Professional Documents
Culture Documents
Relationship TPR and Ipr
Relationship TPR and Ipr
example 1
depth of tubing , ft
average reservoir pressure, psi
PI (linear), b/d/psi
GLR, SCF/B
Tubing diameter, in
fixed Pwh, psi
tpr
q(tpr)stb/d
100
200
400
500
600
1000
2000
6000
3250
0.85
200
2.5
300
Pwf, psi
2280
2220
2180
2160
1840
2120
2280
ipr
q(ipr) stb/d
2762.5
0
Pwf,psi
0
3250
3500
3000
2500
2000
ipr
1500
tpr
1000
500
0
0
500
1000
1500
2000
2500
3000
reservoir properties
oil viscisity,cp
Bo rb/stb
kro
J*
5000
300
250
4
future
3.15
3.62
1.175
1.152
0.815
0.685
4.85 3.617946
present
future
4.85
2600
2300
determine flowrate and flowing bottomhole pressure for the present and future
tpr
q, b/d
Pwf,psi
1000
1600
2000
1480
3000
1600
4000
1680
ipr
present
future
Pwf,psi
q, b/d
Pwf,psi
0
2600
0
2300
12610
0 8321.276
0
q, b/d
3000
2500
2000
tpr
1500
present
future
1000
500
0
0
2000
4000
6000
8000
10000
12000
14000