2. Parapet wall (facing Eusebio Unit A to Unit D faade) 3. Additional room at the locker room (canteen area) 4. Additional 3m for sidewalk (entrance gate) from 22m 25m 5. Additional storage (canteen area) 6. Dock leveler 7. Tiles for drivers lounge & storage 8. Ceiling for drivers lounge 9. Additional opening (extension unit A- GF & 2F) 10. Additional roll-up door CHANGES: 1. Doors of toilets (canteen area) center 2. Grand stair design DELAY: 1. Delivery of tiles (Unit A) 2. Pattern for tiles installation (Unit A)