You are on page 1of 37

Risk Management

PRJR13011
01 Proyecto
Issued: 06/11/2013 7:53:46
The information in this document and any attachments is intended for users of Modulo Risk Manager,
a product developed by Modulo Security LLC. If you do not have permission to access this information, know
that it is prohibited to read, release, or copy this information. Improper use will be subject to the legislation in
effect based on the confidentiality agreements.
The controls in the knowledge bases created by Modulo Security LLC are protected by copyright and
ownership laws.
The full or partial unauthorized reproduction of the information in this report shall result in civil and
criminal punishments.
Risk Analysis Report
riskmanagersupport@modulo.com
The information in this document and any attachments is intended for users of
Modulo Risk Manager, a product developed by Modulo Security LLC. If you do not have
permission to access this information, know that it is prohibited to read, release, or copy
this information. Improper use will be subject to the legislation in effect based on the
confidentiality agreements.
The controls in the knowledge bases created by Modulo Security LLC are
protected by copyright and ownership laws.
The full or partial unauthorized reproduction of the information in this report
shall result in civil and criminal punishments.
ATTENTION
www.modulo.com
Modulo Security LCC
Copyright 2013 Modulo Solutions for GRC 2 of 37
PRJR13011
Risk Analysis Report
1. ANALYSIS SUMMARY
This report presents the results of the risk analysis carried out in the 01 Proyecto project. The
system used was Modulo Risk Manager, developed by Modulo Security LLC, which is based on the
exclusive GRC Metaframework methodology. The investigations included the organization's assets
and may have used a variety of methods for collecting evidence, such as: automated collectors,
documental analyses, interviews, facility inspections, and others.
Some of the main issues addressed in this report include: (i)What are the major threats to the
business? (ii) What are the risk levels of the non-implemented controls? (iii) What are the
recommendations for reducing these risks? (iv) How to prioritized the security measures to be
taken?
3 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
From a list of 329 controls investigated, 99 were considered applicable. From these applicable
controls, 62 controls were identified as implemented (Control Index
(1)
of 62,63%) and 37 controls
were considered non-implemented (Gap Index
(2)
of 37,37%).
Note that the higher the Control Index, the greater the number of controls in compliance with the
recommendations from the knowledge bases used in the analysis.
1.1 Gap Analysis (by Number of Controls)
Figure 1 - Number of Controls by Status
4 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
5 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
Considering the risk with a total PSR
(3)
of 14209, 4322 were considered applicable. From this total,
3024 may be considered controlled risks (implemented controls), which represents a Security
Index
(4)
of 69,97%. Similarly, a PSR of 1298 related to the non-implemented controls (identified
risks) represents a Risk Index
(5)
of 30,03%.
Note that the higher the Security Index, the lower the risk level in the assets analyzed.
1.2 Risk Analysis (by PSR)
Figure 2 - PSR Index by Status
IMPORTANT: When the Security Index is greater than the Control Index, it can be inferred that there is
greater effectiveness in the risk management process, since the implemented controls correspond to
those with higher risks (higher PSRs). Otherwise, it can be inferred that there is less effectiveness in the
risk management process, since most of the implemented controls correspond to the lower risks (with
lower PSRs). If the values are similar, it can be concluded that there is a homogenous distribution
between the level of risk and the priority given to the implemented controls.
(1)TheControl Indexiscalculatedbydividingthenumberofimplementedcontrolsbythenumberofapplicablecontrols.
(2)TheGapIndexiscalculatedbydividingthenumberofnon-implementedcontrolsbythenumberofapplicablecontrols.
(3)ThePSRrepresentsthedegreeofriskassociatedwiththeabsenceofacontrol,andiscalculatedbymultiplyingtheProbabilityxSeverityxRelevance.
(4)TheSecurity Indexiscalculatedbydividingthecontrolledrisks(PSR)bytheapplicablerisks.
(5)TheRiskIndexiscalculatedbydividingtheidentifiedrisks(PSR)bytheapplicablerisks.
6 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
7 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
30,03% of identified risks
RISK INDEX
69,97% of controlled risks
SECURITY INDEX
Figure 3 - Distribution of Risks (PSR) by Risk Level
The risks considered applicable in the analysis can be divided into:
1.3 Distribution of Risk (PSR) by Risk Level
8 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
1.4 Risk Levels of Non-Implemented Controls
Table 1 below shows the number and percentage for each risk level of the non-implemented
controls, for the quantitative and qualitative views of the analysis.
Total Very Low Low Medium High Very High View
Risk Levels
100% 0,00% 2,00% 53,00% 15,18% 29,82% %
1298 0 26 688 197 387 PSR Qualitative
100,00% 0,00% 5,41% 64,86% 13,51% 16,22% %
37 0 2 24 5 6 Controls Quantitative
Table 1 - Risk Levels of Non-Implemented Controls
As shown in the table above, it can be noted that 16,22% of the non-implemented controls represent
29,82% of the risks considered Very High to the organization.
9 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
1.5 Risks Identified in Assets (by PSR)
The 2 assets listed in the following table correspond to 100,00% of the total applicable risks. These
assets should be prioritized for treatment in order to reduce the risks identified.
Identified
PSR/Total
Applicable
Risk Index
Identified
PSR
Security
Index
Controlled
PSR
Applicable
PSR
Relevance Asset Type Asset
22,4% 27,5% 970 72,5% 2560 3530 Very High Tecnologa 01 Servidor Back End
7,6% 41,4% 328 58,6% 464 792 High Tecnologa 01 Firewall
Table 2 - Risk Identified in Assets (by PSR)
30,03% 30,03% 1298 69,97% 3024 4322 Consolidated (2)
10 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
Figure 4 - Risk Management
2. INTRODUCTION
Modulo Risk Manager is an information system that automates the risk management process for
technology, person, process, and environments assets. The GRC Metaframework methodology is
exclusive to Modulo Security LLC and complies with the guidelines outlined in the ISO/IEC 27001,
ISO/IEC 27002, ISO/IEC 27005, ISO 31000, and ISO Guide 73 standards.
The risk is calculated based on the PSR index (Probability, Severity, and Relevance), which is
based on an ample knowledge database that is constantly updated. For these reasons, the use of
Modulo Risk Manager provides increased productivity, control, and standardization of the
activities and assists organizations in achieving the desired results.
11 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
Risk = Probability x Severity x Relevance
The probability and severity factors are scored during technical analyses, whereas the relevance
factor is scored according to the importance of the asset to the organization when the asset is
created.
2.1 Calculating the PSR
This is the degree of importance the
asset holds to the organization, which
may take into consideration the business
components it supports.
This severity scores the level of impact
on the organization if the risk
materializes. This means that if the
incident occurs, the severity will score
the degree the performance, reliability,
or quality of the asset will be
compromised.
This is the probability that vulnerabilities
or weaknesses are exploited by one or
more threats due to the absence of
controls.
Relevance Severity Probability
Table 3 - Probability x Severity x Relevance
ISO Guide 73 states that risk is expressed as the value of the "combination of the probability of an
event and its consequences". Accordingly, Modulo Risk Manager considers the PSR index to
calculate the risk, which represents the estimate of these combined factors. These factors are
scored on a scale from 1 to 5. The PSR value then represents the degree of risk associated with
the absence of a control, and is calculated through the following formula:
12 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
PSR: Calculated by summing the PSR scores of the controls. The product of the P, S, and R factors
of each control is calculated and the results are then summed. The PSR can be consolidated by
asset, asset type, perimeter, control grouping, knowledge base, questionnaire, business
component, etc., and may vary between 0 and 100%.
Risk Index: Calculated by dividing the PSR of the non-implemented controls (identified risks) by
the PSR of the applicable controls. It's expressed as a percentage and may vary from 0 to 100%.
Security Index: Calculated by dividing the PSR of the implemented controls (avoided risk) by the
PSR of the applicable controls, thus complementing the Risk Index. It's also expressed as a
percentage and may vary from 0 to 100%.
Control Index: Calculated by dividing the number of implemented controls by the number of
applicable controls. It's expressed as a percentage and may vary from 0 to 100%.
Gap Index: Calculated by dividing the number of non-implemented controls by the number of
applicable controls, thus complementing the Control Index. It's also expressed as a percentage and
may vary from 0 to 100%.
2.2 Risk Indices
Awareness of the risks and their assessment is no longer a technical need. It has become a
strategy for organizations to meet the requirements set by the market, the government,
regulatory agencies, and others.
To provide a risk estimate, Modulo Risk Manager uses the following indices:
13 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
3. LIMITATIONS
These findings are based on questionnaires generated from knowledge bases in Modulo Risk
Manager. These results should be used as input, allow risks to be treated in the organization
according to the best risk management practices.
Those responsible for implementing controls should know that the technical recommendations in
the knowledge bases provided by Modulo Security LLC are valid for generic systems.
The controls in these knowledge bases should be evaluated in terms of their applicability and
impact before being implemented in a production environment. The characteristics of the system
under analysis should be taken into account, given that a change in the configuration or permission
parameters of the file system could damage the applications.
14 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
The context of the analysis is part of the risk management process and includes aspects both
internal and external to the organization. In Modulo Risk Manager, the context is represented
essentially by the scope of the project and the team involved. Some of the components selected
for the analysis bring along other associated elements that indirectly or directly become a part of
the context and which are useful for consolidating or filtering the results. These include: controls,
associated threats, business component with assets, and knowledge bases. Thus, the following
table can be derived.
4. CONTEXT
Name:
Status:
Author:
Leader:
Substitute
Leader:
01 Proyecto
usuario1
usuario1
Administrator
Code:
Project Created:
Analysis Start Date:
Analysis End Date:
Project Closed:
PRJR13011
06/04/2013
06/04/2013
Abierto
Iftheprojectisopenwhenthereportisissued,onlypartialresultswillbepresented.
15 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
4.1 Type of Assets Investigated
Tecnologa 4.1.1
Son los activos fsicos de conectividad (switch, router, hub, etc.), hardware de servidores (Risc,
Intel, etc.), estaciones de trabajo, dispositivos mviles y otros equipos (telfonos mviles,
PalmPilot, etc.). Tambin estn en este tipo cualquier software que est dentro de los servidores
o computadoras, puede que sean un sistema que gestiona banco de datos, servidores de web,
sistemas operativos y otras aplicaciones especficas.
16 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
4.2 Project Scope
The scope of the project - comprised of perimeters, assets, and knowledge bases - determines the
limits of the analysis during the project.
17 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
4.2.1 Perimeters Considered
Perimeters are physical or logical boundaries that are part of the organizational structure and
serve to organize the distribution of assets using any criteria that makes sense to the organization.
The following perimeters and the people responsible for them were included in the scope of the
project:
Responsible Parent Perimeter Perimeters
Administrator Banco_Grupo1
Table 4 - Perimeters Included in Project Scope
18 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
The relevance of each asset is specified, and represents the importance of the asset to the
organization's objectives. The following assets were included in the scope of the project, in
descending order of relevance:
4.2.2 Assets Considered
Relevance Asset Type Asset
High Tecnologa 01 Firewall
Very High Tecnologa 01 Servidor Back End
Table 5 - Assets Included in Project Scope
19 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
Threat sources are agents or components that alone or in combination have the potential to pose a
risk. Agents have the motivation, method, knowledge, and opportunity to threaten the
organization (intentional threats). Environmental or natural threats give rise to undesirable
conditions, such as mistakes, hazards, or disasters (accidental threats). The relevance of the
threat source is determined according to the hazard or level of concern that it represents to the
organization.
4.2.3 Threat Sources Considered
Threat Source Name
Table 6 - Threat Sources Considered in the Project
20 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
One or more knowledge bases were used for each asset selected in order to identify the risks. The
table below presents a consolidated overview of the knowledge bases used, in addition to the
respective controls and associated risks.
The "Controls Investigated" column contains the total number of applicable controls for each
knowledge base used.
4.2.4 Knowledge Bases Considered
Risk Index
Identified Risk
(PSR)
Applicable
Risk (PSR)
Controls
Investigated
No. of Times
Analyzed
Knowledge Base
28,1% 350 1245 61 1 Application - "Database" - Generic Database
41,4% 328 792 52 1 Application - "Firewall" - Generic Firewall
27,1% 620 2285 216 1
Operating System - "Microsoft" - Windows Server 2008
Family (Member Server)
30,0% 1298 4322 329 3 Total
Table 7 - Knowledge Bases Used
21 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
The team mobilized for the analysis was organized according to their positions and responsibilities:
4.2.5 Team Involved in the Analysis
Administrator Substitute the project leader when
necessary
Substitute
Leader
Management
Responsible Responsibilities Position Level
usuario1 Define the scope of analysis
Designate analysts
Monitor the analysis
Run queries and generate reports
Project Leader Management
usuario1 Answer questionnaires
Close, reopen, and perform other
operations related to the
questionnaires
Risk Analyst Execution
Table 8 - Team Involved in the Analysis
22 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
5. CONSOLIDATED ANALYSIS
Presenting risks under a variety of perspectives allows managers to decide where to act with the
highest priority. Thus, presented below are the consolidated results of the analysis from different
perspectives to assist the decision-making process when evaluating and treating risks.
Initially, the consolidated risks are presented for the main business components. Next, the risks
for each of the business components are presented and, finally, the risks by threat source, threat,
perimeter, asset type, asset, and risk level are presented.
NOTE: If there are unanswered controls, the analysis will show as being in progress with its status as "Open" and the
results for the identified risks will be considered partial. In addition, if the questionnaire is closed, unanswered
controls will become "Not Applicable".
23 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
The risks identified in the assets supporting the organization's business components were
consolidated into the two levels that categorize these components: the strategic level and the
tactical level.
5.1 Risks in Business Component Levels
24 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
Table 9 below presents the consolidated indices per strategic business component. It shows
absolute values and percentages of the controlled and identified risks for up to 10 components
with the highest Risk Index.
5.1.1 Strategic-Level Risks
Risk
Index
Security
Index
Identified
PSR
Controlled
PSR
Gap Index Control Index
Non-
Implemented
Controls
Implemented
Controls
Relevance
Business
Processs
Table 9 - Strategic-Level Risks
The value of the identified PSR for each strategic business component is composed of the sum of
the identified risks (PSR of the non-implemented controls) for all the assets that support it.
The Risk Index is calculated by dividing the value of the identified PSR by the value of the
applicable PSR, in each business component as well as for all the components.
This result should be used to prioritize measures in the assets that support the strategic business
components with the highest risks (see Figure 5).
Note that the business components are shown in descending order of Risk Index.
Figure 5 - Risk Index by Strategic Business Component
25 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
5.1.2 Tactical-Level Risks
Table 10 below presents the consolidated indices by tactical business component. It shows the
absolute values and percentages for up to 10 components with the highest Risk Index.
Risk
Index
Security
Index
Identified
PSR
Controlled
PSR
Gap Index Control Index
Non-Implemented
Controls
Implemented
Controls
Relevance
Organizational
Systems
30,03% 69,97% 1298 3024 37,37% 62,63% 37 62 Medium
01_PC_Banking_e
mpresas
Table 10 - Tactical-Level Risks
The value of the identified PSR for each tactical business component is comprised of the sum of
the identified PSR (PSR of the non-implemented controls) for all the assets that support it.
The Risk Index is calculated by dividing the value of the identified PSR by the value of the
applicable PSR, for each business component as well as all the components.
This result should be used to prioritize measures in the assets that support the tactical business
components with the highest risk (see Figure 6).
Figure 6 - Risk Index by Tactical Business Component
26 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
5.2 Risk by Business Component
For each business component, the total quantitative (number of controls) and qualitative (risks)
overviews of the results are presented, distributed over the five risk levels (which vary from Very
High to Very Low). Next, for each type of asset that supports the strategic business
component, the quantitative and qualitative overviews of the results are shown. This allows the
types of assets with the lowest level of adherence with the knowledge bases used and those with
the highest risks to be identified.
Copyright 2013 Modulo Solutions for GRC 27 of 37
PRJR13011
Risk Analysis Report
5.2.1. 01_PC_Banking_empresas
Table 11 below presents a total of 11 non-implemented controls in the Very High and High
levels, corresponding to 29,73% of the total risk identified for this business component.
100,00% 0,00% 2,00% 53,00% 15,18% 29,82% %
1298 0 26 688 197 387 PSR Qualitative
100,00% 0,00% 5,41% 64,86% 13,51% 16,22% %
37 0 2 24 5 6 Controls Quantitative
Total Very Low Low Medium High Very High Overview
Risks Levels
Table 11 - Risk Level of Non-Implemented Controls
28 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
5.3 Risk by Threat Source
Table 12 below presents the consolidated results by threat source. It shows the absolute values
and percentages for the controlled and identified risks for the 10 threat sources with the highest
Risk Index, presented in descending order of this index.
The identified risk (PSR) associated with each threat source is calculated by the sum of the PSR of
all the threats (potential incidents) related to the non-implemented controls whose threats are
associated with these sources. The Risk Index is calculated by dividing the value of the identified
PSR by the value of the applicable PSR for each threat source. The associations between the
threat sources and threats were determined in the system by the knowledge manager (or by the
role authorized to handle this task).
Risk Index
Identified
Risk (PSR)
Security
Index
Controlled
Risk (PSR)
Applicable
Risk (PSR)
Threat Sources
Table 12 - Risk by Threat Source
These results should be used to prioritize measures for the most critical business components and
assets, in terms of the risks arising from the main threat sources (see Figure 7).
Figure 7 - Risk by Threat Source
29 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
30 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
Table 13 below presents the consolidated results by threat. It shows the absolute values and
percentages of the controlled and identified risks for the 10 threats with the highest risk indices,
presented in descending order of this index.
The identified risk (identified PSR) associated with each threat (potential incident) is calculated
by summing the PSR of all the non-implemented controls associated with this threat. The Risk
Index is calculated by dividing the value of the identified PSR by the value of the applicable PSR
for each control associated with the threats.
5.4 Risk by Threat
Risk Index
Identified
Risk (PSR)
Security
Index
Controlled
Risk (PSR)
Applicable
Risk (PSR)
Threat
100,0% 40 0,0% 0 40 Repudiation
75,0% 216 25,0% 72 288 Drop in Performance
57,1% 40 42,9% 30 70 Non-Compliance with Regulations
53,0% 620 47,0% 549 1169 Loss of Traceability
27,7% 568 72,3% 1484 2052 Unavailability of Services or Information
13,2% 381 86,8% 2506 2887 Unauthorized Logical Access
13,1% 54 86,9% 359 413 Errors, Omissions, or Improper Use
0,6% 10 99,4% 1624 1634 Fraud or Sabotage
0,0% 0 0,0% 0 0 Administrative Sanctions
0,0% 0 100,0% 60 60 Copyright Infringement
Table 13 - Risk by Threat
These results should be used to prioritize the measures for the most critical business components
and assets, in terms of the risks arising from the main threats to the organization (see Figure 8).
Figure 8 - Risk by Threat
31 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
5.5 Risk by Perimeter
Table 14 below presents the consolidated results by the perimeters that contain assets included in
the scope of the project. It shows absolute values and percentages in the quantitative (number of
controls) and qualitative (risks) overviews, in addition to the risk composition percentages by
perimeter.
% of Existing
Risk
Risk Index
Identified Risk
(PSR)
Controlled Risk
(PSR)
Gap Index
Non-Implemented
Controls
Implemented
Controls
Perimeter
30,0% 30,0% 1298 3024 37,4% 37 62 Banco_Grupo1
Table 14 - Risk by Perimeter
The perimeters are sorted according to the organizational structure, and only those whose assets
were included in the scope of the analysis are shown.
The identified risk (identified PSR) in each perimeter is calculated by summing the PSR of all the
non-implemented controls analyzed in a perimeter's assets. The Risk Index is calculated by dividing
the value of the identified PSR by the value of the applicable PSR in each perimeter.
These results can be used to prioritize risk management measures in these perimeters and assets
with the highest risk indices, as well as to monitor the risk evolution in the organization.
32 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
5.6 Risk by Asset Type
Table 15 below presents the consolidated results by the type of asset included in the scope of the
analysis. It shows absolute values and percentages in the quantitative (number of controls) and
qualitative (risks) overviews, presented in descending order of Risk Index.
Risk Index
Identified Risk
(PSR)
Controlled
Risk (PSR)
Gap Index
Non-Implemented
Controls
Implemented
Controls
Number
of Assets
Asset Type
30,03% 1298 3024 37,37% 37 62 2 Tecnologa
30,03% 1298 3024 37,37% 37 62 2 Consolidated
Table 15 - Risk by Asset Type
A total of 37 non-implemented controls were found in the analysis for the assets included in the
scope.
The identified risk (identified PSR) in a certain type of asset is calculated by summing the PSR of
all the non-implemented controls analyzed in the assets of this type. The Risk Index is calculated
by dividing the value of the identified PSR by the value of the applicable PSR in each asset type
and in the total assets (shown on the last line on the table).
The relationship between the number of assets analyzed and the percentage of identified risk
shows which types of assets are at higher or lower risk. The Tecnologa asset type, representing
100,00% of the total assets investigated (2 out of 2) - accounts for 100,00% of the identified risk
(1298 out of 1298). These results can be used to prioritize the risk management measures in the
assets with the highest risk indices.
33 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
A total of 37 non-implemented controls were found in the analysis for the assets included in the
The identified risk (identified PSR) in a certain type of asset is calculated by summing the PSR of
all the non-implemented controls analyzed in the assets of this type. The Risk Index is calculated
by dividing the value of the identified PSR by the value of the applicable PSR in each asset type
34 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
5.7 Risk by Asset
Table 16 below presents the consolidated results for each asset included in the scope of the
project. It shows absolute values and percentages in the quantitative (number of controls) and
qualitative (risks) overviews, in descending order of Risk Index.
Risk Index
Identified Risk
(PSR)
Controlled Risks
(PSR)
Gap Index
Non-Implemented
Controls
Implemented
Controls
Asset Type Asset
27,48% 970 2560 35,37% 29 53
Tecnologa 01 Servidor Back
End
41,41% 328 464 47,06% 8 9
Tecnologa 01 Firewall
30,03% 1298 3024 47,06% 37 62 Consolidated
Table 16 - Risk by Asset
A total of 37 non-implemented controls were identified during the analysis, considering all the
assets analyzed in the scope of the project.
The assets with the highest Risk Index should be prioritized, though the other results presented in
this report that help determine additional criteria for prioritization should also be considered (see
Section 6 - Recommendations).
35 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
Table 17 below presents the distribution of the risk levels for each asset included in the scope of
the project, in descending order of identified risk (identified PSR).
The total applicable and applicable risk percentages are always calculated in relation to the total
applicable controls, both in the quantitative overview (number of non-implemented controls) and
qualitative (identified risk or PSR) overviews.
5.8 Risk Level by Asset
Applicable
Risk %
Identified Risk
(PSR)
Total
Applicable %
Very
Low
Low Medium High
Very
High
Asset Type Asset
22,44% 970 29,29% 0 1 22 3 3 Tecnologa 01 Servidor Back End
7,59% 328 8,08% 0 1 2 2 3 Tecnologa 01 Firewall
Table 17 - Risk Levels by Asset
30,03% 1298 37,4% 0 2 24 5 6 Consolidated
Assets with the highest percentage of applicable risk and a large number of Very High and
High controls should be prioritized in the risk management measures.
36 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report
6. RECOMMENDATIONS
The analysis identified the main asset risks in the assets included in the scope of the project, and
its results will assist the decision-making process to treat the situations that affect the
organizations objectives. The risk level and its respective interpretation for each possible value
are suggested in Table 18.
The results of the analysis provide important information for the next steps: evaluating and
treating the risks. Using Modulo Risk Manager to evaluate risks and monitor their treatment allows
for increased productivity and the use of additional tools, such as the What-If treatment simulator,
which allows results to be evaluated in different possible scenarios.
In addition, the evaluation and treatment phases are integrated with the analysis phase in Modulo
Risk Manager, allowing the results of the analysis to be used properly. Thus, when it is decided
that a certain risk will be sent for treatment, the system will allow treatment events to be
created which can be monitored and which allow for the evolution of the results found in the
analysis.
For the next steps, the evaluation phase of the system should be used and the following approach
should be adopted:
Identify the controls with Very High and High risk levels;
Evaluate possible impacts of implementing these controls on the assets, systems, and
business operations;
Send the controls with Very High and High risk levels for immediate treatment;
Identify the controls with Medium risk levels;
Evaluate the need to implement, in the short term, controls with Medium risk levels;
Identify the benefits of reducing the risks in the organization, based on the Risk Index;
In the evaluation phase, verify if the residual risks are satisfactory;
Evaluate the impacts of accepting the controls with lower risk levels;
Accept the risks for controls with lower risk indices;
If the residual risks are not satisfactory, continue the process for the controls with Low
and Very Low risk levels;
Close the project and constantly monitor the residual risk during the treatment processes.
1, 2, 3, 4, 5, 6
These are acceptable risks, and those responsible for the assets should be
informed of them.
Very Low
8, 9, 10, 12, 15, 16
These are risks which may be acceptable once reviewed and confirmed by
those responsible for the assets.
Low
18, 20, 24, 25, 27, 30
These are risks which may be acceptable once reviewed and confirmed by
those responsible for the assets, though their acceptance should be done
formally.
Medium
32, 36, 40, 45, 48, 50
These are unacceptable risks, and those responsible for the assets should at
least be oriented on how to control them.
High
60, 64, 75, 80, 100, 125
These are unacceptable risks, and those responsible for the assets should be
oriented on how to minimize them immediately.
Very High
PSR Values Definition Risk Level
Table 18 - Possible PSR Values
37 of 37 Copyright 2013 Modulo Solutions for GRC
PRJR13011
Risk Analysis Report