You are on page 1of 20

(2002)

. ()
PTT Public Company Limited

(2002)


GFS Asia Pacific Co., Ltd.




Project Procedure Report
: Installation LNG (Liquefied Natural Gas :DDF)
system with LNG cylinder size 450 Kgs.




Project Procedure Report
: Engine Diesel 3 Models
1 Cummins NTA 855 M. 350 HP (25 Engine)
2 Cummins K19 420 HP (1 Engine)
3 Hino K13C 320 HP (1 Engine)

Bracket For LNG Cylinder

Station San Sabb Boat 1

Intake LNG and Return LNG

Supply Fuel LNG

Control Room (LNG)

36,000 Lites LNG TANK

Pressure Gauge and Tubing

Cylinder LNG Installation

Tubing SUS 1/4 Cylinder

Fitting Connector Tubing

Filling and Return LNG

Vent Tube SUS1/4

Gas Detector

Installation Air-Gas Mixer 6

Location Conversion Kit

Indigator LNG and Level Gauge LNG and Gas Controller

THE END

You might also like