Project Integration Management Overview

Thanks so much Abdallah El-Chal for sending this my way...hopefully others will find it useful too.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views5 pages

Project Integration Management Overview

Thanks so much Abdallah El-Chal for sending this my way...hopefully others will find it useful too.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project Integration Management

Process Input Tools and Techniques Output Notes


Develop Project Charter - Contract(if applicable) -Expert Judgment -Project Charter Project Selection Methods
- Statement Of Work (SOW) 1- Benefit Measurement Methods
- Enterprise Environmental Factors a. Economic Models
- Organizations Process Assets b. Scoring Models
- Business Case c. Comparative Approach
d. Benefit Contribution
e. Murder Board
2- Constrained Optimization Methods
a. Linear
b. Non-Linear
c. Dynamic
d. Integer
e. Multi-objective algorithms

Develop Project Management Plan -Project Charter -Expert judgment -PM Plan -PM Plan is Formal, single document, approved (becomes officially the
-Outputs from Planning Processes project plan. It defines how project is executed and controlled. Scope,
-EEF/OPA schedule, and Cost, Change, and Configuration Management plans are
created in this process and are part of the PM plan
- Scope Management plan is developed here as well

Direct and Manage Project execution -PM Plan -Expert Judgment -Deliverables -Change Requests:
-Approved Change Requests -PMIS -Work Performance Information 1.Corrective Actions
-EEF/OPA -Change Requests 2.Preventive Actions
-PM Plan updates 3.Defect Repair
-Project Document updates 4.Updates

Monitor and Control Project work -PM Plan -Expert Judgment -Change Requests
-Performance Reports -PM Plan updates
-EEF/OPA -Project Document updates

Perform Integrated Change Control -PM Plan -Expert Judgment -Change request status updates -Changes may be requested by any stakeholder
-Work Performance Information -Change Control meetings -PM Plan updates
-Change Requests -Project document updates
-EEF/OPA

Close Project or Phase -PM Plan -Expert Judgment -Final Product, Service, or Result
-OPA transition
-Accepted Deliverables(come from -OPA updates
verify scope)

Project Scope Management


Process Input Tools and Techniques Output Notes
Collect Requirements -Project Charter -Interviews -Requirements Management Plan Facilitated Workshops examples: JAD and Quality Function Deployment
-Stakeholder Register -Focus Groups (how requirements will be analyzed, Group Creativity Technique examples:
-Facilitated Workshops documented, and managed through- -Brainstorming
-Group Creativity Technique out the project) -Nominal Group Technique: enhances brainstorming with voting process
-Group decision making -Requirements Traceability -Delphi Technique
techniques Matrix(map requirements to their -Idea and Mind Mapping
-Questionnaires and Surveys sources) -Affinity Diagram: large numbers of ideas to be sorted into groups
-Observation(Job Shadowing) -Requirements Documentation Group Decision making technique
-Prototypes -Unanimity: everyone agrees on single course of action
-Majority: support from more than 50% of the members of the group
-Plurality: the largest block in a group decides even if a majority is not
achieved
-Dictatorship: one individual makes the decision for the group

Define Scope -OPA -Product Analysis(product en- -Project Scope Statement Project Scope statement includes:
-Project Charter gineering, value and systems -Project Document updates -Product scope description
-Requirements Documentation engineering) -Product acceptance criteria
-Expert Judgment -Project Deliverables
-Facilitated Workshops -Project inclusions and exclusions
-Alternative -Project constraints
Analysis(brainstorming, -Project assumptions
lateral thinking, pair wise
comparison)

Create WBS -OPA -Decomposition -WBS -Code of account is used to name the WBS (uid)
-PSS -WBS dictionary -Planning packages are between Control Accounts and Work Packages
-Requirements Documentation -Scope Baseline -WBS isn’t time based
-Project Document updates -WBS does form the Scope Baseline
-WBS is a communication tool
-Created by the entire team

Verify Scope -PM Plan(Scope baseline) -Inspection -Change Requests Formal process to verify and obtain stakeholder acceptance of the com-
-Requirements documentation -Project Document Updates pleted project scope and deliverables
-Validated Deliverable -Accepted Deliverables -Usually performed after Perform Quality Control
-Requirements Traceability Matrix -Verify Scope is concerned with completeness, and Perform Quality Control
is concerned with correctness
-If the project is cancelled before completion, Verify Scope is performed to
show where the Project was in relation to the Scope when it ended

Control Scope -PM Plan(Scop Baseline) -Variance Analysis -Work Performance Measurements Integrated Change Control spans:
-Work Performance Info -OPA updates -Control Scope
-Requirements Documentation -Change Requests -Control Schedule
-Requirements Traceability Matrix -PM Plan updates -Control Cost
-OPA -Project Document updates -Quality Control
-Monitor and Control Risk
-Administer Procurements

Initiation Planning Execution Monitoring and Controlling Closing


Project Time Management
Process Input Tools and Techniques Output Notes
Define Activities -EEF/OPA -Decomposition -Activity List Rolling wave planning: Lets you plan as you go
-Scope Baseline -Rolling wave planning -Milestone List -Control Accounts ( placed higher than work packages)
-Expert Judgment -Activity Attributes -Planning Package(placeholder put between control accounts and work packages)
-Template, forms, standards

Sequence Activities -PSS -Precedence Diagramming -Project Scheduled Network -External Predecessors
-Activity List Technique (PDM) Diagrams -Discretionary Predecessors (Preferred logic, Soft logic)
-Activity Attributes -Scheduled Network -Project documents updates -Mandatory Predecessors (Hard logic)
-Approved Change Requests Templates (Activity List) -Floats or slacks: task may be delayed without affecting Project finish time or another task
-Milestone list -Dependency Determination start time
-OPA -Leads ,Lags and Floats

Estimate Activity Resources -EEF/OPA -Bottom- up Estimating -Activity Resource Requirements -Bottom-up estimating: Breaking down complex activities into pieces.
-Activity List -Expert Judgment -Resource Breakdown Structure -Published Est. Data: Published data as books and journals
-Activity Attributes -Alternative Analysis (RBS) -Alte. Analysis: means considering several different options for how to assign resources
-Resource Availability -Published Est. Data -Project document updates
-PM Software

Estimate Activity Durations -EEF/OPA -Analogous Estimating -Activity Duration Estimates -Analogous( top down): is when you look at activities from previous similar jobs
-PSS -Parametric Estimating -Project Documents updates -Parametric: means using mathematical models, computer, software, etc.. to come up with
-Activity List -Three point Estimates the estimate
-Activity List Attributes -Reserve Analysis -Three point (PERT Program Evaluation and Review Technique)): Come up with three points,
-Resource Calendar -Expert Judgment Optimistic, Pessimistic, and Most Likely PERT = P+4R+O/6
-Activity Resource Requirements Standard Deviation σ = (P-O)/6
-Reserve Analysis: Adding extra time, contingency or buffer)

Develop Schedule -EEF/ OPA -Schedule Network Analysis -Project Schedule (Network -Critical Chain method: Resource dependencies are used to determine the critical path. Deter-
-PSS -Critical Path Method Diagrams, Gantt Charts, mine latest possible start and finish date for each activity and then add schedule buffer.
-Activity List and Attributes -Schedule Compression Milestone list) -Resource Leveling: Evaluates all of the resources to see if the critical path needs to change.
-Activity Duration Estimates -What-If Scenario Analysis -Schedule Baseline -Float: amount of time an activity can slip before it causes delay in project
-Activity Resource Requirements (Monte Carlo) -Project Document updates -Float for activities on CP is 0. CP- next longest path= float.
-Project Schedule Network Diagrams -Resource Leveling -Schedule data -EF= ES + Dur - 1
-Resource Calendar -Critical Chain Method -LF = LS + Dur - 1
-Applying Leads and Lags -ES= Prev EF + 1
-Scheduling tool -Last LF is the same as Last EF.
-LS = LF- duration + 1
-Prev LF = Next LS – 1
-Float = LS- ES
-Schedule Compression: includes Fast-tracking and crashing. Crashing almost always
increases cost
-Heuristics: Rules for which no formula exists. Usually derived through trial and error.
-Free Float: how much time an activity can be delayed without affecting the early start date of
subsequent dependent activities.

Control Schedule -PM Plan(Schedule Management -Performance reviews -Work Performance Measure- -S-Curve
Plan) -Variance analysis ments -1σ = 68.27%
-Work Performance Info -Resource leveling -OPA updates -2σ = 95.45%
-Project schedule -PM software -Change Requests -3σ = 99.73%
-OPA -What-if scenario -PM Plan updates
-Adjusting Leads and Lags -Project document updates
-Schedule Compression
-Scheduling tool

Initiation Planning Execution Monitoring and Controlling Closing


Project Cost Management
Process Input Tools and Techniques Output Notes
Estimate Costs -EEF (Market condition, Commercial -Analogous Estimating -Activity Cost Estimates -Cost of quality: Cost that is incurred to achieve required quality
databases) -Bottom-up Estimating -Activity Cost Estimate supporting -Rough order of magnitude: As the project moves, estimates should become more accurate
-OPA -Parametric Estimating detail (basis of estimates) -Direct Costs: Costs that can be directly attributed to a specific project or service
-Scope baseline -Cost of Quality -Project document updates -Indirect Costs: costs not directly attributed to a specific project or service
-Schedule -Vendor Bid Analysis -Fixed Costs: costs that do not change based on business volume
-Risk Register -Reserve Analysis -Variable Costs: costs that do change based on business volume
-HR plan -Expert Judgment -Stranded/Sunk Costs: costs uncured that cannot be reversed irrespective to future events
-Three-point estimates -Value Engineering/ Analysis: Doing the same work for less. E.g. outsourcing
-PM estimating software -Marginal analysis: Spend time on improvement if it improves revenues or productivity.
-Order of Magnitude Estimate: -50% to +100%
-Conceptual Estimate: -30% to + 50%
-Preliminary Estimate: -20% to +30%
-Definitive Estimate: -15% to +20%
-Control Estimate: -10% to +15%

Determine Budget -Activity Cost Estimates -Cost Aggregation -Cost Performance Baseline -Budget (also called cost performance baseline), is time-phased. It is performed after Define
-Basis of estimates -Reserve Analysis -Project funding requirements Activities, Estimate Durations, Estimate Resources, and Develop Schedule.
-Scope Baseline (represents -Expert Judgment -Project document updates -Planned Value (PV). Also called Budgeted Cost of Work Schedule (BCWS)
PSS,WBS, and WBS dictionary) -Historical relationships -Earned Value (EV). Also called Budgeted Cost of Work Performed (BCWP)
-Resource Calendar -Funding limit reconciliation -Actual Cost (AC). Also called Actual Cost of Work Performed (ACWP)
-Project schedule -Cost Variance (CV)
-Contracts -Schedule Variance (SV)
-OPA -Budget at Completion (BAC)
-Estimate at Completion (EAC)
-Estimate to Complete (ETC)
-Variance at Completion (VAC)
-Estimate at Completion (EAC)
-Estimate to Complete (ETC)
-Variance at Completion (VAC)
-Cumulative CPI: The rate at which the project performance is meeting cost expectations
from the beginning up to a point in time. Also used to forecast project’s cost at completion
-To-Complete Performance Index (TCPI): performance which must be achieved on all
remaining work in order to meet either financial or schedule goals. Two forms, TCPIC and
TCPIS

Control Costs -PM plan -EVM Measurement -Work Performance Measurements -PV = Planned % Complete x BAC expressed in $
-Project funding requirements -Forecasting -Budget Forecasts -EV = BAC x Actual % Complete
-Work Performance Information -To-Complete performance -OPA updates -SV = EV – PV (measured in $) ( +ive, ahead of schedule)
-OPA index -Change Requests -SPI = EV/PV ( IF > 1, ahead of schedule)
-Performance Reviews -PM Plan updates -CPIC = EVC/ ACC
-Variance Analysis -Project document updates -CV = EV – AC (if +ive, within budget)
-Project Management software -CPI = EV/ AC ( CPI > 1 and CV is +ive, within budget)
-EAC = BAC / CPIc
-ETC = EAC – AC
-VAC = BAC – EAC
-TCPI=BAC-EV/EAC-AC (lower than 1 is good)

Project Qualtiy Management


Process Input Tools and Techniques Output Notes
Plan Quality -Scope Baseline -Cost Benefit Analysis -Quality Management Plan -Cost benefit: Looking at how much your quality activities will cost.
-Stakeholder Register -Cost of Quality -Quality Metrics -Benchmarking: means using the results of quality planning on other projects to set goals for
-Cost Performance Baseline -Control Charts -Quality Checklist your own.
-Schedule Baseline -Benchmarking -Project document updates (PM Plan -Design of experiments: is the list of all the kinds of tests you are going to run on your
-Risk Register -Design of Experiments updates) product.
-EEF/OPA -Statistical Sampling -Process Improvement Plan -Total Quality Management (TQM): Everyone in the company is responsible for quality and is
-Flowcharting able to make a difference
-Proprietary quality manage- -Continuous Improvement (Kaizen): constant process improvement in the form of small
ment methodologies changes
-Additional quality planning -Just-In-Time(JIT)
tools (Brainstorming, Affinity -ISO 9000: Companies document what they do and they do what they document
Diagrams, Nominal Group -Mutually Exclusive: one choice excludes the other
Technique) -1σ = 68.25%
-2σ = 95.46%
-3σ = 99.73%
-6σ = 99.99966%
-Attribute Sampling :is binary, it either conforms to quality or it doesn’t
-Variable Sampling: Measures how well something conforms to quality
-Special Causes: considered unusual and preventable, while common causes are generally
acceptable

Perform Quality As- -PM Plan (Quality Management plan, -Quality Audits – internal or -OPA updates -Proactive steps taken by PM and the mgmt team to insure the quality standards are being
surance Process Improvement plan) external -Change Requests help and monitored
-Quality Metrics -Quality Planning -PM Plan updates
-Work Performance Info -Process analysis -Project Document updates
-Quality Control measurements -Tools from Plan Quality and
Perform Quality control

Perform Quality Control -PM Plan (Quality Mgmt Plan) -Control charts -Quality Control Measurements -Control Charts: Visualize how processes are doing over time. (rule of seven: out of control)
-Quality Checklists -Pareto Chart -Validated deliverables and validated -Cause and Effect: Fishbone or Ishikawa. Used to figure out what caused a defect
-Deliverables -Cause and Effect Diagram defect repair -Pareto Charts: figure out which problems need attention right away. (80-20 rule)
-Work Performance Information -Scatter Diagram -OPA updates -Scatter Diagram: Shows pattern of relationship between 2 variables when 2 variable is
-Quality Metrics -Run Chart -Change Requests dependent on the other
-OPA -Flowcharting -PM Plan updates -Run Chart: tell about trends in the project. Shows the history and pattern
-Approved Change Requests -Histogram -Project Document updates (base- -Flow Chart: Shows how processes interrelate
-Statistical Sampling line, quality standards) -Histogram: gives an idea of how data breaks down
-Inspection
-Defect(Approved Change
Requests) Review

Initiation Planning Execution Monitoring and Controlling Closing


Project Risk Management
Process Input Tools and Techniques Output Notes
Planning Risk Management -EEF/OPA -Planning Meetings and Analysis -Risk Management Plan(Methodology, Roles and Respon- -Risk Breakdown Structure (RBS): Contains the Risk Catego-
-Cost Management plan sibilities, Budgeting, Timing, Risk categories, Def of Risk ries and not the risks
-Schedule Management probability and impact, Probability/Impact matrix, Revised
plan stakeholder’s tolerance, Reporting formats, tracking)
-PSS

Identify Risks -Risk Mgmt Plan -Documentation reviews -Risk Register -Delphi technique is a way to get opinions and ideas from
-PM Plan -Information Gathering Techniques (Brainstorm- experts. It uses a facilitator, just like brainstorming sessions.
-EEF/ OPA ing, Delphi Technique, Expert Interviews, Root -Documentation reviews is when you look at OPA and any
-PSS cause Identification) documents to squeeze any possible risk out of them.
-SWOT analysis -Assumptions analysis is when we look as project assumptions
-Assumptions analysis
-Checklist analysis (RBS)
-Diagramming techniques(Ishikawa or
Flowcharts)
-Expert Judgment

Perform Qualitative Risk -OPA -Risk data quality assessment -Updated Risk Register -Qualitative risk analysis helps you prioritize each risk and
Analysis -Risk Register -Risk urgency assessment figure out its probability and impact
-Risk Mgmt Plan -Risk probability and impact assessment
-PSS -Probability and impact matrix
-Risk categorization

Perform Quantitative Risk -OPA -Interviewing -Updates Risk Register -Monte Carlo: run project risks thorough medling programs to
Analysis -Risk Register -Probability Distribution show risk effect
-PM Plan -Expert Judgment -Tornado: shows how sensitive each analyzed area of the
-Risk Mgmt Plan -Sensitivity Analysis project is to risk.
-PSS -Expected Monetary value analysis
-Modeling and simulation (Monte Carlo)
-Decision Tree Analysis
-Tornado Diagram

Plan Risk Responses -Risk Register Negative risks: isk Register updates -Residual risks: those that remain after risk responses have
-PM Plan 1.Avoid -Risk-related Contract Decisions been implemented.
2.Mitigate -PM Plan updates -Secondary risks: risks that come from a response to another
3.Transfer -Project Document updates risk
4.Accept -Exploit: remove any uncertainty and try to make it happen.
Positive risks
1.Exploit
2.Share
3.Enhance
4.Accept
-Contingent Response Strategies
-Expert Judgment

Monitor & Control Risks -Risk Register -Risk reassessment -Risk Register updates
-PM Plan -Variance and trend analysis -PM Plan updates
-Work Performance -Reserve analysis -Change Requests
Information -Risk Audits -OPA updates
-Performance Reports -Technical Performance measurement -Project Document updates
-Status meetings

Project Procurement Management


Process Input Tools and Techniques Output Notes
Plan Procurements -Scope Baseline -Make or Buy Analysis -Procurement Mgmt Plan Fxed Price contracts:
-Requirements Documentations -Expert judgment -Procurement SOW -FP
-Teaming agreements -Contract Types -Make-or-Buy decisions -Fixed Price plus Incentive Fee (FPIF)
-Risk Register -Procurements documents -Firmed Fixed Price Contract is the one most widely used.
-Risk-Related Contract Decision -Source selection criteria Cost-reimbursable contracts:
-Activity Resource Requirements -Change requests -Costs plus fixed prices(CPFF)
-Project Schedule -Cost plus percentage of costs (CPPC)
-Activity Cost Estimates -Cost plus incentive fee (CPIF)
-Cost Performance Baseline Time and Materials (T&M)
-EEF/OPA Point of Total Assumption (PTA) =
Target Cost+(celing price – target price) + company % share of cost
overrun

Conduct Procurements -PM Plan -Bidder conference -Selected Seller(s) -Oligopoly: There are very few sellers and the actions of one seller
-Procurement Documents -Proposal evaluation techniques -Procurement contract award will have a direct effect on the other seller’s prices and the overall
-Source Selection Criteria -Independent estimates -Resource calendars market condition.
-Qualified Seller list -Expert Judgment -Change requests
-Seller Proposals -Advertising -PM plan updates
-Project Documents -Internet search -Project document updates
-Make-or-Buy decisions -Procurement negotiations
-Teaming Agreements
-OPA

Administer Procurements -Procurement Documents -Contract change control systems -Procurement documentation
-PM plan -Procurement performance reviews -OPA updates
-Contract -Inspections/audits -PM plan updates
-Performance Reports -Performance reporting -Change requests
-Approved change requests -Payment systems
-Work performance information -Claims administration
-Records Management system

Close Procurements -PM plan -Procurement Audits -Closed Procurements


-Procurement documents -Negotiated Settlements -OPA updates
-Records Management Systems

Initiation Planning Execution Monitoring and Controlling Closing


Project Communications Management
Process Input Tools and Techniques Output Notes
Identify Stakeholders -Project Charter -Stakeholder analysis -Stakeholder Management strategy (Stake- Stakeholder analysis techniques:
-EEF/ OPA -Expert judgment holder analysis matrix) -Power/Interest grid
-Procurement documents -Stakeholder register -Power/Influence grid
-Influence/Impact grid
-Salience model: power, urgency, and legitimacy of stakeholders

Plan Communication -EEF/ OPA -Communications Requirements Analysis -Comm. Mgmt Plan Communication channel = n(n-1)/2
-Stakeholder Register -Communications technology -Updates to project documents Ways of communication:
-Stakeholder Management strategy -Communication methods -Active listening
-Communication models -Effective listening
-Feedback
-Non-Verbal
-Paralingual comm. Is vocal but not verbal
-Communication Blockers

Distribute Information -OPA -Communication methods -OPA Updates(Project Reports Communication methods:
-PM Plan -Information distribution tools -Project Records -Informal Written: Emails, memos
-Performance Reports -Presentations, correspondence, etc -Formal Written: Contract, legal notices, project documents
-Stakeholder feedback -Informal Verbal: Meetings, discussions, phone calls
-Stakeholder Notifications -Formal Verbal: Speeches, mass communication, presentations
-Lessons learned)

Manage stakeholder -Stakeholder Register Communication methods(Face-to-face -Resolved Issues -Face-to-Face meetings are the best communication methods to use
expectations -Stakeholder Management meetings) -Approved Corrective Actions where stakeholders issues are concerned.
Strategy -Interpersonal skills -Approved Change Requests
-OPA -Updates to OPA, PM Plan
-PM Plan
-Issue Log
-Change log

Report Performance -PM Plan: performance baseline -Variance Analysis -Performance Reports -Important note in Report Performance is that Performance Reports
-Work performance information -Communication methods -Change Requests are actively pushed to stakeholders rather than waiting for them to
-Work performance measurements -Reporting Systems -Updates to OPA pull them down.
(CV, SV, CPI, SPI) -Forecasting methods(ETC,EAC)
-Budget forecast
-OPA

Human Resources Management


Process Input Tools and Techniques Output Notes
Develop Human Resource -Activity Resource Requirements -Networking -Human Resource Plan (Staffing Manage- -List, spreadsheets) of positions, roles, and reporting matrix Based
Plan -EEF/OPA -Organization Charts and Positions Descrip- ment Plan). Contains Project Organization Charts (i.e. RAM/RACI)relationships: They have varying designs
tions Charts, Roles and Responsibilities, release based on the need of the project or OPA
-Organizational Theory plan, and training needs.

Acquire Project Team -PM Plan(HR Plan) -Pre-assignments -Project Staff assignments -Negotiations is the most important in T&T
-EEF/OPA -Negotiations -Resource Calendar -Pre-assignment is when you already build assignment in the HR plan
-Acquisitions -PM Plan updates because some team members are already assigned to you
-Virtual Teams -Virtual teams is when team members don’t all work in the same
location
-Resource availability tells the company when the team members will
be available once released from project

Develop Project team -Project Staff Assignments -Interpersonal Skills -Team Performance Assessment Five kinds of power:
-PM Plan -Training -EEF updates -Reward power, Expert power, Referent power, Punishment
-Resource Calendar -Team Building Activities power(coercive), legitimate power
-Ground rules Team Motivation:
-Co-location -Maslow’s hierarchy of needs (you can’t achieve higher needs until
-Recognition and Awards you’re satisfied with the lower ones)
-Herzberg’s Motivation-Hygiene Theory: satisfying personal life, good
paycheck
-McGregor’s Theory X and Theory Y: Theory X distrusts team mem-
bers. Theory Y manager trusts team members
-Expectancy Theory: need to give people an expectation of a reward
in order to motivate them, but it only works if the award is achievable.
-McLelland’s Achievement Theory(Theory of three needs): says that
people need achievement, power, and affiliation to be motivated
-Ouchi’s Theory of – “Z Theory”: Productivity can be increased by
how well the workers and management get along and trust each
other. Japanese style of management
-Vroom’s Expectancy Theory
-Contingency Theory: In stressful times, task-oriented leader will be
more effective, while in relatively calm times a relationship-oriented
leader will function more effectively.
Leadership styles:
-Autocratic: Strong style. PM makes all decisions
-Bureaucratic: Pm gathers input from team members and attempt to
gather multiple considerations before making a decision
-Democratic
-Lassiez-faire: “hands-off” style that only interferes if needed

Manage Project Team -Project Staff Assignments -Observation and Conversation -Change Requests Conflict Management techniques:
-PM Plan -Project Performance Appraisals -PM Plan updates -Problem solving: also called Confronting. It’s a Win-Win situation
-Team Performance Information -Conflict Management -EEF updates -Compromising: Lose-Lose method
-Performance Reports -Issue Log -OPA updates -Withdrawal: Lose-Leave method
-OPA -Interpersonal Skills -Smoothing Lose-Yield method
-Forcing: Win-Lose method