PRE - TASK PLANING

COMPANY / VENDOR: DP STAR


CONDUCTED BY: JOE
DATE CONDUCTED: 02/ AUGUST /2014
SPECIFIC LOCATION: PG8
AREAS OF FOCUS
1. PPE COMPLIANCE
2. TOOLS AND EUIPMENT ENSURE IN GOOD CONDITION
PRE ! TASK PLANING
STEPS " DESCRIPTION OF #ORK AREA $A%ARDS ACTION
1. To inform project coordinator before start work.
2. To deliver material and tools to work area.
3. Electrical tools s!c" as "and drill screwdriver
and etc to be !sed to perform t"e work.
#. To inform P$% &ps before t!rn off t"e control
breaker. To !se "and drill to make "ole on t"e
panel and to fi' t"e new (&A switc" b) !sin*
screwdriver.
2. To do "o!sekeepin* at t"e workin* area once t"e
job done.
+,omm!nication
breakdown.
+-n a!t"ori.ed entr)
into t"e work area.
Electrical "a.ard
P")sical inj!r)
/orker movement0
fall "a.ard
1allin* object
Trip 0 fall "a.ard
+To c"eck t"e work plan before start
work.

+To barricade t"e workin* area wit"
proper si*na*e2s and do allowed
!na!t"ori.ed person into t"e work area.
+All t"e electrical tools to be c"ecked
prior to !se. To !se E3,4 for powered
tools e'tension cords.
+To compl) wit" proper PPE5 to wear
"and *loves w"en doin* fabrication work
and "andlin* s"arp ed*es.
+To inform t"e area s!pervisor before
start work. To barricade t"e workin* area
wit" relevant safet) si*n.
6eep t"e work area clear from loose
material and debris (o!sekeepin*
maintainin* t"ro!*"o!t t"e work process.
All !nwanted materials to be clear from
work site.
TOOL BO& MEETING DISCUSSION ANNO#NEDGE SIGNATURE
NO NAME SINGATURE
FOREMAN
PPE
PROPER
BARRICATION
1
$OUSE KEEPING 2
'
4
(
)