You are on page 1of 22

Advanced Supply Chain Planning

Agenda
Module Objective

Memory Based Planning (MBP) Overview

Ilog Technologies

Supply Chain Optimizer

High Level Scheduler

Memory Based Planner (MBP)

Memory Based Planner Database Maintenance

Simulation Planning
Copyright Oracle Corporation, 2000. All rights reserved.
Memory Based Planner
Oracle Applications 10.7 / 11.x / 11i
Application Data Repository
Staging Tables
APS Snapshots
APS Views
Application Data Repository
APS Snapshots
APS Views
Key Transformation
Operational Data Store Planning Data Store
Advanced Planning and Scheduling
$APPLCSF/out/ASCII Flat Files
Advanced Supply Chain Planning
Oracle Applications 10.7 / 11.x / 11i
Supply Chain Optimizer High Level Scheduler
Planners Work Bench
ASCII Flat Files
Simulation
Planning
Collection Work Bench
Global Available
to Promise
Global Available
to Promise
Planners Work
Bench updates
ASCP Processing
Planning Snapshot:
ODS and/or PDS writes to ASCII flat files. The practice of deleting these ASCII flat files is
rather common to save space. Please note that if these files are not present for a specific plan,
simulation re-plans are not possible. The MBP would have to be launched again and new
ASCII flat files would have to be created.

The process uses $APPLCSF, if set. If $APPLCSF is not set, $MSC_TOP/out is used.
They can be identified by their extensions of .ctl, .dis, .dat and .bad.

MBP Performs loop checking/ low level code computations while MBP loads data from flat
files
Memory Based Planner:
Load Flat files to MBP trees.
MBP is invoked to prepare data for SCO
Invoke SCO
Invoke MBP for netting purposes
Invoke HLS
Write output to ascii flat files
Load data to PDS, possibly consuming a partition
If the profile option Direct Load is set to yes, all SQL*Loader issues apply.
Oracl e Advanced Suppl y Chai n Pl anni ng Engi ne
Oracl e Memory Based Pl anner (MBP)
Ilog Hi gh Level Schedul er (HLS) Il og Suppl y Chai n Opt i mi zer (SCO)
Advanced Supply Chain Planner (ASCP)
There are three components to the Advanced Supply Chain Planning Engine (ASCP). These
three components share a common data model and are linked together in a single executable
named MSONEW. Data conversion during processing does not need to occur, thus
performance of the ASCP plan is not affected when data is transferred between Ilog modules
and Oracle's Memory Based Planner (MBP).
The three modules perform specific functions critical in producing an MRP plan that can be
produced within the manufacturing organization. Virtually every plan will have exceptions.
From the inability to secure raw materials to resource shortages. ASCP recognizes these
shortcomings and produces resource and material constrained plans that are optimized to meet
business objectives while alerting the user to exceptions that exist while producing to the plan.
Plans may also be optimized to meet business objectives such as On Time Delivery.
ASCP Components:
SCO - suggest planned orders after considering all constraints
MBP - netting and planned order placement
HLS - allocation and optimization of resource usage
Advanced Supply Chain Planning (ASCP) operates in three modes; Unconstrained,
Constrained, Optimized.
An unconstrained plan offers the ability to execute ASCP without respect to material or
capacity constraints. The MBP will assume infinite capacity and infinite supply. This is the
logic offered previous to 11i.

A constraint-based scheduling engine will ensure the plan is feasible and respects all of given
material or resource constraints. A constrained plan respects the realistic limitations of the
defined supply chain. Every entity in the supply chain, that is defined, will be exploited to
the extent that it offers resources or materials required to meet the given demand. Materials
and resources limit the maximum production output of the manufacturing plant. Alternate
suppliers, resources and substitute components offer greater flexibility when key production
participants are taxed beyond ability or availability.

An optimized plan manipulates and delivers ASCP output that best matches the stated plan
objectives. Objectives include maximum inventory turns, maximize on time delivery,
minimize inventory costs, and maximize overall plan profit. ASCP simultaneously plans
material and capacity while considering the weighted objectives of optimization settings.
Constraints must be used if optimization if desired. If the plan is setup to maximize on time
delivery, the ASCP engine will not violate available resources or stated supply to meet on
time deliveries. Exception messages relating to late delivery are still likely given the available
materials and resources.
ASCP creates infinite, constrained and/or optimized MRP plans that are coordinated for each
organization defined in the plan.
ILOG
Only Ilog supports multiple, complementary optimization technologies covering the entire breadth
of industry problems, from high-level planning to tactical operations. Based in France, Ilog has
excelled at delivering programmatic solutions that resolve complex problems. Additional
information concerning Ilog may be obtained at www.ilog.com.
Memory Based Planner - MSONEW
Oracle Advanced Supply Chain Planning Engine
Oracle Memory Based Planner (MBP)
Ilog High Level Scheduler (HLS) Ilog Supply Chain Optimizer (SCO)
Third Generation of Material Requirements Planning in memory. What does Memory Based
actually mean? The three executables, SCO, MBP, HLS make a unique executable, sharing the
same memory.
The advantages are:
All executables and data are in memory, so critical I/o bottlenecks are avoided
We use the existing MBP data model thus reducing the possibilities of new bugs
Process lifecycle is shortened
ILOG CPLEX Supply Chain Optimizer - MSONEW
Oracle Advanced Supply Chain Planning Engine
Oracle Memory Based Planner (MBP)
Ilog High Level Scheduler (HLS
Ilog Supply Chain Optimizer (SCO)
C library used in solving large-scale optimization problems in the area of planning and resource
allocation.

Cplex uses techniques from linear programming and mixed integer programming.

Constraint programming uses information contained in the problem to prune the search space,
in order to more rapidly identify feasible solutions. It is ideally suited for operational problems,
which require fast, feasible answers. An MRP plan is good example of this. Given stated
demand, constrained time, limited materials and resources, what is the proper order of
manufacturing and what is the most efficient use of resources.

It is important to note that as you adjust Penalty Factors or Plan Objectives, the volume of
exception messages created will fluctuate.
Resources considered in the problem area include:
Transportation
Supplier Capacity
Material On Hand
Available Resources
Supply Chain Optimizer (SCO) Overview
T
im
e
T
o

M
R
P
:
C
u
t
o
f
f

M
o
n
t
h
s
Available Resources
D
e
m
a
n
d
-
S
u
p
p
l
y
Given Constraints
Given Constraints
x
x
x
x
Optimized, best fit plan
honed to user settings
Possible plans produced
during SCO passes
The SCO makes several passes at the planning problem eventually making the determination
that further analysis would provide diminished results. As indicated in the diagram above, X
represents attempts at problem resolution by the SCO.
Oracle ASCP solves the problem of planning the production of ordered products, given finite
capacity while considering practical industrial constraints.

Given an amount of TIME, as indicated by the setting of the MRP:Cutoff Months profile
option.
Allocated with available RESOURCES as made available from the source Application Data
Store (ADS) instances.

Assigned a number of TASKS contained within demand, supply, netting, etc.

Oracle ASCP stops the processing of SCO when the results produced are within an
acceptable tolerance range when compared to a best previous plan in the current session. The
ASCP engine must take over at some point otherwise the SCO engine would execute until the
results were as near perfection as possible.
High Level Scheduler - MSONEW
Oracle Advanced Supply Chain Planning Engine
Oracle Memory Based Planner (MBP)
Ilog High Level Scheduler (HLS)
Ilog Supply Chain Optimizer (SCO)
ILOG solver and optimization technology optimizes plans to strategic objectives. Incorporated
with third-generation memory based planning, the High Level Scheduler (HLS) produces
optimal resource usage decisions aiding in the delivery of production and distribution plans for
each organization's resources.
The ILOG Solver or High Level Scheduler is a C++ library for solving problems in planning,
allocation, and optimization exploiting constraint programming and object oriented
programming. The most efficient use of resources is an example of this type of problem. Given
a proposed schedule of resource utilization, fine tune and hone the resource usage by grouping
like activities, like products, comparing costs, demand dates and resource availability.
High Level Scheduler (HLS) Overview
Resource Utilization Before HLS
8am 12pm 9am 10am 11am 1pm 2pm 3pm 4pm 5pm
8am 12pm 9am 10am 11am 1pm 2pm 3pm 4pm 5pm
8am 12pm 9am 10am 11am 1pm 2pm 3pm 4pm 5pm
8am 12pm 9am 10am 11am 1pm 2pm 3pm 4pm 5pm
8am 12pm 9am 10am 11am 1pm 2pm 3pm 4pm 5pm
Day 1
Day 2
Day 3
Day 4
Day 5
Resource Utilization Before HLS
MBP produces planned orders with a start date that is indifferent to resource utilization
concerns. Planned order start dates can leave a resource schedule similar to the schedule
above. Above, the resource is insufficiently utilized as indicated by the gray shaded boxes.
The white boxes indicate times when the resource is not being scheduled to fulfill a planned
order.
High Level Scheduler (HLS) Overview
Resource Utilization After HLS
8am 12pm 9am 10am 11am 1pm 2pm 3pm 4pm 5pm
8am 12pm 9am 10am 11am 1pm 2pm 3pm 4pm 5pm
8am 12pm 9am 10am 11am 1pm 2pm 3pm 4pm 5pm
8am 12pm 9am 10am 11am 1pm 2pm 3pm 4pm 5pm
8am 12pm 9am 10am 11am 1pm 2pm 3pm 4pm 5pm
Day 1
Day 2
Day 3
Day 4
Day 5
8am
Resource Utilization After HLS
After the HLS finishes smoothing resource utilization, there may be resource downtime due to
supply chain lags, resource maintenance and user defined plan objectives and penalties. The
above graph indicates that HLS has utilized the resource to the best of its ability leaving few
times of resource utilization lags. The results of HLS processing will change the planned order
start date prior to the plan results being delivered to the end user.
HLS Data Files
If you are experiencing problems with the HLS, you may need the HLS data files. As data is
unloaded from the MBP, data files are prepared that are loaded into HLS. These data files can
be captured by executing the following commands:
It is highly recommended that an extraction of MBP data files be supplied to Development
before discussing MSONEW/HLS behavior or MSONEW/HLS errors.
Before proceeding, consider attempting the Advanced Supply Chain Planner -
Memory Based Planner after relinking the MSONEW executable:
Adrelink.sh should be at version 115.58 or higher. Apply patch
1497013 to bring adrelink,sh up to this version. This patch is included in AD-D
1627493 and above and in
11i.AU.C 1622303 and above.
The command to relink is as follows:
issue adrelink.sh force=y "mso MSONEW"
Extracting MBP and HLS debug and data files from the ASCP MSONEW
executables:
1) Determine the unix shell being used:
$ echo $SHELL
/bin/ksh
or
$ env | grep SHELL
SHELL=/bin/ksh
2) Depending upon the shell being used, set the FDWHOAMI variable:
ksh (korne shell) $ export FDWHOAMI=0,704,20454
sh (bourne shell) $ FDWHOAMI=0,704,20454
$ export FDWHOAMI
csh (cshell) setenv FDWHOAMI 0,704,20454
Verify that FDWHOAMI is set by: $ echo $FDWHOAMI
3) Make a directory that will hold the data files:
$ mkdir data under $MSC_TOP. Ensure that space and privileges are
adequate.
4) Attain the plan_id:
The plan id may be obtained either from the planner work bench by
using the drop down menu: Help/Diagnostics/Examine. Then look
for plan_id. Alternatively, execute the following query from sqlplus:
select plan_id
from msc_plans
where compile_designator='&plan_name';
5) $MSO_TOP/bin/MSONEW <dbuser/passwd@db> 0 Y -d <plan_id>
db is the database sid or instance
6) After the Memory Based Planner - MBP process completes, tar the files
in the $MSC_TOP/data directory.
- cd $MSC_TOP/data
- tar -cuf data.tar data
7) Upload the tar file and log files from the MBP process to Metalink.
* NT instructions will be available via Metalink.
Load all planning data from files into data structures in memory. (C - Function)
Run MBP and flush output data back to Memory. (C - Function)
if Supply Chain Optimizer Module is invoked:
(C++ - Function). Run SCO and Output results to the common C-data structures
Plan problem in memory and update data structures with output results. MBP massages data
before HLS is invoked
(C++ - Function). Run HLS and output results to the common C-data structures
Write data from Oracle Temporary Tables to ASCII Flat Files
Inside the Memory Based Planner
Loop checking is done in the snapshot as well as low level computations. Loop checking is
done for WIP, Sourcing and BOM. In Unix, raise your stack size if looping becomes and issue.
The processing flow of MSONEW is new to APS. With the introduction of ILOG libraries,
additional data manipulation must take place. As we pass supply/demand information to ILOG
and receive possible plans from ILOG, additional adjustments need to be made to the planned
orders, time fences and dates.

The three sequential modules, discussed above, make ASCP. These modules, combined
together, make a unique executable, sharing the same memory. This, in memory data model, is
the existing C MBP data model currently used in 10.7 and 11.x. The difference is that C++
data wrappers are added to the data to make it presentable to the ILOG modules.
The MBP is an Application Object Library (AOL) concurrent program called MSONEW.
MBP will cache data objects within your APS server memory. MBP performs netting and
flushes the results into ASCII flat files. Finally loading these changes into PDS
NOTE: MSONEW is launched when Constraints or Optimization is used or licensed.
MSCNEW is used when the constraint option is not chosen or installed.
Completion of ASCP When Using Plan Partitions
MSONEW
Completes
Processing
Planning
Marks
PDS
Partition as
Unusable
Unusable
PDS
Partition is
Truncated
ASCII Flat Files Swapped
into Unusable PDS Partition
Unusable
PDS
Partition is
Truncated
ASCII Flat files produced by the
MBP are deleted after being loaded
into the PDS.
While the data is swapped from the Oracle temporary tables into the PDS data store, the
active partition is marked as unusable while the swap occurs.

This leaves remaining plans, residing in their respective plan partitions, active and available to
users via the Planner's Workbench. However, this functionality will not allow for the
concurrent execution of multiple MBPs at the same time.

Once the data is swapped from memory into the correct plan partition, the partition is
marked as active, execution occurs as before MBP ran.

If the ASCP process fails during the truncation and swapping process, the local partition
indexes could be left marked as unusable. Please see the section regarding partitions to enable
the partition indexes.

If MSC:Share Plan Partitions is set to YES, the above functionality is not used. The MBP
will have to delete the MBP data from the prior successful MBP for the specific plan.
Copyright Oracle Corporation, 2000. All rights reserved.
Applied = no
and status = 0
This is done for each
data that is changed via
Planners Workbench
Load data into MBP afresh
Perform all necessary MBP/SCO/HLS data manipulations
Write ASCII flat files
Update PDS data store
Load Simulation Changes from PDS
Erase PDS ASCII Flat Files
Load ASCII flat files
from previous ASCP
execution
Simulation Planning
The five data groups that can be manipulated for simulation replan purposes are:
Supply, Demand, Supplier Capacity, Resource Requirements, Resource Availability
Simulation Change Detection
Simulation changes are changes affected by the user using the PWB. These changes are saved
by the PWB with applied = N, or 2, and status =0. These attributes are used to identify and load
these changes back into MBP. Data changed by the workbench is written into the PDS. SCO
and HLS may decide to plan for assemblies and/or components that have been affected by user
changes introduced via the Planners Workbench. For example, adding a new resource would
trigger additional replanning activities.
Simulation Planning
This SQL will reveal the rows in msc_demands that have been changed within the Planner's
Workbench while preparing to execute a simulation plan.
select SCHEDULE_DESIGNATOR_ID sch_desg,
PLAN_ID,
INVENTORY_ITEM_ID,
SR_INSTANCE_ID,
APPLIED
from msc_demands
where applied = 2;
The above select would extract data from the Planning Data Store (PDS).
MSC_FILES
The MSC_FILES table is used to store the list of files which are used in the generation of an
MPS, MRP or DRP plan. Data in this table is updated each time a plan is run. The
FILE_TYPE column contains predefined values that are used during a planning run. No
information is available concerning the file_type code meanings. The FILE_NAME column
contains the name of the data file generated during the last plan run.
This information may prove useful when saving data files for simulation planning purposes.
Based upon the compile_designator found within msc_plans, the query below joins the plan_id
of msc_plans to msc_files to retrieve the .dat files created during the planning run. These are the
data files that are required for simulation planning purposes.
select substr(file_name,1,50),
file_creation_date
from msc_files a, msc_plans b
where b.compile_designator = '&my_plan'
and a.plan_id = b.plan_id;
ASCP Performance
Performance problems are easy to detect, but the root cause is often difficult to diagnose. If
you believe the performance of ASCP unacceptably slow or if you've noticed a degradation of
performance over time, these general tips may improve your performance.
PCTFREE:
Make sure the database objects in the MSC schema have a PCTFREE of zero. Pctused
and Pctfree determine the usage of Oracle blocks for row storage. Pctfree instructs the
Oracle RDBMS to leave a percentage of the row length * Pctfree available for row
expansion. Pctused instructs the Oracle RDBMS to begin using the same Oracle block for
another row after row length * pctused is used. Pctused is not is important as pctfree.

Additionally, Storage clauses control the spread of data within Oracle blocks. At a number
of sites the major tuning act we have accomplished has been to improve the blocking factor
on an otherwise fixed I/O bound application. Improper blocking and a pctfree > 0 can
have a profound effect on performance.

When building your indexes consider setting the pctfree to zero. If the table(s) indexed are
not subject to growth, setting the pctfree may improve disk access. Set the pctfree to a
lower number if the table is expected to grow.

Since data rows within the PDS does not expand in size, instructing the Oracle RDBMS to
fill each row, leaving zero bytes free for row expansion, is a logical approach.
Analyze (Gather Schema Statistics)
11i uses the Cost Based Optimizer (CBO). Your init.ora should reflect this change. It is
recommended that you set this to CHOOSE or FIRST_ROWS. FIRST_ROWS simply
returns the first rows from a data set as extracted from the RDBMS by SQL. This tends to
give the appearance of improved performance, as the user does not have to wait for the
entire data set to be extracted before being presented with the set.

Analyze should be performed on a regular basis according to your resource usage.
Obviously a shop where ASCP is ran more often would require more frequent execution of
analyze. It is strongly recommended that you use the Oracle supplied utility for analyzing.
$MSC_TOP/sql/MSCSTAT.sql will analyze the MSC schema.

Alternatively, submit the concurrent program 'Gather Schema Statistics' for MSC.

Analyze each partition separately using the following:
-- Gather ASCP Table Partition Statistics --
-- --
-- It is recommended that this form of analyze be executed after every --
-- Complete refresh, after a partial refresh that has added or deleted --
-- significant amounts of data or after an MBP plan has been executed. --
-- This script should be executed from SQL*Plus if executing Gather --
-- Schema Statistics for ALL or MSC has not enhanced performance. --
PROMPT TABLE MSC_COMPONENT_SUBSTITUTES exec
fnd_stats.gather_table_stats('MSC','MSC_COMPONENT_SUBSTITUTES',granularity=>'A
LL');
PROMPT TABLE MSC_PLANS exec
fnd_stats.gather_table_stats('MSC','MSC_PLANS',granularity=>'ALL');
PROMPT TABLE MSC_PLAN_ORGANIZATIONS exec
fnd_stats.gather_table_stats('MSC','MSC_PLAN_ORGANIZATIONS',granularity=>'ALL');
PROMPT TABLE MSC_SYSTEM_ITEMS exec
fnd_stats.gather_table_stats('MSC','MSC_SYSTEM_ITEMS',granularity=>'ALL');
PROMPT TABLE MSC_BOMS exec
fnd_stats.gather_table_stats('MSC','MSC_BOMS',granularity=>'ALL');
PROMPT TABLE MSC_BOM_COMPONENTS exec
fnd_stats.gather_table_stats('MSC','MSC_BOM_COMPONENTS',granularity=>'ALL');
PROMPT TABLE MSC_DEMANDS exec
fnd_stats.gather_table_stats('MSC','MSC_DEMANDS',granularity=>'ALL');
PROMPT TABLE MSC_SUPPLIES exec
fnd_stats.gather_table_stats('MSC','MSC_SUPPLIES',granularity=>'ALL');
PROMPT TABLE MSC_EXCEPTION_DETAILS exec
fnd_stats.gather_table_stats('MSC','MSC_EXCEPTION_DETAILS',granularity=>'ALL');
PROMPT TABLE MSC_FULL_PEGGING exec
fnd_stats.gather_table_stats('MSC','MSC_FULL_PEGGING',granularity=>'ALL');
PROMPT TABLE MSC_ITEM_CATEGORIES exec
fnd_stats.gather_table_stats('MSC','MSC_ITEM_CATEGORIES',granularity=>'ALL');
PROMPT TABLE MSC_ITEM_EXCEPTIONS exec
fnd_stats.gather_table_stats('MSC','MSC_ITEM_EXCEPTIONS',granularity=>'ALL');
PROMPT TABLE MSC_NET_RESOURCE_AVAIL exec
fnd_stats.gather_table_stats('MSC','MSC_NET_RESOURCE_AVAIL',granularity=>'ALL');
PROMPT TABLE MSC_OPERATION_RESOURCES exec
fnd_stats.gather_table_stats('MSC','MSC_OPERATION_RESOURCES',granularity=>'ALL')
;
PROMPT TABLE MSC_OPERATION_RESOURCE_SEQS exec
fnd_stats.gather_table_stats('MSC','MSC_OPERATION_RESOURCE_SEQS',granularity=>'
ALL');
PROMPT TABLE MSC_RESOURCE_REQUIREMENTS exec
fnd_stats.gather_table_stats('MSC','MSC_RESOURCE_REQUIREMENTS',granularity=>'A
LL');
PROMPT TABLE MSC_ROUTINGS exec
fnd_stats.gather_table_stats('MSC','MSC_ROUTINGS',granularity=>'ALL');
PROMPT TABLE MSC_ROUTING_OPERATIONS exec
fnd_stats.gather_table_stats('MSC','MSC_ROUTING_OPERATIONS',granularity=>'ALL');
PROMPT TABLE MSC_SALES_ORDERS exec
fnd_stats.gather_table_stats('MSC','MSC_SALES_ORDERS',granularity=>'ALL');
PCTINCREASE
When implementing the ASCP and APS suite, account for the pct increase for each database
object and the default settings for the tablespace. Newly created database objects that lack a
storage clause inherit the storage clause default from the tablespace in which the database
object is created. For ASCP processing, Oracle recommends a pctincrease of 1. This will
avoid many of the database errors that are associated with a higher pctincrease. Use the
following SQL to determine pctincrease changes.
This script will identify database objects that require pctincrease adjustment.
select 'alter '||segment_type||' '||owner||'.'||segment_name||'
storage(pctincrease 0);'
from dba_segments
where pct_increase > 0
and (segment_type = 'TABLE'
or segment_type = 'INDEX')
and owner in (select oracle_username
from applsys.fnd_oracle_userid);
The second script is for the 11i MSC schema, i.e., MSC.
select 'alter '||segment_type||' '||owner||'.'||segment_name||'
storage(pctincrease 0);'
from dba_segments
where pct_increase > 0
and (segment_type = 'TABLE'
or segment_type = 'INDEX')
and owner = 'MSC';
ASCP and Memory
As ASCP utilizes memory, the process may experience a memory shortage. This program
identifies the max SWAP area (memory) limit. At the shell prompt type:
ulimt -a to identify Data swap area.
This is a Unix parameter, which correlates to the Maxdsize parameter. Compile this program,
CC -o <<file name >>, then execute the compiled file to find hardware memory limit. Verify
that apps is using the same max memory allocated. If not do the following:
Modify the $AD_TOP/bin/adrelink.sh file.
Under HP9000 settings is a variable called CPP_LDFLAGS.
Default is set to:
CPP_LDFLAGS='-Wl,-a,default,+s -L$(LIBHOME)'
Change it to:
CPP_LDFLAGS='-N -Wl,-a,default,+s -L$(LIBHOME)'
Then relink the library with the following command:
adrelink.sh force=Y ranlib=Y "mso MSONEW"
Then restart the plan and check the memory used by ASCP.
#include <stdlib.h>
main(int argc, char **argv)
{
size_m chunk;
char *pointer;
long allocated;
if (argc > 1)
chunk = (size_m) atoi(argv[1])*1024;
else
chunk = 1024;
for (allocated = 1; pointer = (char *)malloc(chunk); allocated++) ;
printf("alocated %d\n", allocated*chunk);
}
/* end of program */
MAXEXTENTS
This script will identify the database objects that require max extent adjustments. While we are
setting the maxextents to 4000, your operating system may allow for a higher setting. Of course,
after your first complete iterations of the data collection and execution of the Advanced Supply
Chain Planner, consider resizing the MSC schema according to your specific needs.
The first script is for the 11i applications schema, i.e., wip, mrp, inv, etc.
set lines 130
set pages 0
set feedback off
set heading off
set termout off
set verify off
spo max_extent.sql
select 'spo max_extent' from sys.dual;
select 'set echo on' from sys.dual;
select 'set term off' from sys.dual;
select 'alter '||segment_type||' '||owner||'.'||segment_name||' storage(maxextents 4000);'
from dba_segments
where max_extents < 51
and (segment_type='TABLE'
or segment_type='INDEX')
and owner in (select
oracle_username
from applsys.fnd_oracle_userid);
select 'set echo off' from sys.dual;
select 'spo off' from sys.dual;
spo off
The second script is for the 11i MSC schema, i.e., MSC.
select 'alter '||segment_type||' '||owner||'.'||segment_name||'
storage(maxextents 4000);'
from dba_segments
where max_extents < 51
and (segment_type = 'TABLE'
or segment_type = 'INDEX')
and owner = 'MSC';