1 PT. Pesona Khatulistiwa Nusantara Company Highlight Company Structure Concession Location Legal Permit Progress Corporate Journey Coal Deposits Geology Data Coal Reserves Typical Coal Quality Strategic Planning Infrastructure Planning Business Planning Coal Upgrading Production Plan 3 Year Strategy Shareholders 12 November 2012 Agenda 2 119 million tones PT. PESONA KHATULISTIWA NUSANTARA (MEMBER OF ENERGI NUSA MANDIRI) 3 Company Highlight 12 November 2012 4 Vission To be a world class coal mining enterprise that extracts and adds value to the coal for the benefit of mankind. Mission To produce and supply world class coal based products through the application of best practice in its operations, cost efficiency, safe and enviromentally friendly processes and best fit technology. To develop a corporate culture that promotes integrity, trust, enthusiasm, respect, innovative thinking and solid teamwork. To develop people to be the brightest in their filed to return excellent performance. To enhance the quality of life for the community that will provide sustainable prosper Company Highlight 12 November 2012 5 Energi Nusa Mandiri (ENM) is established in 2010 (as a new holding) starting with PT. PKN as its first member. PKN has 1 Concession in Bulungan Regency under PKP2B 3rd Generation and has mining license covering an area of 23,646 Ha. Exploration in Bulungan has been conducted partially: Total 171 holes Total 9,155 meter depth Company Highlight (continue) 12 November 2012 6 Typical coal quality in Bulungan Regency is: Classified as Lignite Average Moisture 45-46 % Low Sulphur < 0.2 % Low Ash Content average 4% Calorific Value in the range of 3,400 kcal/kg gar PKN was started mining operation in September 2009 from Kelubir mine location (1 st Block) in Bulungan Regency. Sales Contracts from Domestic and International Market has already in place for PKN. First shipment was completed on 21 st December 2009. PKN next steps will be: Develop PKN Sekayan mine location (2 nd Block) in Bulungan Regency Company Structure 7 12 November 2012 Bulungan Regency Jeffrey Mulyono Director Crescento Hermawan Commisioner Tria Suprajeni Finance Director Crescento Hermawan Development Director Jeffrey Mulyono President Director ENM Ismanto Rialdy Chief Operation Officer There are 3 Mining Location in Bulungan Regency: 1. Kelubir (Commencing production on Sept 2009) 2. Sekayan (Construction start on 2011) 3. Mangkupadi The Distance to the Port is average 16 km PKN Site Location 8 Bulungan Regency 12 November 2012 Edited by Foxit Reader Copyright(C) by Foxit Software Company,2005-2007 For Evaluation Only. 12 November 2012 Legal Permit Progress 9 CCOW General Survey Exploration Stage FS & AMDAL Construction Production 24 Jan 1996 155,100 ha Pre Explore: 23 May 2001 73,120 ha Semi Detail: 1 Aug 2005 23,646 ha FS: 19 Jan 07 AMDAL: 7 Mar 07 23,646 ha 21 Jan 2008 23,646 ha 30 Sep 2009 12 November 2012 Corporate Journey 10 2008 2009 Target PKN Construction Permit Exploration based on SNI Commence Production on 9 th Sept 2009 First Shipment on December 2009 Continue production and sales Develop Sekayan area COAL DEPOSITS 11 In Kelubir Area, seam B is the major seam with the average coal thickness of 5.56 m The average overburden thickness of seam B is 26.39 m Bulungan Kelubir Geology Data 12 November 2012 BULUNGAN KELUBIR CROSS SECTION SANDSTONE MUDSTONE COAL 12 Coal Reserves 13 12 November 2012 Mining Companies Permit Area (ha) Total Resources (tonnes) Total Reserves (tonnes) PT. Pesona Khatulistiwa Nusantara (PKN) - SNI PKP2B 23,646 277 mio 119 mio PKP2B: Perjanjian Karya Pengusahaan Pertambangan batubara (Coal Contract Of Work Agreement) Typical Coal Quality 14 12 November 2012 BULUNGAN PARAMETER PKN Average Thickness Seam1 (m) 5.28 Relativity Density 1.35 Total Moisture (% gar) 43.00 Inherent Moisture (% adb) 14.00 Ash (% adb) 3.51 Volatile matter (% adb) 42.40 Fixed Carbon* (% adb) 40.09 Total Sulphur (% adb) 0.13 Calorific Value (kcal/kg gar) 3,487 Calorific Value** (kcal/kg adb) 5,261 * Fixed Carbon by difference ** CV adb determined on stated IM STRATEGIC PLANNING 15 12 November 2012 Infrastructure Planning 16 COAL AUTHORIZATION East Kalimantan Crusher Barge Loading Hauling 18km Top Soil Removal Drilling & Blasting Coal Upgrading ROM Coal Coal Diversification Planning 119 Million Tonnes 17 12 November 2012 The Coal Upgrading will provide a higher heating value by reducing high moisture by using drying method and physical stabilization of the dried product. Coal Upgrading method gives some advantages: 1. Can be applied to most coals. 2. Reduce effective transportation cost. 12 November 2012 Coal Upgrading 18 Initial Life of Mine permit is 30 years The maximum production will be 4 mtpa starting from year 2013 Bulungan mining operation was commenced in September 2009 in Kelubir Area In year 2011 Sekayan Area will start production Production Plan 12 November 2012 Production 2009 2010 2011 2012 2013 2014 2015 2016 2017 2021 BULUNGAN Production (mtpa) 0.2* 0.7* 1.5 2.5 4.0 4.0 4.0 4.0 4.0 4.0 19 * Actual Production 3 Years Strategy 2009 2010 2011 12 November 2012 20 Production continue Construction Production start Kelubir Sekayan Mangku padi Infill Drilling FS & AMDAL Construction Production begin Infill Drilling FS & AMDAL PKN with 227 million Tonnes Resources and 119 million Tonnes Reserves is great asset for Bulungan Regency. The Coal Quality is Low Rank Coal with Low Sulphur and Low Ash Content. The market has accepted the Coal as the blending coal with High Rank Coal with High Sulphur content. The production was started in Bulungan Kelubir Mine Operation in September 2009 and first shipment has completed in 21 st December 2009. Sekayan Mine Operation will be developed and started in year 2011. Coal Upgrading study is in progress. Summary 12 November 2012 21 SHARE HOLDERS Majority Shareholders Formerly, Mr. Rachmat served as : - President Director of PT. Astra International, Tbk (1984-June 1998 & February 2000 to July 2002) - Commissioner of PT. Bank Universal Tbk (19952001) - President Director of PT. United Tractors Tbk (19791983) Formerly, Mr. Subianto served as : - Vice President Director of PT. Astra International Tbk (1990 1998) - President Director of PT. Astra Agro Lestari Tbk (19891999) - President Director of PT. United Tractors Tbk (1984-1997). 12 November 2012 23 Benny Subianto Theodore P. Rachmat 12 November 2012 Business Sectors 24 SECTORS COMPANY RESERVE / MARKET REVENUE Coal Mining Concessions PT Adaro Energy 406 mio tonnes 35 mio tonnes/annum USD 1,26 Billion PT Padang Karunia Group 255 mio tonnes USD 73 mio PT Bhakti Energi Persada 5,620 mio tonnes Infrastructure development PT Pesona Khatulistiwa Nusantara 119 mio tonnes In production phase Coal Transportation PT Indonesia Bulk Terminal PT Adaro Indonesia USD 37 mio Coal Mining Contractor PT Saptaindra Sejati Berau, Adaro, Interex mine site USD 100 mio Coal Based Power Plant PT Makmur Sejahtera Wisesa Adaro mine site Infrastructure Development 12 November 2012 Business Sectors 25 SECTORS COMPANY PRODUCTION / MARKET REVENUE Agro industry (Rubber & Palm Oil Plantation) PT Agro Multi Persada PT Brahma Binabakti (Rubber) PT Kirana Sekernan (CPO) 3,000 ha (BB) 10,000 ha (KS) USD 23 mio PT Triputra Agro Persada PT Gawi Bahandep SM (CPO) PT Muaratoyu SL (CPO) 50 k ha landbank 5 k ha to be planted nil PT Swakarsa Sinarsentosa 20 k ha USD 14.2 mio Crumb Rubber PT Kirana Megatara Goodyear 52 % Bridgestone 16 % Marubeni 10 % Yokohama 4 % Alliancetire 3 % Rubber net 2 % Hankook tire 2 % R1 Int 2 % Michelin 1.4 % 355,199 tonnes USD 446.4 mio Timber PT Dharma Satya Nusantara Bare core, block board, door, wood floor USD 52.5 mio 12 November 2012 Business Sectors 26 SECTORS COMPANY RESERVE / MARKET REVENUE Manufacturing Pako Group (Alloy Wheel) Domestic & Export OEM USD 68 mio Dharma Polimetal (Automotive Components & Wheelchair) Honda, Invacare (EU), Everest Jennings (US) USD 102 mio Lemindo (Woodworking Adhesive) USD 17 mio Consumer Daya Group (Motorcycle Dealer & Retailer) West Java, Sumatra, Kalimantan, Sulawesi USD 560 mio Bima Busana Internusa (Garment Manufacturing) Domestic, Japan, UK USD 18 mio Motora (Used Motorcycle Retailer) Java & Bali Area USD 14 mio Trading Multico Pte. Ltd. Singapore (Heavy Equipments & Parts) South East Asia SGD 79 mio Financial Parasahabat Group (Microbanks for SMEs) Java USD 9 mio Logistics PT Adira Rental (Automotive Rental Service) Indonesia USD 9 mio THANK YOU PT PESONA KHATULISTIWA NUSANTARA Graha Irama 6 th Floor Suite A-B Jl. HR Rasuna Said Block X-1, Kav. 1-2 Jakarta 12950 Indonesia Tel : +62 21 527 8012 / 13 Fax: +62 21 527 9220