You are on page 1of 4
(By-law 3 (1) (a), 12 (1), 19 (2), 21 (2), 26 and 29) Half the fees set out below shall be in respect of plans for buildings used exclusively for places of religious worship, schools or for charitable purpose. 1. Fees for the consideration of plans submitted for approval in New buiénes [First Schedule} First Screpute FEES FOR CONSIDERATION OF PLANS, PERMITS, ETC. respect of new buildings shail be calculated as follows: Ground Floor... .. $7.00 per every 9 square mietres or part thereof subject to a minimum of $70.00 IstFloor .. .. .. $6.00 per every 9 square metres or part thereof subject to a minimum of $60.00 2nd Floor.. =. ++ $5.00 for every 9 square metres or part thereof subject to a minimum { of $50.00 3rdFloor.. .. .. $4.00 for every 9 square metres or part thereof subject to a minimum of $40.00 4th Floor and above or $3.00 for every 9 square metres or basement storey (other part thereof subject to a minimum than an open basement) of $30.00 2. In respect of plans of a building submitted for approval on a temporary year to year basis and tentative sketch plans submitted i for approval in principle, onc half of the fee spcified in paragraph 1 shall be payable. i 3. For plans submitted for approval of a shed type of building shesswin 4 having all its sides open, one half of the feed specified in paragraph °°" "** 1 shall be payable. 4. For plans submitted for approval of basement exceedings 2.5 open buewens. metre in height which are open on all sides (excepting where retaining walls occur) one haif of the fees specified in paragraph 1 shall be payable. 5. For every building of the warehouse or godown class of which using ot no part is intended for habitation (other than provision for a“ ‘* watchman) and which is not constructed in reinforced concrete or structural steel, one half of the fees specified in paragraph 1 shall be payable. 6. (1) For plans submitted for approval of alterations to existing areions 0 buildings, one half of the fees specified in paragraph 1 shall be "=== payable. 91 {First Schedule] (2) If the alterations to an existing building are generally spread over the whole area of the building, then the fee payable shall be computed on the whole area of the building, but if a clear subdivision of the building is not affected by the alteration scheme, such unaffected subdivision shall be excluded from the area on which the fee shall be computed. (3) Hf-a storey of any existing building) is not affected by alteration to the building, such storey shall be excluded from the areas on which the fee payable for the alterations shall be ‘computed: ‘ (4) If alterations to an existing building involve an alteration to the frontage line or elevation to a street (where such elevation abuts a street) the following fees shall be paid on submission of plans for such alterations in addition to the fees payable under subparagraphs (1), (2) and (3) of this paragraph: {a) alterationstofrontageline .. $18.00 per storey (b) alterations to street elevation... $18.00 per storey (5) Where the alterations to an existing building involve only subdivision of rooms into smaller rooms, the fees payable on submission of plans for such alterations shall be $25.00iper smaller room or cubicle. ‘mures-titys, 7. For plans submitted for approval of wharves bridges, or other “ special buildings, the fee payable shall be $25.00 per 9 square metres or part thereof. eaning vats. 8, For plans submitted for approval of retaining walls, the fee payable shall be $3.00 per 9 square metres or part thereof, of its, total elevational area measured from the top of the footings. sesserson 9. For a series or row of buildings of the same plan and materials sitsides” when plans are submitted for approval at the same time, a deduction of the fees specified in the preceding paragraphs shall be made on the following basis first building... -. -.-- s+ full fees 2nd to Sth building (inclusive) * 90% of fees 6th to 10th building me 85% of fees 11th to 25th building fous 2. 15% of fees 26th and above building... .. 4. 60% of fees ‘Aameninest 10. (1) When an amendment plan to. an approved plan is meer, submited for approval, a fee of $60.00 shall be payable for each such amendment plan. (2) If an amendment to an approved plan involves additional area, then such additional area shall be charged on the basis set ‘out in paragraph 1 in addition to the fee specified in subparagraph (1) of this paragraph. [First Schedule] {G) If the amendments to an approved plan ate in the opinion of the local authority substantial, a fee equal to one half ef the foe {hargeable under paragraph 1 in respect of the approved plan shall be payable in addition to any fees payable under subparagraphs (1) and (2) of this paragraph. fecal) (At approved plan may be inspected in the office of the mci focal authority subject to the payments of the prescribed fee tame (2) ‘An approved plan may be copied in the office of the local authority subject to the applicant submitting with his application ‘0 copy such plan the written consent of the owner of the building, (3) The fecs payable shall be as follows: (i) for inspecting an approved plan... $ 50.00 per set of plans Gi) for copying an approved : pln... $100.00 per set of plans (4) ‘The fee for an endorsement by the local authority to certity SnY Copy as a true copy of an approved plan shall be $50.00 per copy. falloee®® 12F PePmits issued under by-law 18 shall be payable as remis tr follows: ou is for minor erections, alterations and ote additions under “paragraph (1) thereof and for erection of any fence ‘under paragraph (2)thereof .. $50.00 per permit » J, The following fees shall be payable for the temporary permits Temporary issued under byaw 19: . pe (@) shedforshows .. .. ., $50.00 per day (6) place forworship —.... $20.00 per day (€) depositing building materials on streets with the consent of the local authority... .. $18.00 per sq. metre per month or part thereof (d) builder's working shed store or other shed in connection with new buildings... .--. $100.00 per shed per 6 months or part thereof (6) scaffolding erected ona street .. $5.00 per scaffold pole per month or part thereof (f) staging, framework, platform or temporary structure of any kind erected on a roof abutting a street... $50.00 per month or part thereof, 93

You might also like