You are on page 1of 1

GRC 10.

0

GRC:
Overview of SOX
Overview of SOD
Introduction to GRC 10.0
Difference between GRC 5.3 and GRC
10.0
Overview of different applications in
GRC 10.0
Introduction to different components
of GRC AC
Installation of GRC 10.0
Prerequisites of GRC 10.0 installation

Post Installation activities of GRC 10.0
Configuration settings of GRC 10.0
Access Control 10.0 Architecture
GRC 10.0 security and authorizations
Object level security
Authorization requirements
Access Control delivered role
Shared configuration settings
Configure the Integration framework
Configure shared access control
settings
Identify Business Configuration (BC)
sets
Access Risk Analysis (ARA)
Creating Rule set,
Creating Business Process
Creating Risk
Creating Function
Risk analysis at user level
Risk analysis at role level
Risk analysis at profile level
Mitigation process
Remediation process
Simulation
Creating Control Id
Assigning Control Id to Users
Assigning Control Id to Roles

Emergency Access Management (EAM)
Managing emergency access
Planning emergency access
Types of EAM users
Creating firefighter, firefighter ID, firefighter
controller and firefighter owner
Maintaining reason codes
Assigning firefighter controller and owner to FFID
Assigning FFID to FF
Checking FF logs
Business Role Management (BRM)
Configuring Business Role Management
Creating a role by BRM component
Business role definition- technical role
definition
Creating single role
Creating composite role
Creating Business role
Maintaining role owners/approvers
Assigning role owner to role
Access Request Management (ARM)
Provisioning configuration
Creating access request
Types of access request
Responding to access request
Designing end user personalization form
Comparison with CUP
MSMP Workflow and Business Rule Framework
MSMP Workflow Introduction
Configuring MSMP
Perform Automatic Workflow Customizing
The concept of BRF+ rule
Process ID
Initiator rule
Agent rule
Routing rule
Creating BRF + rule
Maintain multistage multipath (MSMP)
workflow
Standard process ids
Linking BRF+ rule to standard process id
Background jobs in GRC AC 10.0

You might also like