Location: Foxboro Park, Redhill Surrey Date: 29/07/2014
Video is placed at U:\Projects\14-001_14-050\14-026 DDA Lift CGGV - Redhill\Engineers\SHABZ
The video shows the existing beam in the suspended roof, which will hold trimmer beams of dimension 254 x 146 UB 43. This drawing has been issued out to Jason himself to pass onto the builder.
The meeting took place with Jason Whale of Elevators ltd, with his builder and contractor. This builder has previously installed similar lift types and will hence be used. Also present in the meeting was Mr Anil Sutaria Facilities manager of CGG.
Discussion was about the method of works involved in the construction of the lift shaft. The builder proposed methods of ensuring safety and cleanliness of task. He proposed this by saying there will be a curtain wall. Minor scaffolding will be put up to allow the access of the beam at roof level. A diamond saw will be used to cut through the slab.
Shows New Trimmer beams to support the lift installation