Seminar II: Advanced Construction Mechanization Techniques in

High Rise structures and their cost analysis



VIVEK INDORA-SPA/BEM/595 Page 1

1.1 INTRODUCTION
Indian construction industry is more labor intensive as compared to other
developed countries. It is among the largest sectors that generates employment within
the country. Overruns in the construction are indicators of productivity problems.
Most of the projects experience cost overruns due to labor productivity problems.
Looking to the current scenario of continuous downfall of construction
problem, this study mainly aims at analyzing the causes of cost overruns due to low
labor productivity at construction site, find correlation between these factors &
develop a predictive model that will determine the impact of these factors on cost
overruns on construction sites.


1.2 NEED OF THE PROJECT
To have a knowledge base of the latest equipments availability in the
modern construction industry
To improve productivity in the construction industry
Proper maintenance of construction equipment.
Cost analysis of different construction activity is necessary for
knowing the impact and benefits of mechanisation in the constrction

1.3 AIM
To study about the latest equipment used in High Rise Structures and analysis
of the cost of indentified equipment with respect their productivity and time
required.
1.4 SCOPE
Classification of the equipments.
Equipments procurement planning
Availability of equipment and manufactures
Economics of construction equipment.
Security of equipment.
Seminar II: Advanced Construction Mechanization Techniques in
High Rise structures and their cost analysis

VIVEK INDORA-SPA/BEM/595 Page 2

Planning and selection of construction equipment.
Cost analysis for conventional and mechanised construction.

1.5 METHODOLOGY

Phase-1 [literature review]
Phase-2 [preparing knowledge Base]
Phase-3 [Methodology for selection]
Phase-4 [Cost Analysis - Mechanisation]