Seminar II: Advanced Construction Mechanization Techniques in
High Rise structures and their cost analysis
VIVEK INDORA-SPA/BEM/595 Page 1
1.1 INTRODUCTION Indian construction industry is more labor intensive as compared to other developed countries. It is among the largest sectors that generates employment within the country. Overruns in the construction are indicators of productivity problems. Most of the projects experience cost overruns due to labor productivity problems. Looking to the current scenario of continuous downfall of construction problem, this study mainly aims at analyzing the causes of cost overruns due to low labor productivity at construction site, find correlation between these factors & develop a predictive model that will determine the impact of these factors on cost overruns on construction sites.
1.2 NEED OF THE PROJECT To have a knowledge base of the latest equipments availability in the modern construction industry To improve productivity in the construction industry Proper maintenance of construction equipment. Cost analysis of different construction activity is necessary for knowing the impact and benefits of mechanisation in the constrction
1.3 AIM To study about the latest equipment used in High Rise Structures and analysis of the cost of indentified equipment with respect their productivity and time required. 1.4 SCOPE Classification of the equipments. Equipments procurement planning Availability of equipment and manufactures Economics of construction equipment. Security of equipment. Seminar II: Advanced Construction Mechanization Techniques in High Rise structures and their cost analysis
VIVEK INDORA-SPA/BEM/595 Page 2
Planning and selection of construction equipment. Cost analysis for conventional and mechanised construction.