Professional Documents
Culture Documents
. ()
PTT Public Company Limited
(2002)
GFS Asia Pacific Co., Ltd.
Project Procedure Report
: Installation LNG (Liquefied Natural Gas :DDF)
system with LNG cylinder size 450 Kgs.
Project Procedure Report
: Engine Diesel 3 Models
1 Cummins NTA 855 M. 350 HP (25 Engine)
2 Cummins K19 420 HP (1 Engine)
3 Hino K13C 320 HP (1 Engine)
Gas Detector
THE END