You are on page 1of 5

AQUIDUCT @ Km. 8.

080ON LEFT CANAL


S.No
1

Description

No's

Length
mts

Breadth mts

Depth
mts

Remarks

PCC M10For Levelling course


U/S Abutment

1 x 1

5.500

2.800

0.100

1.54

D/S Abutment

1 x 1

5.500

2.800

0.100

1.54
3.08

Total
2

Qty
Total Qty
cum/kg cum/kg

3.08

PCC M15 For Foundation


U/S Abutment

1 x 1

5.300

2.600

0.410

D/S Abutment
Total

1 x 1

5.400

2.600

0.410

5.65
5.76
11.41

11.41

Page 1 of 5

AQUIDUCT @ Km. 8.080ON LEFT CANAL


S.
No

Description
U/S Abutment
D/S Abutment
U/S Wings
Returns
D/S Wings
Returns
Total

No's

Depth
mts

x
x
x
x
x
x

3.5
3.45
1.26
1.19
1.15
1.09

1
1
1
1
1
1

Length
Breadth mts
mts
EarthworkExcavation
1
5.520
2.900
1
5.520
2.900
2
3.900 (3.717+1.9)/2
2
3.950
1.900
2
3.900 (3.717+1.9)/2
2
3.950
1.900

Qty
Total Qty
cum/kg cum/kg
56.03
55.23
27.60
17.86
25.19
16.36
198.27

Remarks

198.27

1 PCC M10For Levelling course


U/S Abutment

1 x 1

5.520

2.800

0.100

1.55

D/S Abutment

1 x 1

5.520

2.800

0.100

1.55

U/S Wings

1 x 2

3.900 (3.717+1.9)/2

0.100

2.19

Returns

1 x 2

3.950

1.900

0.100

1.50

D/S Wings

1 x 2

3.900 (3.717+1.9)/2

0.100

2.19

Returns

1 x 2

3.950

0.100

1.50

1.900

10.47

Total

10.47

2 PCC M15 For Foundation


U/S Abutment
D/S Abutment
U/S Wings
Returns
D/S Wings
Returns
Total
3 PCC M15 For Substructure
U/S Abutment
D/S Abutment
U/S Abutment to Wings key
joining
D/S Abutment to Wings key
joining

1 x 1

5.320

2.600

0.450

6.22

1 x 1

5.320

2.600

0.450

6.24

1
1
1
1

4.000 (3.517+1.7)/2
3.750
1.900
4.000 (3.517+1.7)/2
3.750
1.900

0.450
0.450
0.450
0.450

9.39
8.80
9.39
8.80
48.86

x
x
x
x

2
2
2
2

1 x 1
1 x 1
1x

1x

4.720
4.720

(2.0+1.0)/2
(2.0+1.0)/2

2.265
2.261

16.04
16.01

(1.55+.4)/2

2.000

2.450

9.56

(1.55+.4)/2

2.000

2.450

9.56
51.15

48.86

51.15

Page 2 of 5

AQUIDUCT @ Km. 8.080ON LEFT CANAL


S.
No

Length
mts

No's

Description

Breadth mts

Depth
mts

Qty
Total Qty
cum/kg cum/kg

1 PCC M10For Levelling course


U/S Wings

1 x 2

3.900

(3.51+1.7)/2

0.100

2.03

Returns

1 x 2

3.950

1.700

0.100

1.34

D/S Wings

1 x 2

3.900

(3.51+1.7)/2

0.100

2.03

Returns

1 x 2

3.950

1.700

0.100

1.34

Total

6.75

6.75

9.36
5.74
9.36
5.74
30.20

30.2

2 PCC M15 For Foundation


U/S Wings
Returns
D/S Wings
Returns
Total
3 PCC M15 For Substructure
U/S Abutment
D/S Abutment
U/S Abutment to Wings key
joining
D/S Abutment to Wings key
joining

1
1
1
1

x
x
x
x

2
2
2
2

1 x 1
1 x 1
1x

1x

4.000
3.750
4.000
3.750

(3.5+1.7)/2
1.700
(3.5+1.7)/2
1.700

0.450
0.450
0.450
0.450

4.720
4.720

(2.0+1.0)/2
(2.0+1.0)/2

2.265
2.261

16.04
16.01

(1.55+.4)/2

2.000

2.200

8.58

(1.55+.4)/2

2.000

2.200

8.58
49.20

49.20

Page 3 of 5

AQUIDUCT @ Km. 8.080ON LEFT CANAL


S.
Description
No
1 Superstructure
RCC M20
Bed blocks

Deckslab
Troughwalls

Length
mts

No's

1x
1x

2
2

1 x 1
1 x 2
1 x 2

Breadth mts

Depth
mts

4.720
4.720

1.000
0.500

0.300
0.300

9.500
9.500
9.500

4.720
0.260
0.260

0.250
0.050
1.600

Total
Vcc M15
U/S Wingwalls upto CBL
Returns upto CBL
D/S Wingwalls upto CBL
Returns upto CBL
Total
Deduct(Bedblockportion)
Net total
U/S Wingwalls upto FSL
Returns upto FSL
D/S Wingwalls upto FSL
Returns upto FSL
U/S Wingwalls upto TBL
Returns upto TBL
D/S Wingwalls upto TBL
Returns upto TBL
Total
4 Wearingcoat in cc M 25
On Slabs
In between U/s&D/s wings
Total
5 Masticpad 12mm
In slabs
In trough walls
Total

((2.915+2.715
(4.3+4.5)/
)/2+(1.10+.89)
2
/2))/2
1 x 2
3.150
(1.1+.9)/2
(4.3+4.51) ((2.9+2.7)/2+(
1 x 2
/2 1.1+.89)/2))/2
1 x 2
3.150
(1.1+.9)/2
1 x 2

2 x 2

0.500

0.500

((2.7+0.5)/2+(
(4.5+4.9)/
0.89+0.5)/2))/
2
2
(3.15+1.35
1 x 2
(0.9+0.5)/2
)/2
((2.7+0.5)/2+(
(4.5+4.9)/
1 x 2
0.89+0.5)/2))/
2
2
(3.15+1.35
1 x 2
(0.9+0.5)/2
)/2
1 x 2

1
1
1
1

x
x
x
x

2
2
2
2

1 x 1
1 x 2

1 x
2 x

2
2

5.450
1.100
5.450
1.100

10.500
5.400

4.8
1.7

0.500
0.500
0.500
0.500

4.200
4.200

Qty
Total Qty
cum/kg cum/kg

2.83
1.42
4.28
11.21
0.25
7.90
8.15

0.660

11.06

0.660

4.16

0.660

11.02

0.660

4.16
30.40
0.55
29.85

0.550

4.28
11.21

8.15

1.209

12.81

1.209

3.81

1.200

12.71

1.200

3.78

0.500
0.500
0.500
0.500

2.73
0.55
2.73
0.55
69.50

69.50

1.76
3.40
5.17

5.17

2.40
2.04
4.44

4.44

0.040
0.075

0.25
0.3

Page 4 of 5

AQUIDUCT @ Km. 8.080ON LEFT CANAL


S.
Description
No
1 Superstructure
RCC M20
Bed blocks

Deckslab
Troughwalls

Length
mts

No's

1x
1x

2
2

1 x 1
1 x 2
1 x 2

Breadth mts

Depth
mts

4.720
4.720

1.000
0.500

0.300
0.300

9.500
9.500
9.500

4.720
0.260
0.260

0.250
0.050
1.600

Total
2 Vcc M15 Wings&Returns
U/S Wingwalls upto CBL
Returns upto CBL
D/S Wingwalls upto CBL
Returns upto CBL
Total
Deduct(Bedblockportion)
Net total
U/S Wingwalls upto FSL
Returns upto FSL
D/S Wingwalls upto FSL
Returns upto FSL
U/S Wingwalls upto TBL
Returns upto TBL
D/S Wingwalls upto TBL
Returns upto TBL
Total
4 Wearingcoat in cc M 25
On Slab
In between U/s&D/s wings
Total
5 Masticpad 12mm
In slabs
In trough walls
Total

((2.915+2.715
(4.3+4.5)/
)/2+(1.10+.89)
2
/2))/2
1 x 2
3.150
(1.1+.9)/2
(4.3+4.51) ((2.9+2.7)/2+(
1 x 2
/2 1.1+.89)/2))/2
1 x 2
3.150
(1.1+.9)/2
1 x 2

2 x 2

0.500

0.500

((2.7+0.5)/2+(
(4.5+4.9)/
0.89+0.5)/2))/
2
2
(3.15+1.35
1 x 2
(0.9+0.5)/2
)/2
((2.7+0.5)/2+(
(4.5+4.9)/
1 x 2
0.89+0.5)/2))/
2
2
(3.15+1.35
1 x 2
(0.9+0.5)/2
)/2
1 x 2

1
1
1
1

x
x
x
x

2
2
2
2

1 x 1
1 x 2

1 x
2 x

2
2

5.450
1.000
5.450
1.000

10.500
5.400

4.8
1.7

0.500
0.500
0.500
0.500

4.200
4.200

Qty
Total Qty
cum/kg cum/kg

2.83
1.42
4.28
11.21
0.25
7.90
8.15

0.600

10.06

0.600

3.78

0.600

10.02

0.600

3.78
27.64
0.50
27.14

0.500

4.28
11.21

8.15

1.150

12.18

1.150

3.62

1.150

12.18

1.150

3.62

0.500
0.500
0.500
0.500

2.73
0.50
2.73
0.50
65.19

65.19

1.76
3.40
5.17

5.17

2.40
2.04
4.44

4.44

0.040
0.075

0.25
0.3

Page 5 of 5