DESIGN OF PILE CAP

(By Beam Analogy Method)


PC - 2C
GIVEN DATA:
f'c =
fy =
Pile Cap. =
Pile =
Column Size =
b=
h=
t=
d=
dia.=
edge distance =
PT =
Required no. of Piles=
Say

20.70
413.00
400
600.00
550.00
2400.00
1200.00
600.00
515.00
20
300.00
600.00
1.50
2.00

MPa
MPa
KN
mm
mm
mm
mm
mm
mm
mm
mm
KN

=
=
=
=
=
=
=
=
=
=
=
=

3002.18
59898.48
89.93
23.62
21.65
94.49
47.24
23.62
20.28
0.79
11.81
134.89

psi
psi
kips
in.
in.
in.
in.
in.
in.
in.
in.
kips

Ru=

560

KN

125.90 kips

Pu = #piles*Ru =

1120

KN

251.80 kips

=
=

11.81 in.
5.91 in.

67.45 kips

SOLUTION/ CALCULATION:

CRITICAL SECTION FOR FLEXURAL SHEAR


a=
300
mm
x=
150
mm
< d, OK
FACTORED SHEAR AT THIS LOCATION
Vu = PT/#piles(per row) =

300.00 KN

BEAM SHEAR CAPACITY:


Vc = (fc)bd/6 =
702.93 KN
Vu < Vc, Thickness Ok

Vc = 2 (fc)bd =
157.46 kips
Vu < Vc, Thickness Ok

PUNCHING SHEAR CAPACITY:


bo = 2 (col.size +d/2) =
807.50 mm.
Vc = (fc)bod / 3 =
536.08 KN
Vu < Vc, Thickness Ok

FACTORED MOMENT:
due to Pt:
due to Piles:

Mu =
Mu = Rux1 + Rux2 =
Mu = (wh20*Hw) * Hw/3 =
due to water pressure:
where Hw =
2.75
TOTAL MOMENT =

63.58 in.
Vc = 4 (fc)bod =
240.16 kips
Vu < Vc, Thickness Ok

231.00 Kn-m
-616.00 KN-m
54.40 KN-m
-330.60 KN-m

REINFORCEMENT DESIGN
rreqd = 0.0027
therefore: use r =

<

rmin =

0.0034

<

rmax=

0.0161

0.0034

As =

r*b*d

=
USE

13.34

AsT =

0.0018*h*t

=
USE

4.13

4189.83

mm2

pcs
14 20 mmf Main bars
=

1296.00

or s =
2

89.98

mm

use dia.=

pcs
5 20 mmf Transverse bars

or s =

mm
20

mm

290.89

mm