1. The report will be generated in USD currency only. 2. The report will be avialable in DP or KPC UOM for all materials.i.e. if BUM i s PAA the report will be genderted in DP. 3. The report base is standard cost estimate. All material which is having a std cost estimate can viewed in this report. Summery Report 1. Detailed View can also be taken from Drill down option Detailed Report 1. All material Cost components can be viewd horizontally. Cons. 1. As the no of component get increases Report will get expanded horizontally. 2. Same Component can be duplicated in report as cost component structure varies from Controlling area to Controlling Area.