You are on page 1of 3

Project Document No.

A.F.E. No.
Client
Project Number
Plant / Area
Equipment Service
Equipment No.
1 DESCRIPTION
2 Specification: Roof type:
3 Service: Type of Bottom:
4 Code: Monogram:
5 DESIGN DATA APPURTENANCES
6 Pressure Design/Vacuum kPag Agitator:
7 Operating kPag Vent:
8 Test kPag Baffles:
9 Temperature Design C Draw off sump:
10 Operating C Jet Mixing:
11 MDMT C Flame Trap:
12 Design liquid level m Gas Blanketing:
13 Fluid Lifting Lugs:
14 Specific Gravity Painters trolley:
15 Vapour pressure Grounding Lugs:
16 Corrosion allowance - shell mm Ladders:
17 - roof mm Handrails:
18 - bottom mm Stairways:
Double Bottom: Snow / ice deflector:
19 Corrosive Constituents: Name Plate:
20 Diameter: m Heating Coil: Size (mm) Length (m)
21 Height (shell): m FOUNDATION DETAILS
22 Nominal Capacity: m
3
Overturning Moment @ Base kN.m
23 Working Capacity: m
3
Shear Force @ Base kN
24 PWHT: Anchor Bolt Allow. Stress kPa
25 X-Ray: Platform Load kN
26 Test Fluid: INSULATION
27 Filling/emptying rate: m
3
/h Material:
28 Wind: Thickness: mm
29 Earthquake design: MASS (Estimated) Empty kg
30 Max rainfall: mm/h Opp kg
31 Total snow accumulation: mm Test kg
32 MATERIAL OF CONSTRUCTION
33 Shell: Stiffeners:
34 Bottom: Internals - plate:
35 Roof: Internals - pipe:
36 Nozzles - plate: Insul. Support rings:
37 Nozzles - pipe: Clips., Misc. steel:
38 Flanges - forging: Bolts / studs - Internal:
39 Flanges - plate: Bolts / studs - External:
40 Nozzle reinforcement: Nuts - Internal:
41 Lining: Thk: mm Nuts - External:
42 Gaskets:
43 PAINTING REMARKS
44 Shell/roof Surface prep
45 Primer
46 Final
47 Bottom Surface prep
48 Primer
49 Final
50
Date Prepared Checked Approved
REVISION LOG
Rev. Description
MECHANICAL DATA SHEET
TANKS
Yes No
Yes
Yes
Yes
Yes
Yes
Yes
Yes No
No
No
No
No
No
No
No Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
Yes No
Yes No
Project Document No.
A.F.E. No.
Client
Project Number
Plant / Area
Equipment Service
Equipment No.
1
2
3
4
5
6
7
8 HHL
9 NLL
10
11
12
13 Caged Ladder
14
15
16
17 LLL
18
19
20
21
22 FIXED ROOF / FLAT BOTTOM TANK
23
24
25 Mark Size Rating Type Facing External proj. Internal proj.
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Radial load Fr
(kN) Circ. load Fc (kN)
Long. load Fl
(kN) Mt (kNm) Mc (kNm) Ml (kNm)
40
41
42
43
44
45
46
47
48
49
50
51
52
53
MECHANICAL DATA SHEET
TANKS
Designation / Service
NOZZLE LOADS (process nozzles only)
NOZZLE SCHEDULE
Project Document No.
Equipment Service
Datum
Remarks
Remarks
NOZZLE LOADS (process nozzles only)
NOZZLE SCHEDULE

You might also like