ............................................................. 60
4 . ....................................... 61
4.1 /. ................................................................................... 61
4.2 ........................................................................... 62
4.3 /. ...................................................................... 66
4.4 .......................................................................... 69
5. .................................................................................. 72
5.1 ............................................................................................ 72
5.2 ..................................................................... 76
5.3 ................................................... 78
5.4 ........................................................................... 81
9

5.5 1.5 (breaker and a half) ........................................................ 87


5.6 ,

(Breaker and a third bus

arrangement)............................................................................................................. 95
5.7 . .................................... 97
5.8 .............................. 101
5.9 .......................................................................... 102
5.10. ................................................................. 104
6. ............................................................................................ 106
6.1 .......................................................................................................... 106
6.2 . ........................................................................ 108
6.3 . ................................................................... 110
6.4 ............................................... 110
6.5 . ......... 112
6.6 - . ........................................ 114
6.7 - . ..................................... 116
6.8 . ..................................................... 116
6.9 1.5 ................................................................... 119
6.10 . ........... 119
6.11 ....................................................................... 122
6.12 .......................................................................... 124
6.12.1 . ........... 124
6.12.2 . .................. 126
6.12.3 ............ 127
6.12.4 . .............................. 130
6.13 . ............................ 130
6.13.1 . ......................................................... 131
6.13.2 . ........................................................ 131
10

6.13.3 . ................................................................ 133


6.14 . ............................................................................. 136
7. . ................................. 137
7.1 . ....................................... 137
7.2 (service
continuity). ............................................................................................................. 139
7.3 . ................................. 141
7.4 . ............................................................ 142
7.5 . ................ 144
8. ....................................................................................................... 147
9. ......................................................................................................... 149
......................................................................................... 151
................................................................................... 152
................................................................................... 154

11

1.

(/) (150 kV) (20 kV)



() 50(),
,
(),
230/400 V, .
/ 150/20 kV (
/)
, .
/


(, , , .) .

, /
.
/
,
.


.
/ ..
12


/.
.
/,

,
.
2

, / .
3 /
.
4 /
,
. 5 /
. 6

7
.
,
.
.

13

2. .

2.1
1889
. ,
,
,
(
). ...,
. 11600
823. 1950
,
,
.
... .. .

. 2001
,
.
, ...
, 2000
( ..).

,
(
) .

14

... .


(
330 MW) ,
,
,
, 24
.

. ,

36

, 18 5 ( ).
12069 MW.

.

400 KV, ,
.
400 KV ,
66 KV ,
, .

2.2

(...)
,
.
.


,
.
15


( 220 KV)
( 500 kV) ,
, ,

380/220 V.
... ,
.
, 50 60 Hz,

. .
.
,
120 .
.
:
.
,

.
.
:
1.
2.
3. .

.


,
,
, .
16


. ,
.

.
,
, ,
.
, ,
.
,
,
,
.

.
,
.
,
.

. ,
.
.
,

,
.
66 kV, 110 kV, 132 kV, 138 kV, 150 kV , 220 kV,
275 kV , 345 kV , 400 kV , 500 kV, 750 kV , 1100 kV , 1500 kV 2000 kV,
.
66 220 kV
( ), 275 500 kV
17

() 500 kV (
).
.

.
.
, ,

.

(, , ,
)
.



.

2.3

2.3.1

, .
15 kV 20
kV. 15 kV 20 kV
, .
150 kV 400 kV
. 150 kV
(.. ). ..
18

...)

(,

, ) ..
.. ... .. .. ..

.
(/).

, .
,

, .

,
.
,
, ,

6 20 kV .
,
. ,

,
.

:
)
)
/ ,
,
.

.

19

/ .
/ .
/ .

2.3.2

/ .
15 20 KV 220/380 V.
/
, .
.

2.3.2.1 /


.
.
250 kVA .
.

,
. ,

.

.

20

,
.

.

2.3.2.2 /
. /

/ /. /
, ,
.
/


.
. /
/
/,
/.
.
/
,

.

21

2.3.2.3 /
/
. /
/.
/

. ,
.

.

.

.

/

.

2.3.3

/ :

22

1. /
/ .
.
2.
/
150 400 KV 15 20 KV.
3. /
/ ( )
.
.
/ ,
..
:
192 (/) 150 kV / MT 173
, 14
, 4

. 11 / (/),
8

/, 3

. / 31
. 27 / 150 kV / ,
.
/ :
()
/
. / -

23

, ,
().
SF6 (Gas Insulated Substations)
,
,
, ,
/. /
( , -,
, . , ,
(SF6),
. /
.

/ (GIS) ,
.

2.3.3.1 150kV/.
/ .
.
6 kV, 3 kV
220/380 V
. /
. /
150/15 kV,

24


.

.

(, ),
.
:

(, : ,

, )

(, , )

,
,
. Diesel,
,
,
,
, .
,
,
.
:
( 15 20
kV 150 380 kV)

.
()
( , ..)
.
25

2.3.3.2 150/20 kV
,
.

.

.
400 kV, 150 kV 20 kV 15 kV .
/ 150/20 kV
, 20 KV
70 Km ..
70 Km /
. H /

. /
,
/
.
/

. 150 KV / ,
/ .
/ 150 kV
/.
150 kV
/. /
/ . /
150 kV 20 kV ( 15 kV)
/.

26

' ,
/ . ,
, 150 kV /
/ () 150 kV.
20 KV / 20 kV.
,
.

.
/ 150/20 kV "" /

. , , . 150 kV 20 Kv
.
, /
() , .


/. 20 KV
20 kV / 20 kV. /
/
20 kV.


.
.
/ /, ,
,
.
/ / , ,
.

27

/ .
.
/
.
/ / ,
,
(SF6)
.
/ ,
" "
.
/ /
.
:
1. / 150 kV .
/
/.
2. / 150 kV / .
(1). /
150 kV
150 kV.
3. / 150 kV
150 kV, .
4. 20 kV / 20 kV, 1200
, /.

20 kV.
20 kV /
28

.
/ '
, .
/.. 2000/5 950-720/0.58
.
5. / / 150/20 kV,
20 kV 20 kV, 2000 .
/ /
. / 40/50 MVA
,
/ . / 40/50 MVA

/ ( ) /. /
950/0.58 15 kV, 720/ 0.58 20 kV
20 kV, 400/1
(2000/5 ).
6. 20 kV ( 15 kV) , , 20
kV ( 15 kV) / 20 kV (15 kV)
( ).
20 kV 1200 , 500 MVA
/ 950/0.58 15 kV, 720/ 0.58 20 kV
600-400-200/5 400/1 600-400-200/5
20 kV. 15 kV
.
7. / 150/20 kV (15 kV) 40/50
MVA, .
/ .
/ 40/50 MVA ,

. /
/
29

/. /, .. BUCHHOLZ
..., - , .
8. :
. /.
. / 20-15 kV/ 100 V ,
.
. / 1000-500/ 5-5 / 20/25 MVA, 2000-1000/
5-5 / 40/50 MVA
0.5820 5820.
. / 75 kVA
/.
.
().
/ :
1. (150 kV) (380 KV) ..
2. 20 kV ( - 22 kV).
15 20 kV.
3. / 220/3 80 ..
4. / 110 V .. 220
..
5. /
.

(0) V.
1.
2. .
(/) (
) .. 220/380V. :

30

1.
2.
3. / ...__

(150/ 20 kV)
2.1 ( / ).

2.1 / ( ... ..)

2.3.3.3 (..)
()
400kV 150 kV
150 kV. 13
31

3 ,

400 kV.

,
(, , ....).
400 KV 1952.

380/400 KV, . ,
400 KV, 1959 500 KV.
, ,
.
,
,
.
765 KV
1000 2000 KV .
, ,

.
, ,
.

.

.

.

32

2.2 .. ( ... ..)

2.3.4
SUBSTATION)

SF6

(GAS

INSULATED

/
SF6.
1960 SF6
,
,
, GIS /.[18]
SF6 (GIS) 25
.
72 Kv 800 kV .[19]
GIS :

33

SF6

(Air Insulated
Substations).

.

, / GIS
.

/ ,
.

, /
(modules).


. /
GIS
.[21]

2.3.4.1 GIS

/
:
1. .
.
2. ,
SF6
, , .

34

3. SF6 /.
/ .
1/5 /,
, .
4. / (
20 ).[22]
:
1.

.

.
2. (modular construction)

/.

2.3.4.2

(Life Cycle Cost)


/. LCC / GIS
,
GIS .
(redundancy),
, /.

LCC :
35

LCC= CI +CP +CR +CO +OC +CD,

CI: (, , , , ).
CP: .
CR: .
CO: .
OC: .
CD: .
/ GIS
/ GIS.
.
/ GIS
, , .

2.3.4.3

GIS
/ .
. / GIS
99.8 %. 0.2 %

. /
GIS

,
/ ,
.
/
. /
36

,
.
/ SF6,
.
SF6 ,
.

2.3.4.4 -

,
/ GIS, .

SF6,
.
/ GIS ,
/.
GIS 0.02
. 40 ,
.


400 kV.

2.3.4.5

H / GIS (indoor-outdoor GIS)


,
/.

/ GIS ,
37


, , ,
, , .
GIS ,
.

/ GIS , ,
/ GIS
.
/ (GIS) / (AIS)
/ GIS
.

, / GIS
, .

38

3.

3.1

/ .

.
( , ..)
,

.

3.2 (/)

/ /. /
. ,

.

, .
V1, I1 N1
V2, I2, N2 :
(= )
/
/ .
. .

39

/ :
/ , /.
.. ..
.. / 35 kV
400 kV.

/.
.
/ , Joule,
( ). ,
' ( ).

/ .
.
/
.
/

. / .

40

3.1 / ( ... ..)


:
1. ( ),

2. ,
.
.
:
1.
.
2. ,
, Kilovoltamperes (kVA).
3. .
(taps)
.
41

4.
.
(taps),
.
5. , ,

.
.


.
:
1.
2.
.
,
:
1.
2.

3. .
4.
5. ()
KVA
.
6.
.
42

/ / ,
15,75KV 23KV ( ),
15,75KV 21KV 21KV. /
, 15,75KV 21KV,
/ 15,75KV,

21KV.
15KV 20KV
/ /
.

3.3

( ,
) ().

VH VX .
/

,

43

1 2 .
()
(/)

,
.

.
,

.

3.4
,


.
,
, , ...
,
,
. , ,
,
, ,
.
, ,

.
, .
.
44

,
,

.
, .

.
, , ,
, .
:
.
.
.
. (SF6)
. .

1.
.

.
.
.
. ,
.
() .

( )
.
, .
66 kV,
45

275 kV.
.
.

3.2 ( ... ..)

2.
,

.
.
, (,
, ). 20-220 kV
250-7500 MVA.

.
220 kV, .

46


.
, .. 72.5 kV 765 kV
.

.
.

.

.
.
.

.

,
.
3.
.
(
), (
) .
.
. ,
.
20-30 ata 60 ata.
,
,
.
.
110 kV .
47

4. SF6
SF6 ,

. SF6
. SF6
.
,
15 ata, ..
50 ata. SF6
,
. .
SF6
(puffer type technique). SF6

. 230 kV, 15000
MVA. SF6 .

3.3 SF6 ( ... ..)

48

5.
.
.

. , ..
,
.

. ,
138 kV, 760 kV 40 kA.

,
.

.
.

3.4.1

3.4.1.1


. ,
,
.
, ,
.

49


.

.
:
1.
2.
3.
4.
5.
.


. ,
(2)
.
:
1. (I2R)
2.

3.

.
,
.

.
.

50

3.4.1.2

, ,
. .

, .
,

.


. ,
,
. ,

.
,
,
.
,

.
,
,
.
,
.


. ,

51

, ,
,
.
, ,
,
.
,
, ,


. , ,

, .
.
, 150 kV, 66 kV 30 kV
,
.
/ . /

, ( )
. (
15 . 19 ... ( ),
50% ,
0,9 1).
15
kV 20 kV, 20
kV.
.

12MVAr ( 20 kV) 4
MVAr
.
52



150 kV
.

3.5

3.5.1

. ,
,

.
,
,
.
,
, , .

3.5.2 T

, , , .

. ,

,
:

53



(TRANSFER)





.
.

3.5.3

,

, ( )
:

,
,

.

54

,
.
,
,
.
( )
, . ,

,
(TRANSFER). /
/
150 KV/ ..,
. / ..
,
, ..
/ /
.

3.5.4


()
20/16 , 30/24 , 60/52 , 80/70 ,
6m. 150 KV 30/24 ,
,
6 m. 8.5 m
60/52 . 20 KV
30/24
/ . ,
/ 20 KV
55

30/24 / 10/12.5 MVA, 60/52 / 20/25 MVA,


80/70 / 40/50 MVA. 20/16
/ / .

/ 150/20 KV 150 KV .
,
150 KV 240 2.


: .
,


.

3.6

. ,
.
.

(
).

.

56

.
( 250KVA
) .

.

.

3.4 ( ... .)

3.7


.

:

57

1.

.

.

.
2.

.
.

.
3.
.

3.7.1

.
.

.

.
.

.

58

3.8



.
.

3.8.1



. .


.
.
25 /kV
31 / kV (RMS) .

,
.

3.8.2

.

.
.

59

3.9 -

,
(CARRIER),
:
,

.

, ()
(50 Hz)
( 350 Hz) .

50 Hz,

, .

.
,
,
.
.

60

4 .

4.1 /.


:
, .[17]

.

( )



.

.
150 V 400 KV .
,
.
61



.


.



,
.

.


.
.

, .
.

4.2


/,
. /
.[15]
/
:
62

) / .
) ,
.

/ ,
. .

/.
.

/,
,
, /
.
/ 30
50 .
.
,
100%
.
/.
,
,
.
63


.

, .
GIS( Gas Insulated Substation),

.

.


, , .
:

1. .
2. .
3.
.
4. /, .
5. .
6. .
7. .

64

/
:
a) .
b)
.
c)
.
d)
.
e)
.

.

:
1. .
2.
3. .
4. .
5. .
:
a) .
b) .
c) .
d) .
e) .

65

f)

).

4.3 /.

/ ,
, .

, / ,
,
.
, , ,
.
,
, , ,
, ,
, /
. /
.

.
,
,
,

. .
,

66

.
.

/.


,
/, ,
.

. ,

.
1.
.
, .
/ .
.

/,
.
2.

, ,
, ,
.

67

3.
,
,
.
4.

,
, .
5.
, /
, .
/
.
.
6.

/
.
7.
,
, , , ,
/
.
8.
,
, /
, ,

68

, /
.
9.
, /
/ ,
.
10.
, /
,
.
,
, .
, /
.
/
.

4.4


:
) .
) .
) .
) .
) .
69

) .
) .
) .
)
.
) .
) .
) (

).

.
, ,
,
.
) .
,
,
,
.
.

,
.
) .

:
i) .
70

ii) .


.
) .


.

.
.


.
,

.
.

,
.
1.5
.
) .



.

71

5.


. ,
, ,
, ,
.
,
.

5.1


.
.

. 5.1
.



.

.
72


.
,
.

.


,
. 5.2
.

.

.
, '
.

.
.
.

.

.
.

73

.5.1

74

.5.2
.

75

5.2


5.3.

.
.


.


.



.


.

.

.
.

.

.

76

.
.

.5.3 .

77

5.3


.

.

,
.


.
,
.
.

.
5.4 .


. 5.5

.


.
.

.
.
.
78

.

.

.

.5.4 .

79

.5.5
.

80

5.4


.
.

5.6.
.
,
.

.

.


.

,
.


. .

,
.

, . ,
o

81


.
,

.


.

,
.
.

.


.

.
.

,
5.7.
1 2
1,
1. ,


.
1.5 5.8.
,

82

.

.
.
1.5 .
,
,


.
.
.

.
1.5
.

83

.5.6 .
84

.5.7 .

85

.5.8 1.5 .

86

5.5 1.5 (breaker and a half)

H . 5.9

. 3 ,
1.5 .
.
,
.

. 1.5

,

.


.
.
.
1.5

.
.
,
,

. 1.5

.

87




1.5 . 5.10
5.9.


.

,
.


. 1.5 ,

.
,
. 5.11
.
5.12 5.12
.



.
,
.


. .

88

.
.



.

,
.
.


.
. 1.5
.
3

.

89

.5.9 B 1.5

90

1.5 .

.5.10 1.5

91

.5.11 1.5
.

92

.5.12 1.5
.

93

.5.12 1.5
.

94

5.6 ,

(Breaker and a third

bus arrangement)

.
1.5
.

1.5 .

.
5.13 .

.


.

.

.

.

.

.


.
1.5 .
. 1.5

95

, ,

.5.13 1.5

96

5.7 .

.
.


5.15.[7]
,

.
,

.

.
.

,
, .

.
1.5
. 1.5
,

.

.

97



.

.


.
.
.


.
.
1.5

.

/.

98

.5.14 .

99

.5.15 - 1.5
.
100

5.8

5.16
. 2 3
(coupler). 2 3
.
,
,
. .


.
.[17]

,
.
, ,

.

.

101

.5.16



, .

5.9

,
.
.
.

102


. ,
.[17]

5.17 .

.
, .
3 .

.5.17 .

103

5.10.

. 5.18()
.

, 5.18().[17]

.

5.19.
.
5.18
.

.5.18 .
)
)
104

.5.19 .
.[17]

105

6.

6.1

/
:
I.

II.

III.

IV.


:
.
.
.
.
.
:
.
.
.
.
.

106



/.
,
, .
,
, ,
.. [23]

:
1. .
2. .
3. .
4. .
5. .
6. .
7. .
8. .

, 6-7% ,
60%.
,
.

.
,
.

107


, .[24]
, ,
.

: .

.

.
.[25]

. .

6.2 .


. ,

.
,

.

,

. /.

, .

,
108


. ,
,
, / , .


.


/.

,
.
.
/
.
:
.
.

.
,
, ,
/.
. ,
, ,
( )
.[24]

109

6.3 .

, ,
, / .

/ ,
6.1.


.
.

. /
.[25]

6.4


,
. /
. 6.2

(52) , .
(52) .
.
/ .[25]

110

NC = Normally closed,
. 6.1
.

111

NC =Normally Closed =
. 6.2

.

6.5
.

6.3.
6.1., .
( ).
,
.
.

(52)
112

.
.

. ,

.
.

. /
.

NC = Normally Closed =
NO = Normally Open =
. 6.3
.
113

6.6 - .

6.4
.
, , , ,

.
: .
. 6.4,
1 2 1, 3 4
2. :
1 2.
/ , .
, /
.
,
, .

114

NC = Normally Closed =
= Normally Open =
. 6.4 -
.

115

6.7 - .


6.5.
, . /
,
.
.
, ,
.
,
.
, /
/ .

6.8 .

6.6 ,
. .

.
,
.

6.6,
.
, .
, /
, /
.

116

C = Normally Closed =
. 6.5 -
.

117

C = Normally Closed =
. 6.6 .
.
,
.

118

6.9 1.5

, 6.7, ,

.
, .
.
.
.
/
6.7.
/ / .
,

.
.

6.10

.
-
6.1, /
6.8.
/ . /,
, / .
/ /
.
/
.
/.

119

C = Normally Closed =
. 6.7 1.5
.
,
.

120

C = Normally Closed =
. 6.8
.

121

6.11

/
/

. /
.


,
6.9. / ,

.
,
.


6.10.
/ .
/ ,
,
.



.

.

122

. 6.9 / .

. 6.10 / .

123

6.12 .


,
.
, /

.
. /

. ,
/
.
/ . /

,
.

/: 1) 2)
. /
.
. ,
.
,
/
.

6.12.1 .


/ , .
124


.

.
. /
,

6.8.

, ,
/ .
. , ,
.
.
,
/ .
,
.

.

. ,
/
/ . , /
/ .
,
.

.
0.15 ,
50-100 ms.

125

6.12.2 .

/
/
. 6.11.
, VR

ZR , / (1)
/ (2 3) .
, /

.

.
.
RL (
) RL 2RL
-.
, 6.9,
Zn
. V R

/ .
ZR
.
, dc
.

R LR

ZR .
/
(RS + RL ) .
/ ,
,

126

/ , ,
RL .
/
. /
, ,
,

.

,
.

/ ,
.
20-30 ms

, 8-16 ms .

6.12.3 .


/ ,
. /
,
.
, .
/ ,
/
.
/

127

/ .
, VSec= IPri M V, 0.005
60 Hz. 5 V 1000
.
,
,

.
.
, ,

. IR :

R ZC
. ZC 2-20 R.
.
2 50 mA . 16 ms
.

.
ZC,
VSec.
,
, .
.

128

. 6.11 .

129

6.12.4 .


,
. /

-o .
5 /, / .
/,
.
, ,

. ,
,
.
/
2-3 ms .
.

6.13 .


. ,
, .
.

130

6.13.1 .

/
(51).

/ .
,
, /,
dc . , dc
. 15-20
(60 Hz)
.
,
.
.

6.13.2 .

,
, , . ,
.
,
.
, . [25]
6.12

.
.

131

.
.


.[26]

/ , .

,
. .

.6.12 .

132

6.13.3 .


/ .
,
/
.

.
6.13. /
.
. 6.13 , 51
.

. 51
,
.
/.
,
(21)
51. 21 ,
.
,
51 .
.[25]

133

. 6.13 . )
)
. )
. ( ).

134

. 6.13 () ) .

135

6.14 .

.

.
.
.
,
.[25]

. 6.14 .[26]

136

7. .

7.1 .


,


.[7]
1
,
.
.

7.1: .[7]

100%

122%

176%

156%

1.5

158%

214%

137



.
.
,
.

,
.

.

:
) .
) .
) .
) .

.

,
.

138

7.2
(service continuity).

,

.

, , .

,
. ,
.[15]


.

.
1:
.
: 1
( )
.
2: ( 4 )

.
3:
.
4: .

.
139

, ,
.
7.2: service continuity [15]

- 1 2

(. 1)

12


1.5

(. 2)

12

12

1 2

( )
-1.5 1 2

(. 2)

- 3

1:
.
2: 1 . 2
.
140

7.3 .


.

.[4]

.
7.3 :


1.5

141

7.4 .


/. ,
.[22]


,

.
,
.
, ,
.

:

.
/
.
55 65%
.

142

.7.1

,

.
,

..,
.

( )
,
143

, (,
/ )
.

.7.2

7.5 .


.[5]

144

7.4: [5]

10

10

1.5

,

.

.
:


(
735 kV).


( ) .
145


.

. ,
,
.

.

.

.

146

8.


.

.
,
.
,

.

.

.
, .

.
5.2,

.

.

1.5 ,

.
,

.

147


.


.
.


,
.

.

148

9.

1. -, , , ,
, .
2. , . ,
1993.
3. ,
. , 1985.
4. Electric Power Substations Engineering , Second Edition , John D.McDonald
5. THE APPLICATION OF MULTI-CRITERIA ANALYSIS TO SUBSTATION
DESIGN IEEE Transactions on Power Systems, Vol. 13, No. 3, August 1998
6. . , ,
1996
7. Substation Bus Arrangement Guideline Working Group Report Presented to the
NEPOOL Reliability Committee April 4, 2006.
8. . , . , ,
2001
9. Composite Reliability Evaluation Model for Different Types of Distribution
Systems IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 18, NO. 2, MAY
2003
10.500-kV AC Substation Design Criteria Summary of Industry Practices
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, VOL. PAS88, NO. 6, JUNE 1969
11. Substation Expansion, Reliability, and Transformer Loading Policy Analysis
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, VOL. PAS88, NO. 8, AUGUST 1969
12. Substation Reliability Evaluation Including Switching Actions with Redundant
Components IEEE Transactions on Power Delivery, Vol. 12, No. 4, October 1997
149

13. Reliability of Substation Configurations Daniel Nack, Iowa State University,


2005
14. , 1994
15. GENERAL GUIDELINES FOR THE DESIGN OF OUTDOOR AC
SUBSTATIONS CIGRE, Working Group 23.03, August 2000
16. QUESTIONNAIRE CONCERNING ASPECTS ON PLANNING, DESIGN,
OPERATION AND MAINTENANCE OF FUTURE SUBSTATION CIGRE,
Working Group 23.01, August 2000
17. , , 1985

18. The impact of new functionalities on substation design TECHNICAL
BROCHURE, No 244-June 2009 ELECTRA 45
19. GIS-State of the Art 2008 TECHNICAL BROCHURE, No 244-June 2009
ELECTRA 51
20. --
, , ,

21. 400 kV
1995, .
, .., ..
22.

. , .
23. Switchgear and Protection U.A Bakshi, M.V. Bakshi, Technical Publications
Pune
24. Power System Protection P.M. Anderson, IEEE PRESS SERIES ON POWER
ENGINEERING
25. Protective Relaying: Principles and applications, Second Edition, J. Lewis
Blackburn
26. Protective Relaying Theory and Applications Second Edition, Revised and
Expanded, Walter A. Elmore

150


,
/
.. .
, / 20 kV
, - 150
kV. .