You are on page 1of 1

RIVER ROAD - RTE.

179
DYER AVENUE
Fueling Station
Salt Shed
DPWGARAGE
FIRE DEPARTMENT
POLICE STATION
EXISTING
80.00'
1
5
0
.0
0
'
5
0
.0
0
'
180.00'
9,000 SF - FIRST FLOOR
12,000 SF
EXISTING EASEM
ENT
PROPOSED SITE LAYOUT PLAN
1"=40 FT.
TOWN OF CANTON
FIRE DEPARTMENT & PUBLIC WORKS FACILITY
51 RIVER ROAD
PROPOSED SITE DESIGN LAYOUT
45 PROPOSED PARKING STALLS
27 EXISTING PARKING STALLS
PROPOSED
PROPOSED
Outside Material Storage
Future
Bay
WASH BAY
9,000 SF - SECOND FLOOR
Future
Bay
BUILDING AREA TABLE
FIRST FLOOR APPARATUS BAY = 4,000 SF
FIRST FLOOR OFFICE / ADMINISTRATION / STORAGE = 5,000 SF
SECOND FLOOR OFFICE / ADMINISTRATION / STORAGE = 9,000 SF
FIRST FLOOR PUBLIC WORKS GARAGE = 12,000 SF
TOTAL PROPOSED BUILDING AREA = 30,000 SF
PROPOSED FUTURE APPARATUS BAYS = 2,000 SF
40.00'

You might also like