MTO

MTO: Material take off.


It contains the following list:
1) Line list.
2) Equipment list.
3) Components list.
4) Special components list.
Types of MTO:
1) Zero level MTO : Bulk MTO
2) Intermediate MTO : Reference MTO
3) Finalized MTO : Vendor MTO

1) Zero level MTO: It is extracted from
P&ID for bidding purpose.
The alternative software for these
process SP-P&ID
It is done by the consultant.



1
MTO
Intermediate MTO:
It is extracted from general arrangement
diagram.
It is done by piping Engineer.
This is used as a reference document.
It is termed as a check list.

Finalized MTO:
This is extracted from Isometrics by
Piping Engineer.
This is used for Purchase material.
It is required for fabrication.



2
MTO
Sample of MTO:
See the Auto cad drawing of MTO.