INTEGRITY TEST OF INLET/OUTLET VALVES OF EC 313 B/C/D 24/04/2007

Valve closed
valve opened
Spade
Valve body bleeder
Stabilised oil inlet
Stabilised oil outlet
cold oil outlet
cold oil inlet
A
B C
D
1 2
1
2
1
2
3
4
3
4
3
4
24/04/2007 JYD 246891289.xls.ms_office
INTEGRITY TEST OF INLET/OUTLET VALVES OF EC 313 B/C/D 24/04/2007
Valves 1st result initial P Means 2nd result
Hot inlet B1 ok 0.01 DP cell
Hot outlet B2 ok NA Bleeder
cold inlet B4 ok 0.01 DP cell
cold outlet B3 ok NA Bleeder
Valves 1st result initial P Means 2nd result
Hot inlet C1 ok 0 DP cell ok
Hot outlet C2 passing NA bleeder ok
cold inlet C4 ok 0 DP cell ok
cold outlet C3 passing NA bleeder Passing
Valves result initial P Means 2nd result
Hot inlet D1 ok 0.02 DP cell ok
Hot outlet D2 passing NA bleeder ok
cold inlet D4 ok 0 DP cell ok
cold outlet D3 ok NA bleeder ok
Notes. At Stabilised oil outlet side outlet, all valves are said "Tight " but we can expect water and oil trapped between valve and blind flange
(about 60 liters)
At cold inlet side . Draining was done with DP cell taping points ( top of pipe) and water and oil still present in the pipe .
At stabilised inlet side. Same conditions .but emptying is easily achievable to closed drain ( spades to remove)
C3 valve passing. To evaluate the passing rate of the valve by opening the elbow between the 2 isolation valves to closed drain.
Comments
EC 313 B
EC 313 C
EC 313 D
Comments
draining for 3/4 hour through bleeder untill only drops.
draining for 1/2 hour through bleeder untill only drops.
drained X3 onto closed drain, valve operated, leak through bleeder never stopped
Comments
24/04/2007 JYD 246891289.xls.ms_office
INTEGRITY TEST OF INLET/OUTLET VALVES OF EC 313 B/C/D 24/04/2007
24/04/2007 JYD 246891289.xls.ms_office