You are on page 1of 1

M_I

4
M_I
6.3
M_I
9.7
M_I
16
M_I
13
M_I
14.4
M_I
AA.1
M_I
9
M_I
6
M_I
8
M_I
10
M_I
12
M_I
14
M_I
13.5
M_I
12.6
M_I
12.8
SSL =+27240 mmQND
SSL =+27065 mmQND
UC305x305x158
B
05001
SEE NOTE 13
PT275
SSL =+27065 mmQND
SSL =+27065 mmQND
SSL =+27240 mmQND
SSL =+27240 mmQND
U
B
305x102x25
U
B
305x102x25
U
B
305x102x25
B05024 B05023
B
05003
B
05004
B
05005
B
05006
B
05007
B
05008
B
05009
B05010 B05011 B05013
B
05014
B
05015
B
05016
B
05017
B
05018
B
05019
B05020 B05021
SUPPLY PIPE OPENING SCHEDULE:-
DRAINAGE PIPE OPENING SCHEDULE :-
SECTION A-A
Drawing No.
REV.
Drawing title
ORIGINAL SIZE
DATE APPROVED
CHECK
DRAFTING
SCALE
DRAWN
This Drawing must not be used for Construction unless signed as Approved
TiME Qatar
Thani Bin Abdulla Building
3rd Floor, Block 4, C Ring Road
UmGuwailina, P.O.Box 24360
Doha, Qatar
Fax: 00 974 4050699
Executive Architect Architect of Record
Project Manager
Client
Project Title
N
N
MECCA

SITE KEY PLAN


Main Contractor
CHECK
DESIGN
Carillion Qatar Building Company J V
PO Box 30024 Tel +974 44412689
Doha Qatar Fax +974 44412687
Sub Contractor
DOWNTOWN DOHA
P.O. Box : 9811 Doha, Qatar
This submittal has been reviewed for general compliance with the design intent of the
Contract Documents. Approval does not relieve the Contractor from errors and
omissions in the submittal. Contractor is responsible for all dimensions, quantities,
fabrication accuracies and coordination with other trades. Unless specifically approved
as such, submittal approval shall not be considered as approval for deviations or
substitutions from the Contract Documents.
By_______________________ Date_______________
GEIC Reviewer Initials
A. Approved
B. Approved as Noted
C. Revise and Resubmit
D. For Information
R. Rejected
Supervision Consultant
ETA Star Engineering &Contracting W.L.L
P. O. Box : 23773, Doha, Qatar
Tel. : +974 4466 6768
Fax : +974 4466 6798
Web: www.etamne.com
DRAWN CHKD DATE DESCRIPTION REV
COMPANY SIGNATURE DATE DEPARTMENT
ARCH.
STRUC.
MECH.
ELEC.
CIVIL
OTHERS
HHH
I01
I02
M_I
M01 BUILDING LEVEL 05
1:1 @ A0
CQB-ETA-CQ002-BWD-DRG-01005
PHASE 1B SUPER BLOCK M_I
00
NOTES:-
1:100
0 5000 10000
BUILDING M01 - LEVEL 05
STRUCTURAL BUILDERS WORK LAYOUT
A
B
M01 KEY PLAN
REFERENCE ARCHITECTURAL IFC DRAWINGS:
DESCRIPTION
REFERENCE MEP SHOP DRAWINGS :
DRAWING No. REV
DESCRIPTION DRAWING No. REV
REFERENCE STRUCTURAL IFC DRAWINGS :
DESCRIPTION DRAWING No. REV
REFERENCE MEP IFC DRAWINGS :
DRAWING No. REV
DESCRIPTION

You might also like