Professional Documents
Culture Documents
Critical QA and QC Process Procedure in Pressur Vessel Fabrication Raden Ahmad Muhaimin Humaidi - 24 Pages
Critical QA and QC Process Procedure in Pressur Vessel Fabrication Raden Ahmad Muhaimin Humaidi - 24 Pages
1/2007)
(HURUF BESAR)
mengaku membenarkan tesis (PSM/Sarjana/Doktor Falsafah) ini disimpan di
Perpustakaan Universiti Teknikal Malaysia Melaka (UTeM) dengan syarat-syarat
kegunaan seperti berikut:
1. Tesis adalah hak milik Universiti Teknikal Malaysia Melaka .
2. Perpustakaan Universiti Teknikal Malaysia Melaka dibenarkan membuat salinan
untuk tujuan pengajian sahaja.
3. Perpustakaan dibenarkan membuat salinan tesis ini sebagai bahan pertukaran
antara institusi pengajian tinggi.
4. **Sila tandakan ()
SULIT
TERHAD
TIDAK TERHAD
Disahkan oleh:
(TANDATANGAN PENULIS)
(TANDATANGAN PENYELIA)
Alamat Tetap:
Cop Rasmi:
Tarikh: _______________________
Tarikh: _______________________
* Tesis dimaksudkan sebagai tesis bagi Ijazah Doktor Falsafah dan Sarjana secara penyelidikan, atau
disertasi bagi pengajian secara kerja kursus dan penyelidikan, atau Laporan Projek Sarjana Muda (PSM).
** Jika tesis ini SULIT atau TERHAD, sila lampirkan surat daripada pihak berkuasa/organisasi berkenaan
dengan menyatakan sekali sebab dan tempoh tesis ini perlu dikelaskan sebagai SULIT atau TERHAD.
DECLARATION
Signature
Authors Name
Date
MAY 2008
APPROVAL
This PSM submitted to the senate of UTeM and has been as partial fulfillment of the
requirements for the degree of Bachelor of Manufacturing Engineering (Manufacturing
Process). The member of the supervisory committee is:
ABSTRAK
Projek ini mendedahkan berkenaan kritikalnya jaminan kualiti (QA) dan kawalan kualiti
(QC) dalam kaedah dan proses bagi memastikan penghasilan pegandung tekanan yang
berkualiti. Kawalan kualiti amat penting dalam pembuatan pengadung tekanan ini
kerana tanpa pemeriksaan yang teliti ia boleh menyebabkan kegagalan pada pengandung
tekanan yang dihasilkan. Projek ini dijalankan dengan kerjasama Akra Engineering
Sdn.Bhd sebagai salah sebuah syarikat pengeluar kelengkapan minyak dan gas di
Malaysia. Projek ini menggunakan kod AMERICAN SOCIETY MECHANICAL
ENGINEERING (ASME) sebagai rujukan iaitu ASME BOILER dan PRESSURE VESSEL
CODE VIII. Proses jaminan kualiti dan kawalan kualiti ini terbahagi kepada enam
peringkat. Proses ini bermula dengan mengulaskan dokumen, kawalan bahan, proses
mereka, pemeriksaan dan ujian. Pemeriksaan yang dijalankan bermula dengan meneliti
dokumen dan kemudiannya memperbaiki setiap kesalahan dengan segera. Setiap
prosedur perlu diperiksa dibahagian ini bagi mengelakkan kesilapan dari berlaku.
Sebagai contoh, Inspection Test Plan (ITP), Welding Procedure Specification (WPS) dan
sebagainya. Peringkat seterusnya adalah kawalan material iaitu memastikan material
yang sampai daripada pembekal hendaklah selaras dengan tempahan pembelian dan
pensijilan bahan. Material yang sampai hendaklah mematuhi spesifikasi kod yang
ditetapkan. Pembuatan adalah bahagian yang perlu diberi penekanan kerana bahagian ini
memulakan proses penghasilan pengandung takanan. Setiap proses perlu diperiksa
dengan teliti bagi mengelakkan kegagalan dan kecacatan kimpalan. Peringkat
pemeriksaan dan ujian menerangkan bahawa setiap pengandung tekanan yang telah siap
akan diuji dengan Non-Destructive Examination (NDE) dan Hydrostatic Test.
i
ABSTRACT
This project was discussed about the critical Quality Assurance (QA) and Quality
Control (QC) in process and procedure to ensure that the manufacture of pressure vessel
that been produces were in high quality. Quality control (QC) is very important in order
to produces the pressure vessel, without the details test will lead the failure to the
pressure vessel. This project was collaboration with Akra Engineering Sdn.Bhd which is
part of oil and Gas Company in Malaysia. This project also used the AMERICAN
SOCIETY MECHANICAL ENGINEERING (ASME) code as reference which is
ASME BOILER and PRESSURE VESSEL CODE VIII. Quality assurance (QA) and
quality control (QC) process were divided into 6 parts. The first part is documentation
review, material control, fabrication process, inspection and testing. The inspections
were start with the documentary check followed by repairing the defect instantly. Each
procedure should be test to prevent the defect from occur. The procedure that should be
held was Inspection Test Plan (ITP) and Welding Procedure Specification (WPS). The
material receiving inspection was to ensure that the materials that deliver were same as
the purchase order and material certificate. All the material should obeyed the
specification code that already fixed. Fabrication part was the critical part that should be
highlight because this part was the beginning of pressure vessel construction. As were
mention above, all parts should been details check in order to prevent the defect and
failure especially to the welding. The inspection and test part explains that when the
pressure vessel is already done, it then was tested by Non-Destructive Examination
(NDE) and Hydrostatic Test.
ii
DEDICATION
My dearest parents,
Mr. Humaidi Asnawi and Mrs. Mahaya Abu
For your love, care and support.
My lecturers,
Mr. Sivarao A/L Subramonian, Dr. Thoguluva Raghvan Vijayaram
and Mr. Mohd Amri b. Sulaiman
Thank you very much for your continued support, guidance and kind assistance in
making sure the success of my project.
My friends in UTeM,
Especially to Affendi b. Husin @ Cholan and Nurul Nadia Baharum
For helping me whenever I am in difficulties.
iii
ACKNOWLEDGEMENTS
Praise is to ALLAH SWT, from whom I come and belong. This piece of work would not
become possible without the contributions from many people and organizations. Most
importantly, I would like to acknowledge my supervisor, Mr Sivarao A/L Subramonian
for his kind assistance, constructive criticisms and observations in this degree project. A
special thank you for my degree project examiner, Mr. Mohd Amri bin Sulaiman also to
Dr. Thoguluva Raghvan Vijayaram as my project panel. I also would like to express my
gratitude to Mr. Muhamed Zaihasren b. Muhamed Zainal, for his full contribution
regarding this project, the information, moral supports, guidance and the confidence in
me to finish this project with his company (AKRA Engineering Sdn. Bhd). Not to forget
all staffs in AKRA Engineering Sdn. Bhd for their kindly help in providing me useful
information and data where my heart will always remain. I would also like to thank my
project partner Affendi B. Husin@Cholan with his cooperation in this project. Last but
not least, special thanks to all people who involved in assisting me directly or indirectly,
in various ways to ensure my project succeeded and I am thankful to them.
iv
TABLE OF CONTENTS
Abstrak.i
Abstract...ii
Dedication..iii
Acknowledgement......iv
Table of Contents....v
List of Figures........ix
List of Tables........xii
List of Appendices...xiii
CHAPTER 1 .......................................................................................................................... 1
INTRODUCTION ................................................................................................................ 1
1.1
1.2
1.3
Objective .................................................................................................................. 2
1.4
Scope ........................................................................................................................ 3
1.5
CHAPTER 2 .......................................................................................................................... 4
LITERATURE REVIEW .................................................................................................... 4
2.1
Introduction .............................................................................................................. 4
2.2
2.3
2.4
2.5
2.6
2.6.1
2.6.2
2.6.3
91
2.6.4
2.6.5
2.6.6
2.7
2.8
Fabrication ............................................................................................................. 13
2.9
2.10
Material ........................................................................................................... 17
2.11.2
Code ................................................................................................................ 18
2.11.3
Failed .............................................................................................................. 20
2.11.4
TEST ............................................................................................................... 22
2.11.5
Safety .............................................................................................................. 25
2.11.6
Inspection........................................................................................................ 28
2.11.7
Welding .......................................................................................................... 32
CHAPTER 3 ........................................................................................................................ 37
3.1 INTRODUCTION ...................................................................................................... 37
3.2 Basic Process Methodology........................................................................................ 38
CHAPTER 4 ........................................................................................................................ 40
EXPERIMENTAL SET UP AND PROCEDURE ........................................................... 40
4.1 Introduction ................................................................................................................ 40
4.2
4.3
4.4
92
93
LIST OF FIGURES
Figure 4. 1: Fabrication Flow Chart in Quality Assurance and Quality Control process.... 41
Figure 4. 2: Checked the material arrive according mill certificate .................................... 43
Figure 4. 3: Checked the material condition........................................................................ 43
Figure 4. 4: Material dimensional checked ......................................................................... 44
Figure 4. 5: Checked material diameter............................................................................... 44
Figure 4. 6 : Marking and cutting process flow ................................................................... 45
Figure 4. 7: Marking for vessel size .................................................................................... 45
Figure 4. 8: Marking for vessel orientation ......................................................................... 46
Figure 4. 9: Punched the orientation to prevent from disappeared ...................................... 46
Figure 4. 11: Orientation checked at shell ........................................................................... 47
Figure 4. 12: Orientation checked at end cap ...................................................................... 48
Figure 4. 13: Checked the marking for nozzle opening ...................................................... 48
Figure 4. 14: Nozzle opening at shell .................................................................................. 49
Figure 4. 15: Nozzle opening at end cap ............................................................................. 49
Figure 4. 16: Beveling process ............................................................................................ 50
Figure 4. 17: End cap and shell fit-up using tackweld. ....................................................... 51
Figure 4. 18: Nozzle to flange fit-up ................................................................................... 51
Figure 4. 19: Fit-up check 1................................................................................................. 52
Figure 4. 20: Fit-up check 2................................................................................................. 52
Figure 4. 21: Prove that the fit-up have been checked ........................................................ 53
Figure 4. 22: Weld up process ............................................................................................. 54
94
Figure 5. 1: Welding seam 1 does not show any surface defect ........................................... 69
Figure 5. 2: Welding seam 2 does not show any surface defect ........................................... 69
Figure 5. 3: Welding seam 3 does not show any surface defect ........................................... 70
Figure 5. 4: Welding seam 4 does not show any surface defect ........................................... 70
Figure 5. 5: Welding seam 5 does not show any surface defect. .......................................... 71
Figure 5. 6: Welding seam 6 does not show any surface defect ........................................... 71
Figure 5. 7: Welding seam 7 does not show any surface defect ........................................... 72
Figure 5. 8: Welding seam 8 does not show any surface defect. .......................................... 72
Figure 5. 9: Nozzle 1 does not show any surface defect ...................................................... 73
95
Figure 5. 10: Nozzle 2 and nozzle 3 does not show any surface defect ............................... 73
Figure 5. 11: Nozzle 4 does not show any surface defect. ................................................... 74
Figure 5. 12: Nozzle 5 does not show any surface defect. ................................................... 74
Figure 5. 13: Waiting for the result ...................................................................................... 76
Figure 5. 14: Pressure gauge show the test pressure, 10 bars and no pressure drop ............ 76
Figure 5. 15: Discard the water from the drain nozzle after 60 minutes .............................. 77
Figure 5. 16: Pressure gauge decreasing after the water has been discarded ....................... 77
96
LIST OF TABLES
97
LIST OF APPENDICES
(Refer to APPENDIX)
98
CHAPTER 1
INTRODUCTION
1.1
Project Background
This project was to implement the Quality Assurance (QA) and Quality
Control (QC) process and procedures that associated with Pressure Vessel. A
pressure vessel was a closed, rigid container designed to hold gases or liquids at a
pressure different from the ambient pressure. The main intention of Quality
Assurance (QA) and Quality Control (QC) is to perform the systematic way of
specifying procedures involving each level of design, material, fabrication, testing
and inspection. Quality Assurance (QA) was define as a systematic set of activities
necessary to provide adequate confidence that requirements are properly established
and products or services conform to specified requirement. Quality Control (QC) was
defined as a process by which product quality was compared with applicable
standards, and the action taken when nonconformance is detected.
This collaboration project was held with the company that produces pressure
vessel commercially used. Akra Engineering Sdn. Bhd. was a very well known
company especially in services such as plant operation & maintenance services,
fabrication of storage tanks, industrial steel structures & minor offshore steel
structures, enhanced oil recovery system, including other related engineering
services.
1.2
Problem Statement
Pressure vessels used in refineries, chemical processing plants, and water
ii.
iii.
iv.
This report consists of the pressure vessel fabrication which as result through
documentation, fabrication and inspection related with quality assurance (QA) and
quality control (QC) operation. This investigation was carried out by using American
Society of Mechanical Engineers VIII (ASME VIII) code.
1.3
Objective
i.
ii.
iii.
1.4
Scope
ii.
iii.
1.5
Inspection and testing using Dye penetrate inspection and hydrostatic test.
Project summary
The expected output in this project is to have the information on process that
has been made. This information is to verify any problem that occurred on quality
assurance (QA) and quality control (QC) process related to pressure vessel
fabrication, so the precaution to avoid the crisis will be implementing. Quality
assurance (QA) will establish and evaluates the processes to produce the products
while quality control (QC) will verify if the product meets pre-defined standards.
CHAPTER 2
LITERATURE REVIEW
2.1
Introduction
In this chapter, the literature of material, code, failed, test, safety, inspection
2.2
Project Selection
This project was in collaboration with AKRA Engineering Sdn. Bhd. This
Title of this project was Critical Quality (QA) and Quality control (QC)
Process Procedure in Pressure Vessel Fabrication, where this project are made in
term of to implement quality assurance (QA) and quality control (QC) process in
manufacturing pressure vessel and also to fabricate an air receiver of pressure vessel
comply with American Society of Mechanical Engineers VIII (ASME) Boiler and
Pressure Vessel Code (Division 1).
.
2.3
Pressure Vessel
Pressure vessel was a rigid container designed to hold gases or liquids at a
pressure different from the ambient pressure. Type of pressure vessel are gas
cylinder, unified pressure vessels, boilers, valves, pipe work and some
miscellaneous.
2.4
Contract review
Execution Plan
Vendor
Documentation
Material Delivery
Fabrication
Project Closing
2.5
DESCRIPTION
Contract review
Client Kick
required
Meeting
if
Execution Plan
Vendor
Documentation
of
&
and
2.6
Material Delivery
Fabrication
Project Closing
The task of Quality Assurance (QA) and Quality Control (QC) process starts
from the part that has been highlight as above. Initially, all the documentation for the
project should be prepare such as Welding Procedure Specification (WPS),
Procedure Qualification Record (PQR) and Welder Performance Qualification
(WPQ), and also all the checklist and report for the project. This is the part of quality
assurance (QA).
When it goes down to fabrication part, Quality Control (QC) Inspector was
responsible to construct all the inspection and testing for example dimensional check,
fit-up, visual inspection and other. As the close out of the project, Manufacturers
Data Report (MDR) should be arranging. It is a compilation of all the documentation
for the project for instance drawing, welding procedure specification (WPS) and
design calculation.