Professional Documents
Culture Documents
ARC 492 - 56 (ครั้งที่ 3-4) Site & Location
ARC 492 - 56 (ครั้งที่ 3-4) Site & Location
(Location Selection)
(Site Selection)
(Site Analysis)
Lacation Site
Location =
Site =
(Location Selection)
1. (Macro Scale Location) :
(Regional Location) : (
)
1.1
2. (Node Location) :
)
(Location) 3
/ / / / / /
2-5
2.1
3
2.2
(Criteria for Location Selection)
5
(Weight) 25
16
(Criteria for Location ans Site Selection)
16
(Criteria for Location and Site Selection)
(Criteria) =
1.
(Catchment Area)
(Market Share)
(Important Linkage)
16 ( )
(Criteria for Location and Site Selection)
(Technique)
(Laws)
(Land Use)
(Transportation)
16 ( )
(Criteria for Location Selection)
3. (Social and Culture)
(Population)
(Safety)
(Conformity)
4. (Environment)
(Pollution)
EIA
(Local resource)
16 ( )
(Criteria for Location and Site Selection)
5. (Future Trends)
(Trend
in Zoning Restriction)
(Expropriation)
(Community Expansion)
(Weight) (Grade)
25
4-0 -4 -3 -2 -1 -0
5 7 16
25 4 100
(
)
Site 1
Site 2
Site 3
24
24
24
12
20
15
10
12
12
12
12
25
83
92
82
Site analysis
(Site Analysis)
?
(Site Dimension)
(Accessibility)
(Approach)
(Physical Existing Conditions)
(Views)
(Surroundings)
( Sun and Wind Direction )
(Site Constraint)
(Code and Regulation)
( ) PROJECT:
(Site Location)
() 7.5
12,000
..
Site analysis
2.
-
-
- . True
-
RS
9
.
True
PROJECT:
Location2
Site Dimension
140 M.
85 M.
170 M.
90 M.
Site surrounding
RS
True
Site surrounding
LINKAGE
office
TRANSPORTATION
SUN SET
SUN RISE
Pollution
noise
Pollution
noise
Pollution
noise
Pollution
noise
Site Analysis
10%
6 m.
12,000
F.A.R.1 : 2
F.A.R.
15 m.
SITE
10,692 m2
esplanade
6 m.
6 m.