ABSTRACT
The purposes of this study were to investigate the factors that affected achievement in the
cost management for the tall building projects, and to seek the efficient guidelines of the cost
management for the tall building projects. This qualitative study used in-depth interviews with the six
project controllers from the six companies. The interpretation method was applied for data analysis
and the data were presented with the descriptive method.
The results of study showed that the project controllers had the highest level of opinions
toward the factors that affected achievement in the cost management on the following aspects: the cost
estimation, project planning, knowledge and ability of the administrators, resource utilization planning,
and cost controlling. The project controllers demonstrated the high level of opinion toward the factors
affecting achievement in the cost management on the following aspects: project designing, economy
of scale applying, project organization management, cost budgeting, and project environment.
The study indicated that the level of qualifications and capabilities for work of the project
controllers were trustworthy. The project controllers had sufficient ability and experience, moreover
they made suggestions thoroughly and clearly for each activity factor on the performance guidelines
and the cost controlling.
The study also revealed that the general status of the companies had the most effects on the
achievement in the cost management, such as the company organization. When there was a business
expansion, the companies needed for increasing personnel which led to the higher burden and cost of
the organization. However, if the organization had effective assessment of the regular personnel before
opening for new personnel or hiring the contractors, there would be more decrease in the capital
expenditure.
Keywords: cost management, construction project, tall building
.
/
1.
1.1
1.2
1.3
1.4
1.5
1.6
2.
2.1
2.2
2.3
2.4
3.
3.1
3.2
3.3
3.4
1
1
3
4
5
10
11
12
12
30
41
54
60
60
62
66
66
( )
4.
4.1
4.2
5.
5.1
5.2
5.3
5.4
68
68
69
103
103
124
137
144
145
147
148
200
2.1
2.2
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15 Work Breakdown Structure
4.16 Cost Breakdown Structure
4.17
4.18
4.19
4.20
4.21 Master Schedule Plan
4.22
4.23 Schedule Plan
4.24 Schedule Plan
53
59
69
71
72
73
73
74
74
75
75
76
76
77
77
78
79
79
80
80
81
81
82
82
83
83
( )
4.25
4.26
4.27
4.28
4.29
4.30
4.31
4.32
4.33
4.34
4.35
4.36
4.37
4.38
4.39
4.40
4.41
4.42
4.43
4.44
4.45
4.46
4.47
4.48
4.49
4.50
84
84
85
85
86
86
87
87
88
88
89
89
90
90
91
91
92
92
93
93
94
95
95
96
96
97
( )
4.51
4.52
4.53
4.54
4.55
4.56 ECONOMIES OF SCALE
4.57 ECONOMIES OF SCALE
4.58 ECONOMIES OF SCALE
4.59 ECONOMIES OF SCALE
4.60
5.1 2555
5.2 2554
97
98
98
99
99
100
100
101
101
102
104
104
1.1
2.1 (Burj Dubai)
2.2 Mahanakorn
2.3
2.4
2.5
2.6
2.7
2.8 (WBS)
2.9
2.10
2.11
2.12
10
41
42
43
44
45
46
47
48
49
50
51
52
1.1
(Developer)
(Cost Control) (Designer / Design
Consultant)
(Preliminary Design) (Project
Requirements) (Preliminary Construction Cost)
1. (Work Breakdown Structure)
(Cost Breakdown Structure)
3. (Budget Framework)
4.
5.
6. (Drawing) / (Specification)
(Project Requirements)
(Cost Control)
(Cost
Control) (Cost Management)
( , 2550)
: (www.bit.mju.ac.th/kittinoot/Materials/BIT_305/.doc)
( , 2550)
1.2
1.
2.
3.
1.3
.. 2554 ..2555
6
2 (
) ( )
- ( )
( )
- 2
( )
- 2
.
1.4
(General Status of The Firm)
() ( ) ( )
(Organizing)
(Matrix Organization)
(Function)
(Matrix Organization) (ProjectManager)
(Functional Project)
(Project Manager)
(Planing)
(procurement)
supplier
supplier
(Project Outsourcing)
(Design)
(Cost estimating)
(Construction estimating)
(Project Planning Cost Estimates)
(Project Design Cost Estimates)
(Cost control)
Cost baseline
(Environmental)
(Environmental uncertainty) (Resource dependence)
(Environmental munificence)
(Resource planning)
(Economies of Scale)
1
(Achievement)
(Achievement in Project Management)
(Project cost management)
(Cost)
(Project)
(Construction)
(Skyscraper) 23
7-8
(Initial project cost)
(Total Project Cost)
(Facility Management Cost)
(Sunk Cost)
(Disposal cost)
(Risk)
(Opportunity)
(Risk management planning)
(Internal Factor)
(External Factor)
(Project)
(Project)
(Budget)
(Prienciples of Technology Management)
(How) (System)
ROA (Return On Assets)
Net Income/Total Assets
(Total Assets) ROA
ROA 5%
(Net Profit Margin) (%) = (Net Profit) / (SALES)
(Authorized Capital)
10
1.5
1.1
-
-
-
-
-
(ROA)
-
-
-
-
-
-
-
-
-
-
- Economies Of
Scale
1.1
11
1.6
1.
2.
3.
12
1.
2.
3.
4.
2.1
(2550) (Cost
Management) (Cost Management)
(Cost Management)
(Cost Management)
(Cost Control)
(Cost Management) (Cost Control)
Cost Management
1. (Pre-design Stage)
(Projects Requirements)
(Procurement Strategy)
(Package of Procurement)
13
14
Cost Management Design Review Value Engineering
Budget for Design
Package of Procurement Pre-design Stage
Work Breakdown Structure
Cost Breakdown
Structure Cost Breakdown Structure
Budget Framework Cost Management
(Allocation of Building & Facilities Breakdown)
(Preliminary Quantity Takeoff) Allocation of Building &
Facilities Breakdown
(Procurement Management)
(Specification)
Value Engineering
4. (Design Stage-Detailed Design)
(Cost Saving Analysis)
15
(Tender Condition)
(Term of Reference TOR)
(Quantity Takeoff) (Bill of
Quantity BOQ.)
(BOQ. Structure) Cost Saving Analysis
Bill of Quantity (Financial Proposal)
Allocation of Building &
Facilities Breakdown
90
(Compatibility of Total Design)
Bill of Quantity
Value Engineering Design Review
5. (Tender Stage)
Bill of Quantity
TOR
Cost Saving Contractual
Budget Value Engineering Specification
Cost Management
Specification
Specification
Contractual Budget
16
17
(phase)
(phase)
Life cycle cost analysis
1. (Total Project Cost)
+
Total project Cost
+
Initial project cost + total facility management
(operation support) cost + Disposal cost
18
19
(Sunk
Cost)
4. (Disposal cost)
(total project cost)
(Life cycle cost)
(2554)
Project development cost estimates
2
(Project Planning Cost Estimates)
(Project Design Cost Estimates)
1
2
20
-
-
-
-
- (Static)
1.
(Project cost overrun)
2.
3.
21
4.
5.
(2551)
QA
Work Breakdown Structure (WBS)
WBS
WBS
WBS
WBS
22
Project manager
Project manager
WBS
Cost Control
Cost Control
Cost Control
Cost Control
(code structure)
23
WBS Cost Control
WBS Cost Control
18
(2550)
24
1.
(Project)
-
-
-
:
25
:
3
:
:
:
:
2.
(Project Life Cycle)
26
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
27
3.
-
-
-
-
-
-
-
-
4.
28
5.
:
:
:
:
29
:
:
6.
-
-
-
-
-
-
-
(Project)
30
(Project Management)
2.2
1.
(Criteria)
4 (Cleland,1994:3-37,Pinto&Slevin,1988:479-502,Turner,1993:85-97)
1.1 (Time Criterion)
(Project Total Duration) (Activity Duration)
1.2 (Monetary Criterion)
1.3 (Effectiveness Criterion)
1.4 (Client Satisfaction Criterion)
(Acceptance)
(Usage)
31
2. Paul C. Dinsmore
An Overview of Project Management Principles for Executives : Six
Lessons to Ensure Success . ( Dinsmore Associates Management
Consultants International ) 10
(Project
Management Ten Commandments)
1 (Concentrate on Interfacing)
2 (Organize the Project Team)
(Leadership Abilities)
3 (Plan
Strategically and technically)
(Work Breakdown Structure; WBS)
4 (Remember Murphys Law)
If Anything Can Go Wrong It Will
()
32
5 (Indentify Project
Stakeholders)
6 (Be Prepared to Manage Conflict)
7 (Expect the Unexpected)
8 (Listen to Intuition)
9 (Apply Behavioral Skill)
33
34
3 (Project Schedule /
Plans)
(Work Breakdown Structure)
(Milestones)
4 (Client Consultation)
(The Client)
(Communication) (Consultation)
(Active Listening)
5 (Personnel)
(Recruitment) (Selection) (Training)
(Key Personal)
(Teamwork
Building)
6 (Technical Tasks)
(Technical skills) (Expertise)
7 (Client Acceptance)
4
35
36
3
(Developing an Integrated Work Breakdown Structure, Schedule, and Budget)
.
. (Specifications)
. (Work Statement)
. (Master Schedule)
.
.
. (Network Diagram)
.
37
4 (Developing Integrated
Project Control)
(Inputs Control)
(Outputs) (Outcomes)
5 (Managing Conflict)
6 (Removing Roadblocks)
7 (Setting Priorities)
8 (Facilitating Project
Transfer)
(Project transfer)
(Delivery)
38
2 (Downward Communication)
3
(Outward Communication)
4 (Outward
Communication)
5. Peter W.G. Morris
Strategies for Managing Major Projects (Peter
W.G. Morris) ( )
(Major or Megaproject)
4 (Morris, 1993 : 39-54)
:
. (Objectives)
. (Strategies)
. (Technology)
. (Design)
:
3
39
. (External Environment)
1. (Politics)
2. (Community)
3. (Geophysical)
4. (Economics)
. (Monetary)
1. (Financial)
2. (Cost & Benefit)
. (Duration)
1. (Duration)
2. (Phasing)
3. (Urgency) (Critical Path)
: (Attitudes)
. (Commitment and Top
Management Support)
. (High Motivation)
. (Team work)
. (Positive Worldview)
: (Implementation)
. (Project Organization)
. (Contract Management)
.
.
40
.
.
.
. (Quality Assurance)
6. J. Jiang. G. Klein, and J. Balloun
J. Jiang. G. Klein, and J. Balloun Ranking of System
Implementation Success Factors Project Management
Journal 1996
10
1. (Clearly Defined goals and project
mission)
2. (Top Management Support)
3. (A Competent Project Manager)
4. (A Competent Project Team)
5. (Sufficient Resources)
6. / (Client/Customer
Involvement and Consultation)
7. (Good Communication)
8. (Responsiveness to Client)
9. (Proper Monitoring and Feedback)
10. (Appropriate Technology)
7. :
(2544)
12
1.
2.
3.
4.
41
5.
6.
7.
8.
9.
10.
11.
12.
2.3
42
2.2 Mahanakron
( : http://www.thaicontractors.com/content/cmenu/1/91/398.html)
77
9
2555
PACE Development
- 18,000
-
30 300
43
2.3
( : http://www.thaicontractors.com)
23
.. 2556
44
OWNER
DESIGNER
CONSULT
MAIN CONTRACTOR
MAIN
SUBCONTRACTOR
SPECIAL
SUBCONTRACTOR
MAIN
SUBCONTRACTOR
SPECIAL
SUBCONTRACTOR
MAIN
SUBCONTRACTOR
SPECIAL
SUBCONTRACTOR
2.4
: ( , 2554)
2.4
45
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2.5
: ( , 2554)
(matrix organization)
46
2.6
: http://library.tru.ac.th/intro03.html
47
2.7
: http://library.tru.ac.th/intro03.html
(matrix organization)
48
2.1
3.1
M&E
4
2.2
3.2
4.1
3.3
3.4
4.2
3.5
4.3
49
PROJECT VALUE
COMPLETED
WORK
PLANNED
VALUE
EARNED VALUE
SCHEDULE
PROJECT
ORIGIN
WORK TO DATE
2.9
: PHILLIPS, JOSEPH.IT PROJECT MANAGEMENT
EVM
50
SCHEDULING MANAGEMENT
OWNER
OWNER
-
OWNER
Sub-structure
Super-structure
Sub-structure
Super-structure
Master Schedule
Work Schedule
Daily
Schedule, 3-Week Schedule, Monthly Schedule, etc
3
2.10
: http://www.oknation.net/blog/okkit/2009/08/07/entry-1
Consultant
51
Good Master Schedule)
2.11
: http://www.oknation.net/blog/okkit/2009/08/07/entry-1
(Activity Planning)
(Schedule)
52
..2554
2.12
: http://www.thaiappraisal.org/thai/value/value.php
53
2.1
(Criteria to measure
success in administrative costs for the project)
(%)
(/
)
(/
)
(/
)
()
( )
(%)
(ROA) (%)
()
()
()
(
)
( : http://www.nstda.or.th/nstda-plan/1-plan-51/39-key-performance)
1. (%) 1 2554 1 2555
2. (ROA) (%) 1 2554
1 2555
3. (%)
2554 2555
4. (/) 2555
5. (/) 2554
2555
6. (/)
2554 2555
54
2.4
(2553)
6
(in-depth interview)
(content analysis)
(descriptive)
(2535)
1.
1 ..2525 2 .. 2533
55
2.
3.
(2549)
60
30 30
(t- test Statistic) 0.05
10
(2542)
3
.. 25302542
56
(2540)
DOS Window
Microsoft Project Primavera
57
(2552)
()
69
1.
2.
4
3.
()
()
58
(2546)
18
147
SPSS (Statistical Package for Social Sciences)
(2550)
( )
59
2.2
(2553)
(2535)
(2549)
(2542)
(2540)
(2552)
(2546)
(2550)
60
(Qualitative Research)
1.
2.
3.
4.
3.1
-
() ()
()
(Exploratory)
(Creditability)
6 6
- ()
1. (Project Controller) 1
- ()
1. (Project Controller) 1
61
- ()
1. (Project Controller) 1
-
1. (Owner) 1
- ()
1. (Owner) 1
-
1. (Owner) 1
-
-
.
-
-
(Economies of Scale)
-
-
-
-
-
-
1. ()
- ()
()
62
- ()
1
1. (%) 1 2554 1 2555
2. (ROA) (%) 1 2554
1 2555
3. (%) 2554
2555
4. (/) 2555
5. (/) 2554
2555
6. (/)
2554 2555
2.
-
- ()
-
2
1. (%) 1 2554 1 2555
2. (%) 2554
2555
3. (/) 2555
4. (/) 2554
2555
5. (/)
2554 2555
3.2
63
(, 2544 : 58)
(, 2544 : 271)
(, 2544 : 156)
1.
(
, 2544 : 22)
2.
3.
1
-
-
-
-
-
-
64
1.1 6 6
- ()
1. (Project Controller) 1
- ()
1. (Project Controller) 1
- ()
1. (Project Controller) 1
-
1. (Owner) 1
- ()
1. (Owner) 1
-
1. (Owner) 1
2
-
-
-
-
-
-
-
-
-
-
65
- Economies Of Scale
13
Economy of Speed
3
-
-
-
-
- ,
1. (Documentary Studies)
1.1
1.2
1.3 Web site
2.
3. (In-depth Interview)
(Key informant)
66
4.
5.
6.
3.3
1. (Primary Data)
6
1.1
1.2
1.3
2. (Secondary Data)
3.4
1. (Content Analysis)
2.
67
3. Triangulation
3.1
3.2 Methods Triangulation
68
6 6
- ()
1. (Project Controller) 1
- ()
1. (Project Controller) 1
- ()
1. (Project Controller) 1
-
1. (Owner) 1
- ()
1. (Owner) 1
-
1. (Owner) 1
4.1
1
1.1 6 6
69
2
6 (Content Analysis)
3
4.2
1
4.1
(%)
(/
)
(/
)
17 /
10 /
27 /
2 /
2 /
4 /
()
( )
2555
(%)
(ROA) (%)
()
()
()
(
)
-1.49%
1.64%
154%
300,000,000
21.96%
8.21%
16%
90,000,000
2.54%
3.48%
27%
400,000,000
20%
2.10%
33%
25,000,000
25%
3.50%
150%
30,000,000
15%
4.90%
50%
39,000,000
: http://www.set.or.th
(/)
4,921,678,180
1,117,252,920
1,600,000,000
1,000,000
1,000,000
3,000,000
70
2554
1.1
6
1 ( )
31
7
2 ()
31 8
3 () 33
9
4 31
7
5 () 33
11
6 () 48
24
2
6
3
71
Economies Of Scale
(Content Analysis)
13
6
4.2
1
2
3
4
5
6
7
8
9
10
11
Economies Of Scale
72
4.2 ()
12
13
ECONOMY OF SPEED
Economies Of Scale
ECONOMY OF SPEED
4.3
()
1
2
3
4
5
6
ECONOMIES OF SPEED
73
4.4
2.1
()
1
2
3
4
5
6
1.
4.5
()
1
2
3
4
5
6
2.
74
4.6
()
1
2
3
4
5
6
3.
OUT SOURCE
4.7
()
1
2
3
4
5
6
4.
75
4.8
2.2
()
1
2
3
4
5
6
5.
4.9
()
1
2
3
4
5
6
6.
76
4.10
()
1
2
3
4
5
6
7.
4.11
()
1
2
3
4
5
6
8.
77
4.12
2.3
()
1
2
3
4
5
6
9.
CBS
WBS CBS
4.13
()
1
2
3
4
5
6
10.
WORK PROGRAM CBS
WBS & CBS
78
4.14
()
1
2
3
4
5
6
11.
79
()
1
2
3
4
5
6
()
1
2
3
4
5
6
80
4.17
()
1
2
3
4
5
6
14.
4.18
()
1
2
3
4
5
6
15.
81
4.19
()
1
2
3
4
5
6
16.
4.20
2.4
()
1
2
3
4
5
6
17.
82
()
1
2
3
4
5
6
4.22
()
1
2
3
4
5
6
supplier
83
()
1
2
3
4
5
6
,, ,
Schedule Plan
4.24 Schedule Plan
()
1
2
3
4
5
6
plan
Schedule Plan
84
4.25
2.5
()
1
2
3
4
5
6
22.
..
4.26
()
1
2
3
4
5
6
23.
85
4.27
()
1
2
3
4
5
6
24.
4.28
()
1
2
3
4
5
6
25.
86
4.29
2.6
()
1
2
3
4
5
6
26.
4.30
()
1
2
3
4
5
6
27.
WBS
87
4.31
()
1
2
3
4
5
6
28.
4.32
()
1
2
3
4
5
6
29.
SUPPLY CHAIN
88
4.33
2.7
()
1
2
3
4
5
6
30.
4.34
()
1
2
3
4
5
6
31.
shop drawing
Shop Drawing
89
BOQ QUOTATION
4.35
()
1
2
3
4
5
6
32.
4.36
2.8
()
1
2
3
4
5
6
33.
90
4.37
()
1
2
3
4
5
6
34.
4.38
()
1
2
3
4
5
6
35.
91
4.39
()
1
2
3
4
5
6
36.
4.40
2.9
()
1
2
3
4
5
6
37.
cost breakdown structure
92
WBS CBS
4.41
()
1
2
3
4
5
6
38.
schedule plan
cost breakdown structure
WBS, CBS
4.42
()
1
2
3
4
5
6
39.
93
4.43
()
1
2
3
4
5
6
40.
4.44
2.10
()
1
2
3
4
5
6
41.
WBS CBS
94
WBS, CBS
4.45
()
1
2
3
4
5
6
42.
95
4.46
()
1
2
3
4
5
6
43.
4.47
()
1
2
3
4
5
6
44.
96
4.48
2.11
()
1
2
3
4
5
6
45. (
)
4.49
()
1
2
3
4
5
6
46.
97
4.50
()
1
2
3
4
5
6
47.
4.51
()
1
2
3
4
5
6
48.
98
4.52
2.12
()
1
2
3
4
5
6
49. ( , )
4M
,
4.53
()
50.
1
2
3
4
5
6
KPI
KPI
99
KPI
4.54
()
1
2
3
4
5
6
51.
4.55
()
1
2
3
4
5
6
52.
100
()
1
2
3
4
5
6
ECONOMIES OF SCALE
()
1
2
3
4
5
6
ECONOMIES OF SCALE
ECONOMY OF SCALE
101
()
1
2
3
4
5
6
ECONOMIES OF SCALE
ECONOMIES OF SCALE
4.59 ECONOMIES OF SCALE
()
1
2
3
4
5
6
ECONOMIES OF SCALE
3
102
4.60
()
1
2
3
4
5
6
103
5
(Content Analysis)
5.1
4
1 2555
2554
2
3
4
104
5.1 2555
1
(%)
(/
)
()
( )
2555
(%)
(ROA) (%)
()
()
()
()
-1.49%
1.64%
154%
300,000,000
21.96%
8.21%
16%
90,000,000
2.54%
3.48%
27%
400,000,000
20%
2.10%
33%
25,000,000
25%
3.50%
150%
30,000,000
15%
4.90%
50%
39,000,000
(/
)
17 /
10 /
27 /
4 /
4 /
4 /
(/)
4,921,678,180
1,117,252,920
1,600,000,000
1,000,000
1,000,000
3,000,000
: http://www.set.or.th
: (%)
5.2 2554
(%)
(/
)
()
( )
2554
(%)
(ROA) (%)
()
()
()
-3.78%
1.45%
40%
300,000,000
19.01%
6.50%
10%
90,000,000
2.00%
3.07%
15%
400,000,000
(/ )
17 /
10 /
27 /
(/)
4,921,678,180
1,117,252,920
1,600,000,000
105
5.2 ()
(%)
(/
)
(/ )
(/)
()
( )
2554
(%)
(ROA) (%)
(
)
15%
1.10%
15%
25,000,000
4 /
1,000,000
10%
2.50%
10%
30,000,000
4 /
1,000,000
10%
3.90%
10%
39,000,000
4 /
3,000,000
: http://www.set.or.th
: (%)
()
- ()
- ()
- ()
()
2554 -3.78% 2555 -1.49%
2555
2555 ROA = 1.64% 2554 ROA = 1.45
2555
2555 = 154% 2554 =
40% 2555
106
2555 METRO
SKY RATCHADA 8 (3 ) 300,000,000
420
17
4,921,678,180
107
()
2554 = 19.01% 2555 = 21.96%
2555
2555 ROA = 8.21% 2554 ROA =
6.50% 2555
2555 = 16% 2554 = 10%
2555
2555
8 1 90,000,000
210
10
108
1,117,252,920
()
2554 = 2.00% 2555 = 2.54%
2555
109
2555 ROA = 3.48% 2554 ROA =
3.07%% 2555
2555 = 27% 2554 =
15% 2555
2555
CITY RESORT 30 1 400,000,000
641
25
110
vvkvk;6Fl
M&E
vvkvk;6F
l
1,600,000,000
111
-
- ()
-
2554 = 15% 2555 = 20% 2555
2555 = 33% 2554 =
15%
2555
2555
8 1 25,000,000 240
4
( )
()
()
()
()
()
( )
(,)
112
1,000,000
()
2554 = 10% 2555 = 25%
2555
113
( )
()
()
()
()
-
()
()
()
()
( )
1,000,000
2554 = 10% 2555 = 15%
2555
114
2555
2555
9 1 39,000,000 300
4
,
-
3,000,000
115
1
6
6 31
3 33 2 48 1
6
2 4
6
(. ) 1
(. ) 1 (.) 1 (.)
1 (.) 1
(.) 1
6
24 1 11 1 9 1 8 1
7 2
6
3 3
116
6
6 6
31 3 33 2 48 1
4 2 8
2 9 1 7 1 11 1
24 1 3
3
2
1.
117
WBS CBS
WBS CBS
118
Supplier
..
119
Shop Drawing
BOQ Quotation
WBS CBS
120
WBS, CBS
121
KPI
ECONOMIES OF SCALE
122
13
13
Economy of Speed
3
(
)
4
1.
2.
123
3.
1.
2.
124
3.
5.2
1.
9 (Stuckenbruck, 1988 :
56-81 & Stuckenbruck (ed.), 1985 : 94-117)
125
126
Paul C. Dinsmore (1987 : )
(Work Breakdown Structure)
(2550 : )
Paul
C. Dinsmore (1987 : )
Pinto&Slevin (1988 : )
Paul C. Dinsmore
(1987: )
127
Pinto&Slevin (1988 : )
WBS CBS
WBS CBS
Pinto&Slevin (1988 : )
Paul C. Dinsmore (1987 : )
128
Supplier
Pinto&Slevin (1988 : )
Paul C. Dinsmore (1987 : )
(
)
Pinto&Slevin (1988 : )
..
129
Pinto&Slevin (1988 : )
Shop Drawing
BOQ Quotation
Pinto&Slevin (1988 : )
130
Pinto&Slevin
(1988 : )
Paul C. Dinsmore (1987 : )
WBS
CBS
Pinto&Slevin (1988 : )
131
Paul C. Dinsmore (1987 : )
WBS, CBS
132
Paul C. Dinsmore (1987 : )
Pinto&Slevin (1988 : )
Paul C. Dinsmore (1987 :
)
Pinto&Slevin (1988 : )
133
KPI
Pinto&Slevin (1988 : )
ECONOMIES OF SCALE
134
Stuckenbruck (1988 : )
3.
( )
Pinto & Slevin (1988 : )
135
4.
1.
,
Pinto&Slevin
(1988 : )
(Project Mission)
2.
136
Pinto&Slevin (1988 : )
(Project
Mission)
9
(Stuckenbruck, 1988 :56-81 & Stuckenbruck (ed.), 1985 : 94-117)
(Planning for Integrated Project)
(2550 : )
3.
137
Pinto&Slevin (1988 : )
(Project Mission)
Pinto & Slevin (1988 : )
Paul C. Dinsmore
10
(Listen to Intuition)
9
(Stuckenbruck, 1988 : 56-81 & Stuckenbruck (ed.), 1985 : 94-117)
(Planning for Integrated Project)
5.3
1.
138
2.
139
Organization Chart
Outsource
140
Economy of Scale
Supply Chain
141
CBS
WBS
142
ECONOMIES OF SCALE
Economy of Scale
3.
4.
143
1.
2.
3.
144
5.4
1.
2.
3.
145
. 2552. .
. .
, []. :
http://blog.eduzones.com/poonpreecha/81098, [ 28 2554]
. 2554. []. :
http://www.set.or.th/set/commonslookup.do?prefix=S&language=th&country=TH,
[ 18 2555]
. 2546.
. . .
. 2550.
. .
.
. 2553.
115/22 kv . .
.
. 2550. :
, (ACS) . :
.
. 2550. CEO. 8. :
.
. 2542. .
. .
PDF. 2554. []. :
http://www.thaiappraisal.org/thai/value/value.php, [ 8 2555]
. 2555. , []. :
http://th.wikipedia.org/wiki/, [ 18 2554]
146
( )
. 2540. .
. . .
. 2553. . 1. : .
. 2554. . 2. .
. 2535.
. . .
. 2552.
SMEs Projects, []. :
http://logisticscorner.com/index.php?option=com_content&view=article&id=
476:-logistics-outsourcing&catid=37:procurement&Itemid=88,
[ 31 2555]
. 2554. : . 2.
. 2549.
. .
.
. 2550. , Internet.
Meredith,J.R.,& Mantel,S.J.,Jr. 1998. Project managerial approach (4th ed.) New York : John
Wiley & Sons.
Schwallbe,K. 2003. Information technology project management (4th ed.) Canada : Thomson
course technology.
147
148
149
1
1
()
( )
2555
()
(%)
-1.49%
(ROA) (%)
1.64%
(%)
(/)
(/
)
(/)
154%
300,000,000
17 /
4,921,678,180
http://www.set.or.th
1.1 6 6
-
()
, 2034/132-161
31
, ( )
7
,
150
2
1.
2.
151
3.
4.
5.
6.
7.
8.
9.
CBS
10.
11.
152
14.
15.
16.
17.
18. Master Schedule Plan
153
22.
23.
24.
25.
26.
27.
28.
29.
30.
154
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
155
43.
44.
45. (
, ,)
46.
47.
48.
49. ( ,
)
50.
51.
52.
156
ECONOMIES OF SCALE
53. ECONOMIES OF SCALE
..
......................................................................................................
157
2
1
()
(
)
2555
()
(%)
21.96%
(ROA) (%)
8.21%
(%)
(/
)
(/
)
(/)
16%
90,000,000
10 /
1,117,252,920
http://www.set.or.th
1.1 6 6
-
()
1308 13/1 , 175
.
31
8
158
8 1
90,000,000 210 ( )
2
, , ,,
1.
2.
159
3.
4.
5.
6.
7.
8.
9.
10.
11.
12. Work Breakdown Structure
160
17.
18. Master Schedule Plan
161
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
shop drawing
162
32.
33.
34.
35.
36.
37.
38.
schedule plan
39.
40.
41.
42.
43.
163
44.
45. (
, ,)
46.
47.
48.
49. ( ,
)
50.
51.
52.
164
ECONOMIES OF SCALE
53. ECONOMIES OF SCALE
54. ECONOMIES OF SCALE
, , ,
..
......................................................................................................
165
3
1
()
( )
2555
()
(%)
2.54%
(ROA) (%)
3.48%
(%)
(/)
(/
)
(/
)
27%
400,000,000
27 /
1,600,000,0
00
http://www.set.or.th
1.1 6 6
-
()
555/7-11 63 () 63 .
33
, ( )
9
,
166
CITY RESORT 30 1
400,000,000 641 ( )
M&E
vvkvk;6Fl
vvkvk;6Fl
167
2
, , ,
1.
2.
3.
4.
5.
6.
7.
8.
168
9.
10.
WORK PROGRAM CBS
11.
15.
169
16.
17.
18. Master Schedule Plan
22.
23.
,
24.
25.
170
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
171
37.
38.
39.
40.
41.
42.
43.
44.
45. (
, ,)
46.
172
47.
,,
48.
49. ( ,
)
4M
50.
51.
52.
ECONOMIES OF SCALE
53. ECONOMIES OF SCALE
54. ECONOMIES OF SCALE
55. ECONOMIES OF SCALE
173
174
4
1
()
( )
2555
(%)
20%
(ROA) (%)
2.10
(%)
(/)
(/
)
(/
)
33%
25,000,000
2 /
1,000,000
http://www.set.or.th
1.1 6 6
-
1018 .3 . . . . 10270
31
, ( )
7
175
()
()
()
()
()
()
()
(,)
1.
2.
3.
176
4.
5.
6.
7
8.
9.
10.
11.
12. Work Breakdown Structure
13. Cost Breakdown Structure
177
14.
15.
16.
17.
18. Master Schedule Plan
19. Master Schedule Plan
20. Schedule Plan
21. Schedule Plan
22.
,
178
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
179
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
180
45. (
, ,)
46.
47.
48.
49. ( ,
)
50.
KPI
51.
52.
ECONOMIES OF SCALE
53. ECONOMIES OF SCALE
54. ECONOMIES OF SCALE
181
55. ECONOMIES OF SCALE
56. ECONOMIES OF SCALE
- ECONOMIC OF SPEED
......................................................................................................
182
5
1
()
( )
2555
( )
(%)
25%
(ROA) (%)
3.50
(%)
(/)
(/
)
(/
)
150%
30,000,000
4 /
1,000,000
http://www.set.or.th
1.1 6 6
-
()
828/256 .3 . . . . . 10270
33
,
11
183
( )
()
()
()
()
( )
-
()
()
()
()
( )
.
ECONOMY OF SCALE
2
ECONOMIES OF SPEED
1.
2.
184
3.
4.
5.
6.
7.
8.
9.
185
10.
WBS & CBS
11.
14.
15.
16.
186
17.
18. Master Schedule Plan
19. Master Schedule Plan
20. Schedule Plan
,, ,
21. Schedule Plan
22.
23.
2
24.
187
25.
26.
27.
28.
29.
SUPPLY CHAIN
30.
31.
32.
188
33.
34.
35.
36.
37.
40.
41.
WBS CBS
189
42.
43.
44.
45. (
, ,)
46.
47.
48.
49. ( ,
)
,
190
50.
KPI
51.
52.
ECONOMIES OF SCALE
53. ECONOMIES OF SCALE
191
-
-
- ECONOMY OF SPEED
ECONOMY OF SCALE
192
6
1
()
( )
2555
(%)
15%
(ROA) (%)
4.90
(%)
(/
)
(/
)
(/
)
50%
39,000,000
4 /
3,000,000
http://www.set.or.th
1.1 6 6
-
39/66 .1 . - 12110
48
24
193
,
-
ECONOMIC OF SCALE
2
1.
2.
194
3.
4.
5.
6.
7.
8.
9.
10.
11.
12. Work Breakdown Structure
195
16.
17.
18. Master Schedule Plan
196
22.
23.
24.
25.
26.
,
27.
28.
29.
30.
31.
197
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
198
44.
45. (
, ,)
46.
47.
48.
49. ( ,
)
50.
51.
52.
199
ECONOMIES OF SCALE
53. ECONOMIES OF SCALE
54. ECONOMIES OF SCALE
55. ECONOMIES OF SCALE
200
. 2555
. 2546
. 2544
()
. 2552-
1/131 . 190/2 .
10510
082-0925225
wenich_j@yahoo.com
doctorwenich@gmail.com